Routing Off Site - STRUCTURAL | 12/6/2018 | | 12/20/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
First Notice | 9/18/2019 | 9/18/2019 | 10/29/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 11-1
|
BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Brandon Shaw
|
|
|
shell ; Core building final Phone #: ###-#### Inspection requested via web by J.C. Murray
|
DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Letter of compliance/Occupancy | | | 9/18/2019 | | DONE |
|
|
|
|
Zoning Approval | 9/12/2019 | 9/12/2019 | 9/12/2019 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Mark Scharfen
|
|
|
Vanilla finish. Passed inspection. No occupancy on this permit.
fire/life ; safety, shell/core building Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Jim Storey
|
|
|
Chad Phone #: ###-#### pending roof r30 at crickets.
|
BLD-Energy code compliance | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PART |
Jim Storey
|
|
|
requested via mobile web by Mike Tracy foam main deck r 30 ok pending resolve on overbuilds as to access and insulation.
|
BLD-Energy code compliance | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | NR |
Jim Storey
|
|
|
requested via mobile web by Mike Tracy
|
BLD-Energy code compliance | 5/20/2019 | 5/20/2019 | 5/20/2019 | A | CANC |
Jim Storey
|
|
|
requested via mobile web by Mike Tracy
|
BLD-Framing/Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Jim Storey
|
|
|
Call prior to going Phone #: 2088032242 >> Inspection requested via mobile web by Mike Tracy roof and walls nailling ok
|
BLD-Foundation | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PART |
Jim Storey
|
|
|
Matt-wall Phone #: ###-#### placed w/si
|
BLD-Foundation | 4/4/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Dave Hannah
|
|
|
Joe or call Matt ###-#### Phone #: ###-####
|
Inspection Record Card- Bld | | | 4/1/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/1/2019 | | DONE |
|
|
|
|
Meeting | | | 3/29/2019 | | DONE |
|
|
|
informed ryan drew that we are still waiting for the gc to state the RP and to turn in the 302 and 306 forms for us to add in the rest of the permit fees
|
OVERRIDE | | | 2/13/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 12/6/2018 | 12/6/2018 | 2/13/2019 | | PASS |
Joe Bruce
|
|
|
(3rd Rev Comp) 01/07 - (502) Broadway & Beacon Bldg (PW)
|
Plan Reviewer's activity | | | 2/13/2019 | | DONE |
Joe Bruce
|
|
|
Address has been established to be 1129 S Broadway Ave. **JHB** Brian Murphy received letter with 1129 S Broadway Ave. on Appendix "J"
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
ALL MET
NEED
RP
MET RYAN@LARSONARCHITECTS.BIZ
GC FORM
REVISED VALUE
ACHD
|
Plan resubmittals received | | | 2/12/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing PW Drainage | 2/12/2019 | | 2/12/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals requested | | | 2/8/2019 | | FAIL |
Joe Bruce
|
|
|
Need appendix "J" signed and notarized from the owner. **JHB**
|
Routing PW Drainage | 2/7/2019 | | 2/7/2019 | | FAIL |
Brian Murphy
|
|
|
NEED APND J
|
Plan Reviewer's activity | | | 2/6/2019 | | DONE |
Joe Bruce
|
|
|
Waiting on appendix 'J' from the applicant to approve PW Drainage review by Brian Murphy. **JHB**
|
Routing PW Sewer Design | 1/25/2019 | | 1/30/2019 | | PASS |
DeAnn Brown
|
|
|
|
Plan Reviewer's activity | | | 1/30/2019 | | DONE |
Joe Bruce
|
|
|
Contacted applicant and had them send civil drawings that they forgot to upload for resubmittal. **JHB**
|
Plan resubmittals received | | | 1/30/2019 | | DONE |
Joe Bruce
|
|
|
Received sheet C1 and C2 from Ryand Drew. Uploaded into ePlan. **JHB**
|
Plan resubmittals received | | | 1/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing PW Drainage | 1/25/2019 | | 1/18/2019 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 1/14/2019 | | 1/18/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks in eplanreview.
|
Plan resubmittals requested | | | 1/18/2019 | | FAIL |
Joe Bruce
|
|
|
See comments from Public Works Drainage and Sewer Design. **JHB**
|
Routing PW Street Lights | 1/14/2019 | | 1/15/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 1/14/2019 | | 1/15/2019 | | PASS |
Evan Carpenter
|
|
|
Sharing solid waste service with adjacent property.
|
Routing - PLAN CHECK | 1/11/2019 | | 1/15/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - PUBLIC WORKS | 1/11/2019 | | 1/14/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 1/11/2019 | | 1/14/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Environmental | 1/14/2019 | | 1/14/2019 | | PASS |
Rick Christenson
|
|
|
Plans show Exterior Grease Interceptor with GW lines. Will need updated when plumbing fixtures installed to verify connection to GW line.
|
Plan resubmittals received | | | 1/11/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 1/7/2019 | 1/10/2019 | 1/8/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/6/2018 | 12/6/2018 | 1/7/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 1/7/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 1/7/2019 | | DONE |
Joe Bruce
|
|
|
Sent ePlan case back to Architect. **JHB**
|
Routing - PLAN CHECK | 12/6/2018 | | 1/7/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 12/6/2018 | | 12/10/2018 | | PASS |
Troy James
|
|
|
No HVAC work shown at this time. Gas piping to future RTU's only.
|
Routing - Design Review | 12/6/2018 | | 12/10/2018 | | FAIL |
Andrea Tuning
|
|
|
The site plan and landscape plan will be required to match one another.
Install 1 Class II or Class III street tree along Broadway Avenue. This tree shall be located within the 8-foot planting zone between the curb line and the sidewalk.
Install 3 Class II or Class III trees along Beacon Street. These trees shall be located within the 8-foot planting zone between the curb line and the sidewalk.
Widen the terminal planters located on the west side of the building to be a minimum of 8-feet in width (measured inside of curb to inside of curb) and include the required landscaping which will include a Class II tree and low growing shrubs or other approved ground cover.
All plantings located within the vision triangle shall be less than 3-feet in height and tree canopies should be a minimum of 6-feet in height.
If the applicant wishes to utilize tree grates within the pedestrian realm, the applicant should provide grates that are a minimum of 4-feet by 8-feet and meets all ADA standards.
|
Routing - Addressing | 12/6/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
Per Brian Murphy, changed address back to Broadway address.
|
Routing - PUBLIC WORKS | 12/6/2018 | | 12/7/2018 | | FAIL |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/6/2018 | | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed prior to ground disturbing activities.
|
Routing - PLUMBING | 12/6/2018 | | 12/7/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 12/6/2018 | | 12/6/2018 | | PASS |
David Moser
|
|
|
see DRH18-00228
|
Intake Approval | | | 12/4/2018 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by JHB
|
Intake Approval | | | 12/3/2018 | | FAIL |
Joe Bruce
|
|
|
1) (The following sheets do not have the space for the approval stamp: (C1, C2, ESC1, S1.1, S2.1, S8.1, and S9.1) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. See our EplanReview standards at this link: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2) Verification of Legal Lot or Parcel Form shall be signed by the Planning and Zoning department for approval. Please contact Colleen Carroll at ###-####, ccarroll@cityofboise.org
|
Intake Approval | | | 11/30/2018 | | FAIL |
Joe Bruce
|
|
|
1) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. See our EplanReview standards at this link: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2) Provide Soils and Geotech report as noted on the checklist. This document could not be found in the documents folder.
3) Provide Verification of Legal Lot or Parcel Form as noted on the checklist. This document could not be found in the documents folder.
4) Provide Site Specific Fire Flow at Hydrants as noted on the checklist. This document could not be found in the documents folder.
5) Provide Planning and Zoning Letter(s) of approval as noted on the checklist. This document could not be found in the documents folder.
6) Sheet C2 does not contain the ESC Plans. Upload the ESC plans as required by the checklist.
|
Application received | | | 11/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2018 2:14PM
|
Routing PW Drainage | 1/14/2019 | | 1/18/2018 | | FAIL |
|
|
|
SWALE 5.5 FEET FROM BLD ON PLAN VIEW 10 FEET ON DETAIL NEED STR. LETTER PLUS APPX J
|