Telephone call | | | 10/29/2019 | | DONE |
|
|
|
Spoke with Kristy and she confirmed the final value for Buss is $13,314
|
Print Statement | | | 9/26/2019 | | DONE |
|
|
|
|
First Notice | 8/7/2019 | 8/7/2019 | 9/19/2019 | | DONE |
Mike Jordan
|
|
|
mailed 9-20-19
|
BLD-Final | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Mike Jordan
|
|
|
Kenny Phone #: ###-####
|
DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | | | 7/29/2019 | | PASS |
|
|
|
|
BLD-Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | NR |
Mike Jordan
|
|
|
Kenny Phone #: ###-####. Still needs zoning.
|
FIRE-Final Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Emergency lighting not required per plan review.
Kenny w/ Pacific N Contractors Phone #: ###-####
|
FIRE-Final Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher and emergency lighting as per the approved plans.
Kenny Phone #: ###-####
|
BLD-Final | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | NR |
Mike Jordan
|
|
|
Kenny Phone #: ###-####. Needs zoning,plumbing and fire finals first.
|
BLD-Other | 5/16/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Mike Jordan
|
|
|
steel roof decking - checking the screws // Kenny Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Mike Jordan
|
|
|
Kenny Phone #: ###-####. Roof framing ok.
|
BLD-Concrete | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | DEFR |
Mike Jordan
|
|
|
rebar- Kenny pouring at 11am Phone #: ###-####
|
BLD-Footing | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Mike Jordan
|
|
|
Kenny- inspection for rebar in stem wall Phone #: ###-####
|
BLD-Foundation | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PART |
Mike Jordan
|
|
|
Kenny-rebar Phone #: ###-####. Footing ok. Pending special inspection on epoxy dowels.
|
BLD-Concrete | 3/27/2019 | 3/28/2019 | 3/28/2019 | P | CANC |
Mike Jordan
|
|
|
Kenny- Rebar Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/25/2019 | | DONE |
|
|
|
emailed julieb@brsarchitects.com because GC has a voice not set up and there is not email address to send it to them
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/1/2019 | | |
|
|
|
|
Plan assigned to (CDM) | 12/6/2018 | 12/6/2018 | 2/1/2019 | | PASS |
Carl D Madsen
|
|
|
502 Jackson's Car Wash Addition
|
Routing - PLAN CHECK | 1/30/2019 | | 2/1/2019 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2019 | | DONE |
|
|
|
ALL MET
Need
RP
GC Form
Revised Cert of Value
MET
ACHD
|
Route to Impact Fee Review | 1/19/2019 | 1/22/2019 | 1/24/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/6/2018 | 12/6/2018 | 1/17/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 1/17/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/6/2018 | | 12/28/2018 | | PASS |
Carl D Madsen
|
|
|
AHJ
|
Routing - PLAN CHECK | 12/6/2018 | | 12/28/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 12/7/2018 | | 12/11/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 12/7/2018 | | 12/10/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 12/6/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 12/6/2018 | | 12/10/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/6/2018 | | 12/7/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 12/6/2018 | | 12/7/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Design Review | 12/6/2018 | | 12/7/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00113
|
Routing - PUBLIC WORKS | 12/6/2018 | | 12/7/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/6/2018 | | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved.
|
Routing PW Drainage | 12/7/2018 | | 12/7/2018 | | PASS |
Brian Murphy
|
|
|
less than 1000sq ft
|
Routing PW Street Lights | 12/7/2018 | | 12/7/2018 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 12/4/2018 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by JHB
|
Intake Approval | | | 11/30/2018 | | FAIL |
Joe Bruce
|
|
|
1) Provide a Verification of Legal Lot or Parcel from noted on the checklist.
2) If no ESC Narrative and Plan are being submitted, please provide an ESC Waiver Letter. A sample waiver letter can be found on our website at this link: https://pds.cityofboise.org/media/135459/703_samplewaiverletter.doc
3) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
4) Provide portable fire extinguisher locations as required. See checklist item.
|
Application received | | | 11/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 28 2018 5:11PM
|