Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-04192
StatusFinaled
Name AURIC SOLAR
Site Address 1920 S MAYFLOWER WAY
Project Name176705 - Maxfield
Customer Number 
ePlanReviewYes
Description
***04/25/19 PLAN MOD to relocate 20 panels from original location on main house to shed out building.*** Permit for a 1172 sq ft, Auric Roof Mounted Grid Tied Solar Panel system with Micro-Inverters; 67 panels in 3 arrays consisting of 25 panels, 20 panels and 22 panels tying into existing electrical panel. No structural alteration is required per stamped and signed engineer's Evaluatlion Letter. All work per plans, manufacturer's specs, engineering data and local code. Separate electrical permit is required. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20195/10/20195/10/2019ADONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Rob Maes
DOC - Permit Finaled5/10/20195/10/20195/10/2019PPASS
DetailsMike Jordan
Permit Ready to Issue  5/9/2019 DONE
plan mod approved.
CHANGE STATUS TO (ISS)  5/9/2019 DONE
(F) Reprint permit  5/9/2019 DONE
Inspection Record Card- Bld  5/9/2019 DONE
Plan assigned to (RDP)4/24/20194/24/20195/8/2019 DONE
DetailsRob Patrick
05/01 PV Plan Mod...04/25 Failed; need shed roof analysis
Routing - PLAN CHECK5/8/2019 5/8/2019 PASS
DetailsRob Patrick
Please add 1 hour of review time.
Routing - PLANNING5/1/2019 5/1/2019 PASS
DetailsSue Cummings
Routing - PLAN CHECK4/25/2019 4/25/2019 FAIL
DetailsRob Patrick
Need shed roof analysis.
Routing - PLANNING4/24/2019 4/24/2019 PASS
DetailsSue Cummings
Plan Modification Accepted  4/24/2019 DONE
Requested by Ashley of Auric.
BLD-Framing/Rough-in4/22/20194/23/20194/23/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Rob Maes
Issue PAID IN FULL permit  11/20/2018 DONE
(F) Reprint permit  11/20/2018 DONE
Plan assigned to (RDP)11/19/201811/19/201811/19/2018 DONE
DetailsRob Patrick
11/22 Auric Solar
Plan assigned to (JAB) Josh11/16/201811/16/201811/19/2018 DEFR
DetailsJosh Bogle
11/22 Auric Solar
Routing - PLAN CHECK11/19/2018 11/19/2018 PASS
DetailsRob Patrick
1st review completed  11/19/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  11/19/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  11/19/2018 DONE
Application received  11/16/2018 DONE
Application submitted via PDS Online on Nov 16 2018 10:24AM
Plans ACCEPTED BY PLAN TECH  11/16/2018 DONE
Recd Pcfee & Taken To Pln CK  11/16/2018 DONE
no intake fee taken, 406
Intake Approval  11/16/2018 PASS
Routing - PLANNING11/16/2018 11/16/2018 PASS
DetailsSue Cummings