Third Notice | | 5/12/2020 | 5/13/2020 | | DONE |
|
|
|
This permit finaled on the web by Ian Franklin
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/28/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Permanent Occupancy | | | 3/18/2020 | | DONE |
|
|
|
|
BLD-Final | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Mike Jordan
|
|
|
Ian Phone #: ###-####
|
PubWorks Occupancy Approval | 3/17/2020 | 3/17/2020 | 3/17/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | NR |
Jim Storey
|
|
|
Pierre Phone #: ###-#### need card signed pw and p$z
|
Zoning Approval | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Katelyn Menuge
|
|
|
Final
|
FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Ian Phone #: ###-####
|
BLD-Other | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Mike Jordan
|
|
|
Insulation in walls and ceiling framing in the office on building four Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Wall cover | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell. fire walls .
|
BLD-Framing/Rough-in | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Mike Jordan
|
|
|
and BLD18- 04291 Phone #: ###-#### Inspection requested via web by Glen Farrell
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
Plan Mod Approved
DO NOT RE ISSUE
|
CHANGE STATUS TO (ISS) | | | 12/4/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/7/2019 | 11/7/2019 | 12/3/2019 | | PASS |
Carl Westfall
|
|
|
plan mod - Stor-It Self Storage Bldg 4 (routed to staff)
|
Plan Reviewer's activity | | | 12/3/2019 | | PASS |
|
|
|
Plan mod approved
|
Routing - PLUMBING | 11/27/2019 | | 12/2/2019 | | PASS |
Dan Ediger
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 11/27/2019 | | 11/29/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 11/27/2019 | | 11/27/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 11/27/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/27/2019 | | 11/27/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 11/8/2019 | | 11/8/2019 | | FAIL |
Carl Westfall
|
|
|
(11-8-19) Plan intake review completed. Provide a framing plan and details for the new awnings. Specify all attachments. Provide structural calculations to verify the design. Provide a letter from the Project Structural Engineer evaluating the effects of replacing exterior shearwalls (i.e. SW-7) with windows. Provide drawings and supporting structural calculations showing that the capacity of this building to resist lateral loads is maintained or restored. CJW
|
Plan resubmittals requested | | | 11/8/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/7/2019 | | DONE |
|
|
|
modifications are to the office portion of building 4. add cultured stone wainscot and metal canopy to the exterior of the building. Reorganize the floor plan of the office. the office counter has been rotated and a side lite has been added to door 203
|
BLD-Other | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Mike Jordan
|
|
|
BLD18-04291 REbar INspection for building 4 ; 5 Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Foundation | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Mike Jordan
|
|
|
|
Issue PAID IN FULL permit | | | 5/17/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2019 | | DONE |
|
|
|
informed Kraig I would work on the fees, but to please let me know what the trades should be for each unit (gave the full project amount on those) also informed he we still need ACHD.
|
Expiration Notice | 5/9/2019 | 5/31/2019 | 5/9/2019 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
MET KRAIG@FOREGEBUILDINGS.COM
NEED
ACHD (SEE BLD19-04286 DOCUMENTS)
MET
GC FORM
REVISED VALUE
|
Routing - FIRE | 5/3/2019 | 5/3/2019 | 5/6/2019 | | PASS |
Mark Scharfen
|
|
|
IFC review comleted 05.06.2019. Uploaded REV_FIRE 005.06.2019.pdf. Passed review.
|
Plan assigned to (CJW) | 12/7/2018 | 12/13/2018 | 5/6/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 01/10/18 (new - 25 days) (eplan - 34 sheets) Stor-it Self Storage Bldg 4 (routed to fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/3/2019 | | 5/3/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - FIRE | 4/9/2019 | 4/9/2019 | 4/9/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 2nd Review 04.09.2019.pdf uploaded. Emailed to architect.
|
Routing - PLAN CHECK | 4/9/2019 | | 4/9/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 4/9/2019 | | 4/9/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 4/9/2019 | | 4/9/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 4/9/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/9/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/8/2019 | | DONE |
|
|
|
Revised architectural sheets not stamped and signed. Resubmittal plan intake failed.
|
Route to Impact Fee Review | 1/12/2019 | 1/15/2019 | 1/14/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/13/2018 | | 1/12/2019 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 1/12/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/12/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/7/2018 | 12/13/2018 | 1/9/2019 | | FAIL |
Mark Scharfen
|
|
|
Attached IFC Fire Code Review Comments and emailed architect.
|
Routing Off Site - STRUCTURAL | 12/13/2018 | | 12/26/2018 | | PASS |
Carl Westfall
|
|
|
Sidney Gold (KPFF)
|
Routing PW Drainage | 12/13/2018 | | 12/18/2018 | | FAIL |
Brian Murphy
|
|
|
need sand 1.5 feet
|
Routing PW Solid Waste | 12/13/2018 | | 12/14/2018 | | PASS |
Evan Carpenter
|
|
|
Approved for commercial cart service.
|
Routing - Design Review | 12/13/2018 | | 12/14/2018 | | FAIL |
Andrea Tuning
|
|
|
45 degree parking stalls are required to be a minimum of 9-feet wide and 20-feet 5-inches in depth.
Pave all parking and drive aisles on 19 North Allumbaugh Street and 55 North Allumbaugh Street.
|
Routing - MECHANICAL | 12/13/2018 | | 12/13/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/13/2018 | | 12/13/2018 | | PASS |
Daryl Spivey
|
|
|
See red line remarks and install per ISPC.
|
Routing - PLANNING | 12/13/2018 | | 12/13/2018 | | PASS |
David Moser
|
|
|
See DRH17-00528
|
Routing - Addressing | 12/13/2018 | | 12/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/13/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/13/2018 | | 12/13/2018 | | PASS |
Andy J. Long
|
|
|
VOID. See main ESC permit for storage complex, ESC18-01667
|
Routing PW Street Lights | 12/13/2018 | | 12/13/2018 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 12/7/2018 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H.
|
Intake Approval | | | 12/3/2018 | | FAIL |
Michael Hanson
|
|
|
The structural calculation did not upload properly. Please try to upload again.
S1 and ESC-1 are missing the stamp signed and dated.
|
Application received | | | 11/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2018 1:11PM
|