BLD-Final | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Tony Young
|
|
|
Chris Phone #: ###-####,, c/n made ok on building code related issues
|
DOC - Permit Finaled | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | FAIL |
Tony Young
|
|
|
Chris Phone #: ###-####,, c/n posted,, fire caulking, drainage away, self closing hinges, clean and seal up the crawl,, handrail up stairs,, NOTE// UPSTAIRS IS NOT LIVING SPACE.. also noted that the blower door tests are 5.7 and 5.9,, above max 4.0
|
BLD-Energy code compliance | 10/11/2019 | 10/14/2019 | 10/15/2019 | A | PASS |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Energy code compliance | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Tony Young
|
|
|
Chris Phone #: ###-####,, frame corrections not completed
|
BLD-Framing/Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Tony Young
|
|
|
Chris Phone #: ###-####,, strap plate in front room,, NOTE.. shear inspection was not called in,, covered now with siding
|
Routing - MECHANICAL | 8/6/2019 | | 8/6/2019 | | PASS |
Troy James
|
|
|
New manual j report for duplex
|
Routing Walk-In (BLD) | 8/2/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
|
|
|
|
BLD-Wall Bracing | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Tell Riley
|
|
|
chris Phone #: ###-####//ok per plans//need to add straps on interior side of PFH//
|
(F) Reprint permit | | | 4/29/2019 | | DONE |
|
|
|
|
Place hold on job | 4/26/2019 | | 4/29/2019 | | DONE |
Brittany Hill
|
|
|
No inspections until Hornet Construction has turned in a 302 for and pay the fee for changing GC. see email from owner in the documents.
|
Meeting | | | 4/26/2019 | | DONE |
|
|
|
Owner is changing GC's. going from Integrity LLC to Hornecto Construction. See email in documents
|
Telephone call | | | 4/25/2019 | | DONE |
|
|
|
Helen called to change GCs. Told her to email permits with new GC info and have new GC submit GC form
|
BLD-Footing | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru work in progress,, 1/2 complete
|
Issue PAID IN FULL permit | | | 1/9/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/8/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/8/2019 | | DONE |
|
|
|
Speak with Jim to inform him the permit is ready and what fees are due.
|
Plan assigned to (M_H) | 11/20/2018 | | 1/8/2019 | | DONE |
Michael Hanson
|
|
|
12/07 #402 L2 Paper. 1st review completed - See building plan review for corrections required. MDH
|
Routing - PLAN CHECK | 1/8/2019 | | 1/8/2019 | | PASS |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 1/8/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/8/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 1/7/2019 | | DONE |
|
|
|
Two copies of ES Packets, two copies of sheetsA6.0, A5.0 AND A1.0. TAKEN TO MICHAEL
|
Routing - PLAN CHECK | 12/5/2018 | | 12/18/2018 | | FAIL |
Michael Hanson
|
|
|
See building plan review #2 for corrections required. MDH
|
Plan resubmittals received | | | 12/18/2018 | | DONE |
|
|
|
Two copies of trust details documents, two copies of plan sheet C1,A1, A4, A5 and A6. took to michael
|
Routing - PLAN CHECK | | | 12/5/2018 | | FAIL |
Michael Hanson
|
|
|
See building plan review for corrections required. MDH
|
Routing - PUBLIC WORKS | | | 12/5/2018 | | PASS |
|
|
|
|
1st review completed | | | 12/5/2018 | | FAIL |
Michael Hanson
|
|
|
See building plan review for corrections required. MDH
|
Routing - MECHANICAL | 11/20/2018 | | 11/29/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/20/2018 | 11/23/2018 | 11/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | | | 11/21/2018 | | PASS |
|
|
|
Required to fence both side yards.
|
Routing - Addressing | 11/20/2018 | | 11/20/2018 | | PASS |
Doug Chausow
|
|
|
2nd address for complex: 4940 W Willow Ln.
|
Plans ACCEPTED BY PLAN TECH | | | 11/20/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/20/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/20/2018 | | DONE |
|
|
|
|
Application received | | 11/20/2018 | | | |
|
|
|
|