Second Notice | | 5/17/2020 | 5/13/2020 | | DONE |
|
|
|
This permit finaled on the web by Ian Franklin
|
First Notice | | 4/16/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Permanent Occupancy | | | 4/6/2020 | | DONE |
|
|
|
|
BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Mike Jordan
|
|
|
Please call in advance. No Superintendent on premises and gate requires code for access. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
FIRE-Final Inspection | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please call in advance. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
Plan Reviewer's activity | | | 4/3/2020 | | DONE |
Joe Bruce
|
|
|
Spoke with owner of Stor-It and received email that is attached to case. The owner will not allow the tenant (Ada County Sheriff Dept) in building "E" until such time that they produce a building permit for the high-piled sotrage in units E22, E23, and E24.
|
FIRE-Final Inspection | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | FAIL |
Troy Cobbley
|
|
|
Corrections for life safety have been made. Life safety can be given a temp when a permit has been issued for the racking in Building E as discussed. Or a final when the racking permit for Building E is finaled.
Corrections have been made. Please contact me before heading to the site. Superintendent will be coming and going throughout the day. I want to make sure we have a representative to walk with you. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
FIRE-Final Inspection | 3/26/2020 | 3/30/2020 | 3/30/2020 | P | FAIL |
Troy Cobbley
|
|
|
Provided additional emergency lighting as discussed. Need the racking permit addressed in Building E as discussed. Other life safety items appear ok.
Phone #: ###-#### Inspection requested via web by Ian Franklin
|
PubWorks Occupancy Approval | 3/17/2020 | 3/17/2020 | 3/17/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Katelyn Menuge
|
|
|
Final
|
BLD-Conference | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Wall cover | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Mike Jordan
|
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Energy code compliance | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Mike Jordan
|
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Mike Jordan
|
|
|
drywall inspection for firewall on stairs and elevators building two Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar and 6x6 mesh building two second floor and screw inspection on the deck second floor Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Concrete | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | CANC |
Mike Jordan
|
|
|
second floor rebar and 6x6 mesh inspection and decking screw inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PART |
Dave Hannah
|
|
|
Insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell ground floor east west and south walls ok
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Mike Jordan
|
|
|
Southend of building two Phone #: ###-#### Inspection requested via web by Glen Farrell. SW4 type shearwalls ok for insulation,
|
BLD-Other | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar inspection at loading docks building two Phone #: ###-#### Inspection requested via web by Glen Farrell. Reinforcement for slab on grade.
|
BLD-Other | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Mike Jordan
|
|
|
rebar inspection building two southend Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar inspection middle section building one and BLD18 -04286 middle section building two Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell//interior footings on large building//rebar ok pendinngs special inspections///
|
BLD-Footing | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Mike Jordan
|
|
|
Rebar inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PART |
Mike Jordan
|
|
|
Glen- Building 2 rebar footing inspection Phone #: ###-####. North footing. Work in progress on installing dowels. Ok to place concrete pending special inspection.
|
BLD-Foundation | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PART |
Mike Jordan
|
|
|
rebar.. pour at 11 // Glenn Phone #: ###-####. East, West and south perimeter footings. Special inspector to verify installation of #4 dowels at 4ft. oc for cold joint. Also noted elevator pit slabs have been placed. Contractor noted that it was inspected by All West (special inspections agency).
|
Issue PAID IN FULL permit | | | 5/17/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2019 | | DONE |
|
|
|
informed Kraig I would work on the fees, but to please let me know what the trades should be for each unit (gave the full project amount on those) also informed he we still need ACHD.
|
Expiration Notice | 5/9/2019 | 5/31/2019 | 5/9/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (CJW) | 12/7/2018 | 12/13/2018 | 5/8/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 01/10/18 (new - 25 days) (eplan - 46 sheets) Stor-it Self Storage Bldg 2 (routed to fire, etc)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2019 | | DONE |
|
|
|
MET KRAIG@FOREGEBUILDINGS.COM
NEED
ACHD (SEE BLD19-04286 DOCUMENTS)
MET
GC FORM
REVISED VALUE
|
Routing PW Drainage | 5/3/2019 | | 5/8/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 5/3/2019 | 5/3/2019 | 5/6/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review completed 05.06.2019. Uploaded Rev_Fire 05.06.2019.pdf. Passed review.
|
Plan resubmittals requested | | | 5/3/2019 | | DONE |
|
|
|
Resubmittal plan intake failed. Upload architectural sheets having a stamp and signature of an Idaho Licensed Architect (A2.2 and A2.3).
|
Plan resubmittals received | | | 5/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/3/2019 | | 5/3/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 5/3/2019 | | 5/3/2019 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 4/29/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/9/2019 | | DONE |
|
|
|
Resubmittal plan intake failed. Upload architectural sheets having a stamp and signature of an Idaho Licensed Architect (A2.2, A2.3, SP100). Provide a COMcheck analysis that actually matches the building. Accurately show all areas and all actual conditions (e.g. the wall area on the 1st story between conditioned and unconditioned space is actually less than the wall area on the 2nd story between conditioned and unconditioned space). The area of the floor over unconditioned space is understated. Show the insulation systems that will actually be used.
|
Plan resubmittals received | | | 4/8/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/4/2019 | | DONE |
|
|
|
Resubmittal plan intake failed
|
Plan resubmittals received | | | 4/3/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/16/2019 | 1/19/2019 | 1/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/13/2018 | | 1/16/2019 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 1/16/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/16/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/7/2018 | 12/13/2018 | 1/9/2019 | | FAIL |
Mark Scharfen
|
|
|
Attached comments to case and emailed architect.
|
Routing Off Site - STRUCTURAL | 12/13/2018 | | 12/26/2018 | | PASS |
Carl Westfall
|
|
|
Sidney Gold (KPFF)
|
Routing PW Drainage | 12/13/2018 | | 12/18/2018 | | FAIL |
Brian Murphy
|
|
|
need 1.5 feet sand
|
Routing PW Solid Waste | 12/13/2018 | | 12/14/2018 | | PASS |
Evan Carpenter
|
|
|
Approved for commercial cart service.
|
Routing - Design Review | 12/13/2018 | | 12/14/2018 | | FAIL |
Andrea Tuning
|
|
|
45 degree parking stalls are required to be a minimum of 9-feet wide and 20-feet 5-inches in depth.
Pave all parking and drive aisles on 19 North Allumbaugh Street and 55 North Allumbaugh Street.
|
Routing - MECHANICAL | 12/13/2018 | | 12/13/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/13/2018 | | 12/13/2018 | | PASS |
David Moser
|
|
|
See DRH17-00528
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/13/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/13/2018 | | 12/13/2018 | | PASS |
Andy J. Long
|
|
|
ESC permit VOID. See main ESC permit for storage complex, ESC18-01667
|
Routing - Addressing | 12/13/2018 | | 12/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Street Lights | 12/13/2018 | | 12/13/2018 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 12/7/2018 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H.
|
Intake Approval | | | 12/3/2018 | | FAIL |
Michael Hanson
|
|
|
The structural calculation did not upload properly. Please try to upload again.
S1 and ESC-1 are missing the stamp signed and dated.
|
Application received | | | 11/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2018 12:59PM
|