Permit Information
Permit NumberBLD18-04314
StatusFinaled
Name HUNTER FAMILY TRUST
Site Address 2671 E RHYOLITE CT
Project NameADU-Hunter Casita Addition
Customer Number 
ePlanReviewYes
Description
Modification - adding a 132sq' 2nd level deck 4.7.20 **JAB** MODIFICATION OF +/-30' OF RETAINING WALL TO STONE INSTEAD OF CONCRETE 12-13-19 **jab** CAT II Hillside permit. WUI - SPECIAL INSPECTIONS FOR CONCRETE, SOILS, & HOLLOW-CORE PANELS - Permit for a 600sq' basement level Accessory Dwelling below a grade level 600sq' garage. There will be deferred submittals of engineeering for the hollow-core floor panels. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/2/20207/6/20207/6/2020APASS
DetailsBrandon Shaw
Call ahead for access Josh Phone #: ###-####
DOC - Permit Finaled7/6/20207/6/20207/6/2020PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval7/2/20207/2/20207/2/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Final6/18/20206/18/20206/18/2020PNR
DetailsBrandon Shaw
Need PW approval...
BLD-Aging Inspection4/15/20204/15/20204/15/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days4/15/20204/15/20204/15/2020PDONE
DetailsBrandon Shaw
CHANGE STATUS TO (ISS)  4/10/2020 DONE
plan mod
OVERRIDE  4/7/2020  
Plan assigned to (JAB) Josh3/5/20203/5/20204/7/2020 PASS
DetailsJosh Bogle
03/11 deck mod, ePlan - 1st done
Routing - PLAN CHECK4/7/2020 4/7/2020 PASS
DetailsJosh Bogle
fee per added value
Permit Ready to Issue  4/7/2020 DONE
plan mod approved
Routing - PLAN CHECK4/6/2020 4/6/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Routing - PLAN CHECK3/24/2020 4/3/2020 FAIL
DetailsJosh Bogle
see e-mail to Shaun - WUI, etc.
Routing - PLANNING3/24/2020 4/1/2020 PASS
DetailsLeon Letson
Routing PW Grading-Hillside3/27/2020 3/30/2020 PASS
DetailsMelissa Jannusch
Plan mod approved. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Plan Reviewer's activity  3/27/2020 DONE
DetailsJosh Bogle
accepted resubmittal and added routing to Hillside
Plan Modification Accepted  3/5/2020 DONE
adding a deck/patio to permit
CHANGE STATUS TO (ISS)  1/17/2020 DONE
plan mod passed
OVERRIDE  12/13/2019  
Plan assigned to (JAB) Josh12/13/201912/13/201912/13/2019 PASS
DetailsJosh Bogle
Routing Walk-In (BLD)12/13/201912/13/201912/13/2019PDONE
DetailsJosh Bogle
Plan Modification Accepted  12/13/2019 DONE
Change Struc. Calcs
Routing - PLAN CHECK12/13/2019 12/13/2019 PASS
DetailsJosh Bogle
minimum Plan Review fee
Case Summary (BLD)  12/13/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  12/13/2019 DONE
BLD-Framing/Rough-in12/2/201912/3/201912/3/2019APART
DetailsBrandon Shaw
Garage cover pending Ele approval...
ADU ok insulate...
BLD-Wall Bracing10/11/201910/11/201910/11/2019PPASS
DetailsBrandon Shaw
Josh Phone #: ###-####
BLD-Footing7/17/20197/18/20197/18/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval7/18/20197/18/20197/18/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  5/23/2019 DONE
Inspection Record Card- Bld  5/23/2019 DONE
Extend Review Timeline  5/13/2019 DONE
1st approved 180 day extension per Adele. see documents
Telephone call  5/6/2019 DONE
extension request received and forwarded to Building Official
Expiration Notice4/30/20195/21/20194/30/2019 DONE
DetailsBrittany Hill
Route to Impact Fee Review12/31/20181/3/20191/2/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
OVERRIDE  12/31/2018  
Route to Impact Fee Review12/31/20181/4/201912/31/2018 PASS
DetailsEric Bilimoria
this is a new 600 sq ft ADU basement level with a 600 sq ft garage
Plan assigned to (JAB) Josh12/4/201812/4/201812/31/2018 PASS
DetailsJosh Bogle
12/10 ADU, ePlan - 1st done
Permit Ready to Issue  12/31/2018 DONE
ALL MET-NEED GC & RP
Routing PW Grading-Hillside12/18/2018 12/31/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
PLANS/APPL TAKEN TO FRONT DESK  12/31/2018 DONE
DetailsJosh Bogle
ESC yes - Energy Yes
Plan Reviewer's activity  12/18/2018 DONE
DetailsJosh Bogle
review complete task - returned to applicant, Hillside fail
Plan Reviewer's activity  12/18/2018 DONE
DetailsJosh Bogle
resubmiot received task - sent to Hillside
Routing PW Grading-Hillside12/13/2018 12/17/2018 FAIL
DetailsMelissa Jannusch
See changemarks from 12-7
Routing - PLAN CHECK12/13/2018 12/13/2018 PASS
DetailsJosh Bogle
Routing PW Grading-Hillside12/4/2018 12/7/2018 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - Erosion and Sediment12/7/2018 12/7/2018 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Owner or contractor needs to provide a valid RP before work starts.
Plan Reviewer's activity  12/7/2018 DONE
DetailsJosh Bogle
added routing for ESC
1st review completed  12/7/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK12/4/2018 12/7/2018 FAIL
DetailsJosh Bogle
Routing - PLANNING12/4/2018 12/6/2018 PASS
DetailsBrent Moore
Routing - PUBLIC WORKS12/4/2018 12/5/2018 PASS
DetailsMorgan Webb
Routing - Addressing12/4/2018 12/5/2018 PASS
DetailsDoug Chausow
ADU Address: 2671 E Rhyolite Ct
Plans ACCEPTED BY PLAN TECH  12/4/2018 DONE
Intake Approval  12/4/2018 PASS
Recd Pcfee & Taken To Pln CK  12/4/2018 DONE
Intake Approval  12/3/2018 FAIL
CAT II
Application received  11/29/2018 DONE
Application submitted via PDS Online on Nov 29 2018 1:28PM