BLD-Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
DOC - Permit Finaled | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | DONE |
Tony Young
|
|
|
Garage Code: 6365 FYI - House furnishing is for staging only. Phone #: ###-#### Inspection requested via web by Jessica Bradley// 4.
|
BLD-Final | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | NR |
Tony Young
|
|
|
Garage Code: 6365 FYI - House furnishing is for staging only. Phone #: ###-#### Inspection requested via web by Jessica Bradley// needs mech final to pass 1st
|
BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | NR |
Tony Young
|
|
|
Garage Code: 6365 FYI - House furnishing is for staging only. Phone #: ###-#### Inspection requested via web by Jessica Bradley// needs mech pass,, fire caulking
|
PubWorks Occupancy Approval | 11/27/2019 | 11/27/2019 | 11/27/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Wall Bracing | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD-Energy code compliance | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD-Framing/Rough-in | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley,, corrections needed,, ok to insulate
|
BLD-Wall Bracing | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Tony Young
|
|
|
Re-inspection Phone #: ###-#### Inspection requested via web by Jessica Bradley,, needs to be completed per plan
|
BLD-Wall Bracing | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley,, re-nail all shear,, too much missing
|
BLD-Foundation | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PART |
Tony Young
|
|
|
Edgar-pour time 1:00 Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 3/21/2019 | 3/21/2019 | 3/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 2/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/13/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 2/5/2019 | 2/5/2019 | 2/13/2019 | | DONE |
Brian McGowan
|
|
|
Plan Mod to add retaining wall and change Geo Tech Firm
|
Routing - PLAN CHECK | 2/5/2019 | | 2/13/2019 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing PW Grading-Hillside | 2/5/2019 | | 2/6/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 2/5/2019 | | 2/5/2019 | | PASS |
Sue Cummings
|
|
|
Still good
|
Routing - PUBLIC WORKS | 2/5/2019 | | 2/5/2019 | | PASS |
Angela Hardy
|
|
|
|
CHANGE STATUS TO (REV) | | | 2/5/2019 | | DONE |
|
|
|
plan mod. status didn't change with plans assigned to
|
Plan Modification Accepted | | | 2/5/2019 | | DONE |
|
|
|
changing engineering for soils
|
OVERRIDE | | | 1/16/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 11/26/2018 | 11/26/2018 | 1/16/2019 | | DONE |
Brian McGowan
|
|
|
12/13 sfd L2 ePlan - 1st Review Complete - 3rd Corrections Required
|
Routing - PLAN CHECK | 1/16/2019 | | 1/16/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/16/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 1/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 1/14/2019 | | 1/14/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - PLAN CHECK | 1/7/2019 | | 1/7/2019 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 12/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/26/2018 | | 12/10/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 11/26/2018 | | 12/3/2018 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - Erosion and Sediment | 11/26/2018 | | 11/28/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Route to Impact Fee Review | 11/26/2018 | 11/29/2018 | 11/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 11/26/2018 | 11/26/2018 | 11/27/2018 | | PASS |
Lee G Meredith
|
|
|
New SFH Highlands Cove
Review passed as submitted.
|
Routing - MECHANICAL | 11/26/2018 | | 11/27/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 11/26/2018 | | 11/26/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 11/26/2018 | | 11/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/26/2018 | | 11/26/2018 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/26/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/26/2018 | | PASS |
|
|
|
|
Intake Approval | | | 11/20/2018 | | FAIL |
|
|
|
foundation sheet needs to have the engineer stamp
|
Application received | | | 11/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 15 2018 4:02PM
|