BLD-Final | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Brandon Shaw
|
|
|
Call ahead for access Josh Phone #: ###-####
|
DOC - Permit Finaled | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/2/2020 | 7/2/2020 | 7/2/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Final | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | NR |
Brandon Shaw
|
|
|
Need PW approval...
|
BLD-Aging Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | DONE |
Brandon Shaw
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/10/2020 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 4/7/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/5/2020 | 3/5/2020 | 4/7/2020 | | PASS |
Josh Bogle
|
|
|
03/11 deck mod, ePlan - 1st done
|
Routing - PLAN CHECK | 4/7/2020 | | 4/7/2020 | | PASS |
Josh Bogle
|
|
|
fee per added value
|
Permit Ready to Issue | | | 4/7/2020 | | DONE |
|
|
|
plan mod approved
|
Routing - PLAN CHECK | 4/6/2020 | | 4/6/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing - PLAN CHECK | 3/24/2020 | | 4/3/2020 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Shaun - WUI, etc.
|
Routing - PLANNING | 3/24/2020 | | 4/1/2020 | | PASS |
Leon Letson
|
|
|
|
Routing PW Grading-Hillside | 3/27/2020 | | 3/30/2020 | | PASS |
Melissa Jannusch
|
|
|
Plan mod approved. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Plan Reviewer's activity | | | 3/27/2020 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal and added routing to Hillside
|
Plan Modification Accepted | | | 3/5/2020 | | DONE |
|
|
|
adding a deck/patio to permit
|
CHANGE STATUS TO (ISS) | | | 1/17/2020 | | DONE |
|
|
|
plan mod passed
|
OVERRIDE | | | 12/13/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/13/2019 | 12/13/2019 | 12/13/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 12/13/2019 | | DONE |
|
|
|
Change Struc. Calcs
|
Routing - PLAN CHECK | 12/13/2019 | | 12/13/2019 | | PASS |
Josh Bogle
|
|
|
minimum Plan Review fee
|
Case Summary (BLD) | | | 12/13/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/13/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Brandon Shaw
|
|
|
Garage cover pending Ele approval... ADU ok insulate...
|
BLD-Wall Bracing | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Josh Phone #: ###-####
|
BLD-Footing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 7/18/2019 | 7/18/2019 | 7/18/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 5/13/2019 | | DONE |
|
|
|
1st approved 180 day extension per Adele. see documents
|
Telephone call | | | 5/6/2019 | | DONE |
|
|
|
extension request received and forwarded to Building Official
|
Expiration Notice | 4/30/2019 | 5/21/2019 | 4/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Route to Impact Fee Review | 12/31/2018 | 1/3/2019 | 1/2/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
OVERRIDE | | | 12/31/2018 | | |
|
|
|
|
Route to Impact Fee Review | 12/31/2018 | 1/4/2019 | 12/31/2018 | | PASS |
Eric Bilimoria
|
|
|
this is a new 600 sq ft ADU basement level with a 600 sq ft garage
|
Plan assigned to (JAB) Josh | 12/4/2018 | 12/4/2018 | 12/31/2018 | | PASS |
Josh Bogle
|
|
|
12/10 ADU, ePlan - 1st done
|
Permit Ready to Issue | | | 12/31/2018 | | DONE |
|
|
|
ALL MET-NEED GC & RP
|
Routing PW Grading-Hillside | 12/18/2018 | | 12/31/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy Yes
|
Plan Reviewer's activity | | | 12/18/2018 | | DONE |
Josh Bogle
|
|
|
review complete task - returned to applicant, Hillside fail
|
Plan Reviewer's activity | | | 12/18/2018 | | DONE |
Josh Bogle
|
|
|
resubmiot received task - sent to Hillside
|
Routing PW Grading-Hillside | 12/13/2018 | | 12/17/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks from 12-7
|
Routing - PLAN CHECK | 12/13/2018 | | 12/13/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 12/4/2018 | | 12/7/2018 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - Erosion and Sediment | 12/7/2018 | | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
Owner or contractor needs to provide a valid RP before work starts.
|
Plan Reviewer's activity | | | 12/7/2018 | | DONE |
Josh Bogle
|
|
|
added routing for ESC
|
1st review completed | | | 12/7/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/4/2018 | | 12/7/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 12/4/2018 | | 12/6/2018 | | PASS |
Brent Moore
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2018 | | 12/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 12/4/2018 | | 12/5/2018 | | PASS |
Doug Chausow
|
|
|
ADU Address: 2671 E Rhyolite Ct
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/3/2018 | | FAIL |
|
|
|
CAT II
|
Application received | | | 11/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2018 1:28PM
|