BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | FAIL |
Dave Hannah
|
|
|
Clive Phone #: ###-#### c/n on site knee wall attic not done
|
BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Dave Hannah
|
|
|
CLIDE Phone #: ###-####
|
BLD-Framing/Rough-in | 5/17/2019 | 5/20/2019 | 5/21/2019 | A | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-#### ok to insulate c/n on site
|
Routing - MECHANICAL | 5/6/2019 | | 5/6/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 4/22/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Dave Hannah
|
|
|
Wade Phone #: ###-####
|
BLD-Foundation | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | CANC |
Dave Hannah
|
|
|
wall // Chris Phone #: ###-####
|
BLD-Footing | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, foundation,, work in progress,, ok,, house,, not the detached garage
|
BLD-Footing | 2/8/2019 | 2/8/2019 | 2/12/2019 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
(F) Reprint permit | | | 1/4/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/4/2019 | | DONE |
|
|
|
|
Meeting | | | 1/3/2019 | | DONE |
|
|
|
sent email to doug that esc fees need to be paid before full issuance on project
|
Issue PAID IN FULL permit | | | 1/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2019 | | DONE |
|
|
|
|
Meeting | | | 12/19/2018 | | DONE |
|
|
|
6,000 in value is for demo see MIS18-00466
|
Telephone call | | | 12/17/2018 | | DONE |
|
|
|
Left a message for Clive informing him that we are still waiting for bob to go out and determine the bond about so there are no bld fees due at this time
|
OVERRIDE | | | 12/14/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/14/2018 | 12/14/2018 | 12/14/2018 | | PASS |
Josh Bogle
|
|
|
12/21 #402 L1 ePlan - waiting on demo bond to issue
|
Route to Impact Fee Review | 12/10/2018 | 12/13/2018 | 12/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
1st review completed | | | 12/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/14/2018 | | DONE |
|
|
|
MET DOUG@CULPANANDCOMPANY.COM
NEED
RP
|
Plan assigned to (M_H) | 12/10/2018 | | 12/14/2018 | | DEFR |
Michael Hanson
|
|
|
12/21 #402 L1 ePlan
|
Routing - PLAN CHECK | 12/10/2018 | | 12/14/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 12/10/2018 | | 12/11/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/10/2018 | | 12/10/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 12/10/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2018 | | 12/10/2018 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/10/2018 | | PASS |
|
|
|
|
Intake Approval | | | 12/3/2018 | | FAIL |
|
|
|
No changes made.
|
Intake Approval | | | 12/3/2018 | | FAIL |
|
|
|
don't see all corrections made,,,,please make corrections and sign off on task
|
Application received | | | 11/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2018 9:50AM
|
Intake Approval | | | 11/29/2018 | | FAIL |
|
|
|
Can not read plans: 2.0 foundation & framing, 3.0 1st floor, 4.0 roof & structure, 5.0 wall bacing & electrical, 8.0 sections and 9.0 elevations. (Not sure if they need to be re-uploaded or the layer need to be flatted)
Our map shows a house on this lot, a demo permit needs to be applied for or demo value needs to be added to this permit as a demo/rebuild.
|