BLD-Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | NR |
Tony Young
|
|
|
Garry Phone #: ###-####,, hand rail is too small,, (1/2")
|
BLD-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Tony Young
|
|
|
? on hand rail
|
BLD-Framing/Rough-in | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Tony Young
|
|
|
Gary Phone #: ###-####
|
BLD-Wall Bracing | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Tony Young
|
|
|
Gary Phone #: ###-####,, deck frame ok
|
BLD-Footing | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Tony Young
|
|
|
Gerry Phone #: ###-####,, 2 deck footings,, one ledger per plan
|
Plan assigned to (JAB) Josh | 11/27/2018 | 11/27/2018 | 11/29/2018 | | PASS |
Josh Bogle
|
|
|
12/3 deck, paper - floodplain
|
Routing - PLAN CHECK | 11/27/2018 | | 11/29/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 11/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/29/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/29/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2018 | | DONE |
|
|
|
spoke with Gary informing him that this permit is ready and the fee amount due
|
Issue PAID IN FULL permit | | | 11/29/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 and routed to flodplain
|
Routing PW Flood Plain | 11/27/2018 | | 11/27/2018 | | PASS |
Jason C. Taylor
|
|
|
Project is outside SFHA no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Application received | | 11/27/2018 | | | |
|
|
|
|