BLD-Final | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Adicus Phone #: ###-####
|
DOC - Permit Finaled | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.16 & 4.67
|
BLD-Energy code compliance | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Jim Storey
|
|
|
Aticus Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PART |
Brandon Shaw
|
|
|
Hold downs to be installed brfore framing rough-in...
|
BLD-Footing | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Jim Sly
|
|
|
Atticus or concrete Dan ###-#### Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/25/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/18/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 1/11/2019 | 1/11/2019 | 1/18/2019 | | DONE |
Jenny Nelson
|
|
|
01/30 sfd L2 ePlan. 1st complete 01/17, wall bracing deficiencies, provide UL for fire wall
|
Routing - PLAN CHECK | 1/18/2019 | | 1/18/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/18/2019 | | DONE |
|
|
|
|
1st review completed | | | 1/17/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 1/11/2019 | | 1/17/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - Addressing | 1/11/2019 | | 1/17/2019 | | PASS |
Doug Chausow
|
|
|
North building address: 2201 S Wyoming Ave
South building address: 2203 S Wyoming Ave
|
Routing - PUBLIC WORKS | 1/11/2019 | | 1/17/2019 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 1/11/2019 | 1/14/2019 | 1/14/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 1/11/2019 | | 1/14/2019 | | PASS |
David Moser
|
|
|
OK as per CAA18-00221
|
Routing - MECHANICAL | 1/11/2019 | | 1/11/2019 | | PASS |
Troy James
|
|
|
|
Meeting | | | 1/11/2019 | | DONE |
|
|
|
Emailed Thomas informing him that we need to know what the demo value is since it is part of this permit and the value on the application is for the new build only
|
Meeting | | | 1/11/2019 | | DONE |
|
|
|
Thomas Whitworth emailed over the value for demo
|
Plans ACCEPTED BY PLAN TECH | | | 1/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/31/2018 | | FAIL |
|
|
|
12/31/18-CAN NOT submit building permit until CAA has gone through the appeal period. Please do not sign off on your task until after Jan 10, 2019 after 5:00 pm thanks a lot Candy
|
Intake Approval | | | 12/28/2018 | | FAIL |
|
|
|
Informing you that we are adding the demo of the existing house to this permit. The approval period for CAA18-00221 ends January 10 at 5pm, therefore we cannot accept submission until after that time. For questions about the appeal period, please contact David Moser at ###-####.
|
Meeting | | | 12/28/2018 | | DONE |
|
|
|
See MIS18-00479 for future demo of existing SF dwelling. Duplex will be constructed in its place.
|
Intake Approval | | | 12/26/2018 | | FAIL |
|
|
|
12/26/18 CAA18-00221 is showing as being applied for, but not approved and has not gone through the appeal period. This will need to be done before the new building permit can be applied for. It is also showing in our system that a demo permit has not been applied for. However, if you are wanting for the demo to be apart on the new construction the demo value will need to be included with the rest of your project value on the application.
|
Intake Approval | | | 12/10/2018 | | FAIL |
Christina Prado
|
|
|
Cannot accept until CAA process is completed, application in but not approved
|
Intake Approval | | | 11/26/2018 | | FAIL |
|
|
|
Please contact zoning for approval for duplex prior to submitting for a building permit. (###-#### and ask for a planner)
Our map shows there is a structure on this parcel, please apply for a demo permit or include the demo value (we can include both on this permit).
|
Application received | | | 11/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 20 2018 11:50AM
|