BLD-Aging Inspection | 7/18/2019 | 7/18/2019 | 7/19/2019 | | PASS |
Tell Riley
|
|
|
the permit final was passed on 3/5/19 by Jim Sly
|
BLD-Aging Inspection | 7/17/2019 | 7/17/2019 | 7/19/2019 | | PASS |
Tell Riley
|
|
|
|
BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Jim Sly
|
|
|
Contact Jim Hibbard Phone #: ###-#### Inspection requested via web by James Hibbard
|
FIRE-Final Inspection | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Contact Jim Hibbard Phone #: ###-#### Inspection requested via web by James Hibbard
|
FIRE-Final Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok for final when the project related fire alarm permit is finaled
|
FIRE-Final Inspection | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide final for the project related fire alarm permit and repair the emergency light.
Requesting final for fire life safety Jim Hibbard Phone #: ###-#### Inspection requested via web by James Hibbard
|
FIRE-Hydro test above ground | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | CANC |
Troy Cobbley
|
|
|
wrong inspection type scheduled
|
BLD-Ceiling Grid Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Jim Sly
|
|
|
Please see Jim Hibbard Phone #: ###-#### Inspection requested via web by James Hibbard
|
Inspection Record Card- Bld | | | 1/23/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/7/2019 | 1/7/2019 | 1/8/2019 | P | PASS |
Jim Sly
|
|
|
Jim Hibbard with EKC Construction Phone #: ###-#### Inspection requested via web by James Hibbard
|
Issue PAID IN FULL permit | | | 1/4/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 11/19/2018 | 11/19/2018 | 12/5/2018 | | PASS |
Joe Bruce
|
|
|
12/05 (L2) - SW ID JATC Classroom Remodel (ePlan)
|
Routing - PLAN CHECK | 11/19/2018 | | 12/5/2018 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 12/5/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/5/2018 | | DONE |
|
|
|
NEED
GC
Rev cert of val
|
Routing - PUBLIC WORKS | 11/19/2018 | | 11/19/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 11/16/2018 | | FAIL |
Joe Bruce
|
|
|
1. Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. See ePlan Submittal Standards: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
|
Intake Approval | | | 11/16/2018 | | PASS |
Joe Bruce
|
|
|
|
Application received | | | 11/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 15 2018 8:02PM
|