Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-04211
StatusFinaled
Name BOYD REMODELING AND CONSTRUCTION LL
Site Address 10556 W SOUTHERLAND DR
Project NameHeppler patio awning
Customer Number 
ePlanReviewNo
Description
*PLAN MODIFICATION PATIO NOW 324SQ' 12/6/18 JJN* Permit for 336sq' (12’x28’) framed patio cover. All work per plans & local code. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/5/20193/6/20193/6/2019APASS
DetailsMike Jordan
please call for garage code Phone #: ###-#### Inspection requested via web by anthony boyd
DOC - Permit Finaled3/6/20193/6/20193/6/2019PPASS
DetailsMike Jordan
BLD-Final2/21/20192/21/20192/21/2019PFAIL
DetailsMike Jordan
Plans are inside shop. Please call for key code to get in to shop Phone #: ###-#### Inspection requested via web by anthony boyd. Provide code compliant steps and landing from back door.
BLD-Framing/Rough-in1/9/20191/10/20191/10/2019APASS
DetailsMike Jordan
Plans were in a black bag under the patio cover. I pulled them out but if not there one of my guys may put them back in the black bag. Thanks Phone #: ###-#### Inspection requested via web by anthony boyd
BLD-Framing/Rough-in1/8/20191/8/20191/8/2019PFAIL
DetailsBrandon Shaw
No plans or truss Engineering on site...
BLD-Footing12/12/201812/13/201812/13/2018APASS
DetailsBrandon Shaw
Todd Phone #: ###-####
Plan assigned to (J_N)12/6/201812/6/201812/6/2018 DONE
DetailsJenny Nelson
Routing Walk-In (BLD)12/6/201812/6/201812/6/2018PDONE
DetailsJenny Nelson
Routing Walk-In (Zoning)12/6/201812/6/201812/6/2018PPASS
DetailsColleen T Carroll
Routing - PLAN CHECK12/6/2018 12/6/2018 PASS
DetailsJenny Nelson
Case Summary (BLD)  12/6/2018 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/6/2018 DONE
met
Plan resubmittals received  12/6/2018 DONE
CHANGE STATUS TO (RDY)  12/6/2018 DONE
didnt mean to turn it back to REV, added plans assigned to task
Issue PAID IN FULL permit  12/6/2018 DONE
Plan assigned to (J_N)11/19/201811/19/201811/20/2018 DONE
Details
11/23 Patio cover paper
Routing PW Flood Plain11/19/2018 11/20/2018 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing - PLAN CHECK11/19/2018 11/20/2018 PASS
Details
1st review completed  11/20/2018 DONE
DetailsJenny Nelson
Case Summary (BLD)  11/20/2018 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/20/2018 DONE
DetailsJenny Nelson
ESC no Energy no
Permit Ready to Issue  11/20/2018 DONE
Inspection Record Card- Bld  11/20/2018 DONE
Telephone call  11/20/2018 DONE
left message for anthony that permit is ready and the fee amount due
Routing Walk-In (Zoning)11/19/201811/19/201811/19/2018PDONE
DetailsSue Cummings
Routing Walk-In (BLD)11/19/201811/19/201811/19/2018PPASS
DetailsJenny Nelson
Took in as L2 for floodplain review.
Application received 11/19/2018