BLD-Final | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####//plan mod footing ok//
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Tell Riley
|
|
|
back patio addition//trades rough ok//framing ok//ok to insulate only//
|
BLD-Conference | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | DONE |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
Plan assigned to (RDP) | 7/23/2019 | 7/23/2019 | 7/25/2019 | | DONE |
Rob Patrick
|
|
|
structure plan mod...07/24 Failed. Needs engineering dwg of foundation mod.
|
CHANGE STATUS TO (ISS) | | | 7/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/24/2019 | | |
|
|
|
|
Telephone call | | | 7/24/2019 | | DONE |
|
|
|
left a message to Mike at ###-#### that permit is ready and fees due.
|
Routing - PLAN CHECK | 7/24/2019 | | 7/24/2019 | | FAIL |
Rob Patrick
|
|
|
Plan Mod Failed. Needs to get engineering dwgs of foundation modification.
|
Plan Modification Accepted | | | 7/24/2019 | | DONE |
|
|
|
plan mod- 2 large paper plans
|
Routing - PLAN CHECK | 7/24/2019 | | 7/24/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/24/2019 | | DONE |
|
|
|
DO NOT ISS- plan mod
|
Plan Modification Accepted | | | 7/23/2019 | | DONE |
|
|
|
**APPLICANT IS BRINGING PLANS THAT SHOW THE CHANGE-PLEASE GIVE TO ROB**
Plan mod- 2 large original plan and cal
|
BLD-Other | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | NR |
Tell Riley
|
|
|
ok to cover // Mike Phone #: ###-####//get letter from design engineer on framing and shear changes//also include bearing changes for beam in kitchen.//electrical/mechanical will need to be rough in and inspected prior to framing.///
|
BLD-Framing/Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PART |
Tell Riley
|
|
|
Partial framing // Mike Cook Phone #: ###-####//ok ot cover bath area,kitchen area//do not cover beams//add hanger to beam to beam conection//partial only//call for other framing inspections on addition and beams//add footings for beam in kitchen//
|
BLD-Foundation | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Tell Riley
|
|
|
Greg- foundation wall inspection Phone #: ###-####//foundation ok per plans//
|
BLD-Footing | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
geo-tech approved per Melissa//footing width and depth ok per approved plans// rebar installed per engineering//set backs ok per plans.//
|
BLD-Foundation | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | CANC |
Tell Riley
|
|
|
Greg- Phone #: ###-####/
|
PubWorks Subgrade Approval | 6/17/2019 | 6/17/2019 | 6/17/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/14/2019 | | DONE |
|
|
|
|
Expiration Notice | 4/30/2019 | 5/21/2019 | 4/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (RDP) | 1/15/2019 | 1/15/2019 | 1/24/2019 | | DONE |
Rob Patrick
|
|
|
1/21 sfd L1 Paper...Delivered to Melissa 1/17
|
Routing - PLAN CHECK | 1/15/2019 | | 1/24/2019 | | PASS |
Rob Patrick
|
|
|
|
Plan resubmittals received | | | 1/24/2019 | | DONE |
|
|
|
resubmittals received 2 sets of calcs and sheets A3-2 & A3-3-took to Rob P
|
Case Summary (BLD) | | | 1/24/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/24/2019 | | DONE |
|
|
|
spoke with chris informing her that this permit is ready and the fee amount due for issuance
|
Routing PW Grading-Hillside | 1/16/2019 | | 1/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PUBLIC WORKS | 1/22/2019 | | 1/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Plan assigned to (JAB) Josh | 12/5/2018 | 12/5/2018 | 1/15/2019 | | DEFR |
Josh Bogle
|
|
|
12/6 addition, paper - 1st done
|
Plan resubmittals received | | | 1/15/2019 | | DONE |
|
|
|
Two copies of sheets A3-2 and A3-3 & one copy of Structural Calculations taken to Josh B
|
Routing - Erosion and Sediment | 12/5/2018 | | 12/11/2018 | | PASS |
Andy J. Long
|
|
|
ESC general permit issued. Small addition, hillside excavation/foundation stabilization required. Certified RP provided
|
Routing PW Grading-Hillside | 12/5/2018 | | 12/10/2018 | | FAIL |
Melissa Jannusch
|
|
|
Please indicate how the geotechnical recommendations will be achieved. Will helical piers be used or will the area be over excavated and structurally filled?If helical piers will be used please provide the engineering for the piers.
|
Routing Walk-In (BLD) | 11/30/2018 | 11/30/2018 | 12/5/2018 | A | FAIL |
Rob Patrick
|
|
|
See RDP notes...
|
1st review completed | | | 12/5/2018 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/5/2018 | | 12/5/2018 | | FAIL |
Rob Patrick
|
|
|
|
Plan Reviewer's activity | | | 12/3/2018 | | FAIL |
Rob Patrick
|
|
|
12/3...In Josh's absence I emailed further submittal requirements to builder
|
Routing Walk-In (Zoning) | 11/30/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 11/30/2018 | | | |
|
|
|
|
Routing PW Grading-Hillside | 11/30/2018 | | | | |
Melissa Jannusch
|
|
|
|