BLD-Ceiling Grid Inspection | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Mike Jordan
|
|
|
Call 30 min before Phone #: ###-#### Inspection requested via web by Clint Hogwood. All issues are resolved. Ok to place tile.
|
BLD-Ceiling Grid Inspection | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Mike Jordan
|
|
|
Call 30 min before inspection please Phone #: ###-#### Inspection requested via web by Clint Hogwood. Ok to start installing ceiling tile. Needs to provide the spacers for rated light fixture overs.
|
BLD-Ceiling Grid Inspection | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | NR |
Mike Jordan
|
|
|
Call 30 min before as I am not on site Phone #: ###-#### Inspection requested via web by Clint Hogwood. Needs to provide UL data sheets on how grid installs and data sheets for main tees and cross tees.
|
BLD-Ceiling Grid Inspection | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Hogwood. 2nd. floor rooms only ok.
|
BLD-Ceiling Grid Inspection | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Hogwood. 1st. floor rooms only, o corridors at this time.
|
BLD-Ceiling Grid Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Hogwood. Provide UL listed 1 hr. ceiling grid system in 1hr. corridors. Also appears that doors and glazing have been switched out and ratings not maintained. Also noted several apeas were grid system is not completed. Correction notice was issued.
|
Change Expiration Date Only | | | 3/11/2020 | | DONE |
|
|
|
reissued by mistake on 3/11/20
|
CHANGE STATUS TO (ISS) | | | 3/11/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2020 | | DONE |
|
|
|
Emailed GC a cert of value to fill out because the plan mod app stated the value was being affected.
|
Permit Ready to Issue | | | 1/21/2020 | | DONE |
|
|
|
**DO NOT RE-ISSUE - PLAN MOD**
MET
Need
Revised Value - (Plan mod application stated the value is being affected)
|
Plan assigned to (Joe) | 1/15/2020 | 1/15/2020 | 1/17/2020 | | PASS |
Joe Bruce
|
|
|
1/24 (plan mod) IPCO remodel HVAC
|
Routing - PLAN CHECK | 1/17/2020 | | 1/17/2020 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 1/17/2020 | | 1/17/2020 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 1/15/2020 | | DONE |
|
|
|
Catherine Sewerll from Platform Architecture requested a plan mod. Revisions to ductwork layouts and distributions as required for coordination with existing conditions and new work. Sheets: M2.1, M2.2, M3.0
|
BLD-Framing/Rough-in | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Mike Jordan
|
|
|
Call for access // Josh Phone #: ###-####. INterior steel stud framed wall ok.
|
BLD-Conference | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | DONE |
Mike Jordan
|
|
|
Josh Phone #: ###-####. A correction notice was issued to provide two wires on opposing sides to installed light fixtures in grid and attach to structure above.
|
Place hold on job | 5/29/2019 | | 6/14/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
waiting for signed permit
|
Meeting | | | 6/4/2019 | | DONE |
|
|
|
sent email reminder to brandon about returning the signed permit so the plans can be released
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2019 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 5/29/2019 | | DONE |
|
|
|
reissued by mistake on 3/11/20
|
Meeting | | | 5/21/2019 | | DONE |
|
|
|
sent email to catherine and todd about expiring permit. see documents
|
Expiration Notice | 4/30/2019 | 5/21/2019 | 4/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JHB) | 12/4/2018 | 12/4/2018 | 2/14/2019 | | PASS |
Joe Bruce
|
|
|
*(2nd Rev Comp) 12/14 (L2) - Idaho Power HVAC Remodel (ePlan)
|
Routing - PLAN CHECK | 2/12/2019 | | 2/14/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/14/2019 | | DONE |
|
|
|
MET BRANDON@EKCCONSTRUCTION.COM
Need
GC Form
Revised Cert of Value
|
Routing - MECHANICAL | 2/12/2019 | | 2/12/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 2/12/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 1/30/2019 | | 2/4/2019 | | FAIL |
Troy James
|
|
|
Talked to mechanical engineer to revise plans to show smoke damper at corridor penetrations per Joe Bruce.
|
Plan resubmittals requested | | | 2/4/2019 | | FAIL |
Joe Bruce
|
|
|
Mechanical Plan Review - More information required.
|
Routing - PLAN CHECK | 1/30/2019 | | 2/1/2019 | | PASS |
Joe Bruce
|
|
|
Revised mechanical plan to show dampers at 1-hour rated corridors. **JHB**
|
Plan resubmittals received | | | 1/30/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 12/18/2018 | 12/21/2018 | 12/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 12/4/2018 | | 12/18/2018 | | PASS |
Joe Bruce
|
|
|
AHJ - Dave Haugland
|
1st review completed | | | 12/18/2018 | | FAIL |
Joe Bruce
|
|
|
Structural Review completed (12 working days)
|
Plan resubmittals requested | | | 12/18/2018 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to architect. **JHB**
|
Routing - PLAN CHECK | 12/4/2018 | | 12/13/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 12/4/2018 | | 12/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 12/4/2018 | | 12/4/2018 | | PASS |
Josh Wilson
|
|
|
New mechanical units will be located in center of roof area and not visible from the ground
|
Intake Approval | | | 12/3/2018 | | PASS |
Joe Bruce
|
|
|
Prescreen approval by Michael Hanson.
|
Application received | | | 11/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 30 2018 7:41AM
|