BLD-Final | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Brandon Shaw
|
|
|
We show online that final electrical passed, can you please stop by today and do the building inspection? See below. Thanks so much! view permit details ELE18-04601 Final 2/14/2019 2/20/2019 2/20/2019 A PASS Phone #: ###-#### Inspection requested via web by Brecklee Brown
|
DOC - Permit Finaled | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Plan assigned to (RDP) | 11/29/2018 | 11/29/2018 | 11/29/2018 | | DONE |
Rob Patrick
|
|
|
11/29 FAILED; Roof Plan & Attic Detail does not match aerial view of dwelling roof.
|
Plan assigned to (JAB) Josh | 11/27/2018 | 11/27/2018 | 11/29/2018 | | DEFR |
Josh Bogle
|
|
|
12/3 PV, ePlan
|
Routing - PLAN CHECK | 11/29/2018 | | 11/29/2018 | | FAIL |
Rob Patrick
|
|
|
Roof Plan & Attic Detail does not match aerial view of dwelling roof.
|
1st review completed | | | 11/29/2018 | | FAIL |
Rob Patrick
|
|
|
Roof Plan & Attic Detail does not match aerial view of dwelling roof.
|
Routing - PLANNING | 11/29/2018 | | 11/29/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 11/29/2018 | | 11/29/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/29/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2018 | | DONE |
|
|
|
emailed building permit to permitting@imwindandsolar.com for signatures
|
(F) Reprint permit | | | 11/29/2018 | | DONE |
|
|
|
|
Application received | | | 11/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2018 12:53PM
|
Plans ACCEPTED BY PLAN TECH | | | 11/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/27/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/27/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 11/27/2018 | | | | FAIL |
|
|
|
Roof plan does not match the aerial view.
|