BLD-Final | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
Letter of compliance/Occupancy | | | 6/14/2019 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 6/14/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2019 | | DONE |
|
|
|
|
Expiration Notice | 4/30/2019 | 5/21/2019 | 4/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Route to Impact Fee Review | 4/11/2019 | 4/14/2019 | 4/12/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 4/12/2019 | | DONE |
|
|
|
Need
GC form-met
Revised Cert of Value
MET-(check to see if route to impact fees was compelted)
|
Plan assigned to (BJM) | 3/28/2019 | 3/28/2019 | 4/11/2019 | | DONE |
Brian McGowan
|
|
|
04/15 - 1st Review Complete - 04/02 (L1 #518) 5th & Idaho - The Gibson ePlan
|
Routing - PLAN CHECK | 4/11/2019 | | 4/11/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/28/2019 | | 4/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 4/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Design Review | 3/28/2019 | | 4/1/2019 | | PASS |
Ted Vanegas
|
|
|
|
Intake Approval | | | 3/27/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 3/21/2019 | | FAIL |
Joe Bruce
|
|
|
1. Provide details on the drawings showing how the awnings will be attached to the building. These drawings/details must be stamped/signed by the engineer of record and support the submitted structural calculations.
2. Provide details on the drawings showing how the awnings will be constructed. The awning details uploaded in the documents folder would suffice, but they must be shown on the construction drawings and stamped/sealed by the design professional of record.
3. Provide information on the drawings that specify the type of awning material will cover the frame. Compliance with IBC section 3105 will be required - ASTM E84 or UL 723. This could be in the form of cut sheets uploaded in the documents folder, or information called out on the drawings.
|
Intake Approval | | | 3/20/2019 | | FAIL |
Joe Bruce
|
|
|
1. A complete prescreen could not be completed since a checklist was not uploaded with this case. Please upload a completed checklist (#518) and upload into the documents folder. All the documents/information within the checklist must be provided to complete the prescreen process.
|
Application received | | | 11/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2018 3:27PM
|