Third Notice | | 5/12/2020 | 5/13/2020 | | DONE |
|
|
|
This permit finaled on the web by Ian Franklin
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/28/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Permanent Occupancy | | | 3/18/2020 | | DONE |
|
|
|
|
BLD-Final | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Mike Jordan
|
|
|
Ian Phone #: ###-####
|
PubWorks Occupancy Approval | 3/17/2020 | 3/17/2020 | 3/17/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | NR |
Jim Storey
|
|
|
Pierre Phone #: ###-#### need card signed pw and p$z
|
Zoning Approval | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Katelyn Menuge
|
|
|
Final
|
FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Ian Phone #: ###-####
|
Zoning Approval Temp | 3/3/2020 | 3/3/2020 | 3/3/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary-Can have final when all site improvements are complete.
|
BLD-Final | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Mike Jordan
|
|
|
|
BLD-Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Mike Jordan
|
|
|
Glen Phone #: ###-####
|
BLD-Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | NR |
Mike Jordan
|
|
|
permit BLD- 04291 would like a final lnspection as well Phone #: ###-#### Inspection requested via web by Glen Farrell
|
FIRE-Final Inspection | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | FAIL |
Troy Cobbley
|
|
|
Failed based on noted deficiencies: secondary gate needed opticon installed., tested and pavement, primary gate needed opticon tested and pavement installed, clearanced between AC unit ballard and fence was less than 20 foot required clearance north end of blding 2, site and blding addrss numbers/letters need to be provided as per discussion, provide most up to date review comments.
Glen Phone #: ###-####
|
PubWorks Occupancy Approval | 1/31/2020 | 1/31/2020 | 1/31/2020 | | DONE |
Mike Sheppard
|
|
|
|
Print Occupancy Form | | | 1/15/2020 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PASS |
Mike Jordan
|
|
|
fire wall inspection building one south end Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Framing/Rough-in | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | NR |
Jim Storey
|
|
|
south end building one Phone #: ###-#### Inspection requested via web by Glen Farrell need ele / call na.
|
BLD-Framing/Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Conference | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Mike Jordan
|
|
|
Discuss Firewall Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 8/13/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Mike Jordan
|
|
|
and footing inspection for building four BLD- 04290 Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/30/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Mike Jordan
|
|
|
north end building one Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Mike Jordan
|
|
|
Rebar inspcetion Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Mike Jordan
|
|
|
rebar inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PART |
Mike Jordan
|
|
|
rebar - pour around 12:30 // Glen Phone #: ###-####. work in progress. Will have special inspection.
|
BLD-Conference | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | DONE |
Mike Jordan
|
|
|
9:30 please Glen Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/17/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2019 | | DONE |
|
|
|
informed Kraig I would work on the fees, but to please let me know what the trades should be for each unit (gave the full project amount on those) also informed he we still need ACHD.
|
Expiration Notice | 5/9/2019 | 5/31/2019 | 5/9/2019 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/7/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
MET KRAIG@FOREGEBUILDINGS.COM
NEED
ACHD
MET
GC FORM
REVISED VALUE
|
Plan assigned to (CJW) | 12/7/2018 | 12/13/2018 | 5/6/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 01/10/18 (new - 25 days) (eplan - 27 sheets) Stor-it Self Storage Bldg 1 (routed to fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/3/2019 | | 5/6/2019 | | PASS |
Mark Scharfen
|
|
|
IFC review complete. Uploaded report. Passed IFC Review.
|
Routing - PLAN CHECK | 5/3/2019 | | 5/3/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 5/3/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/29/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/29/2019 | | DONE |
|
|
|
Failed resubm plan intake review. routed back to architect.
|
Plan resubmittals requested | | | 4/9/2019 | | DONE |
|
|
|
|
Routing - FIRE | 4/4/2019 | | 4/8/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 2nd review 04.08.2019.pdf uploaded. Emailed architect.
|
Routing PW Drainage | 4/5/2019 | | 4/5/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Drainage | 4/4/2019 | | 4/5/2019 | | FAIL |
Brian Murphy
|
|
|
need apdx j
|
Routing Off Site - STRUCTURAL | 4/4/2019 | | 4/5/2019 | | PASS |
Carl Westfall
|
|
|
Sidney Gold (KPFF)
|
Routing - PLAN CHECK | 4/4/2019 | | 4/4/2019 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural
|
Routing - Design Review | 4/4/2019 | | 4/4/2019 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 4/4/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/3/2019 | | DONE |
|
|
|
Failed plan intake and IBC resubmittal review
|
Plan resubmittals requested | | | 4/3/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/11/2019 | 1/14/2019 | 1/11/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/13/2018 | | 1/11/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 1/11/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/11/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/7/2018 | 12/13/2018 | 1/9/2019 | | FAIL |
Mark Scharfen
|
|
|
ATTACHED COMMENTS TO CASE AND EMAILED ARCHITECHT.
|
Routing Off Site - STRUCTURAL | 12/13/2018 | | 12/26/2018 | | FAIL |
Carl Westfall
|
|
|
Sidney Gold (KPFF)
|
Routing PW Drainage | 12/13/2018 | | 12/18/2018 | | FAIL |
Brian Murphy
|
|
|
have a late apendex j
|
Routing PW Solid Waste | 12/13/2018 | | 12/14/2018 | | PASS |
Evan Carpenter
|
|
|
Approved for commercial cart service.
|
Routing - Design Review | 12/13/2018 | | 12/14/2018 | | FAIL |
Andrea Tuning
|
|
|
45 degree parking stalls are required to be a minimum of 9-feet wide and 20-feet 5-inches in depth.
Pave all parking and drive aisles on 19 North Allumbaugh Street and 55 North Allumbaugh Street.
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/13/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 12/13/2018 | | 12/13/2018 | | PASS |
David Moser
|
|
|
See DRH17-00528
|
Routing - Addressing | 12/13/2018 | | 12/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Street Lights | 12/13/2018 | | 12/13/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 12/13/2018 | | 12/13/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan narrative and ESC site map are approved. Certified RP listed. Site preparation inspection is required at start of project.
|
Intake Approval | | | 12/7/2018 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H.
|
Intake Approval | | | 12/3/2018 | | FAIL |
Michael Hanson
|
|
|
The structural calculation did not upload properly. Please try to upload again.
S1 and ESC-1 are missing the stamp signed and dated.
|
Application received | | | 11/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2018 12:48PM
|