Permit Information
Permit NumberBLD18-04335
StatusFinaled
Name LEHMAN LEGACY CONSTRUCTON & DESIGN
Site Address 508 S 8TH ST
Project NameAppDetex
Customer NumberEARLY START BLD19-00457
ePlanReviewNo
Description
(APPDETEX) Permit is to remodel an existing building previously occupied by Idaho Candy (see MF#951201); to remodel a Main Level of 6281 sq. ft. and Basement Level of 6281 sq. ft. Work includes (Main Level) - remodel existing Docking Area into an ADA compliant Female, multi-user restroom, Meeting Room, and Entry Area; new non-bearing walls for (2) other Meeting Areas; windows and an exterior door in corridor for Means of Egress, Fire rated wall at the end of the corridor to separate this building from the building at 518 8st. – (Basement Level) – remodel existing Bathroom into an ADA compliant Men’s restroom, and non-bearing walls for a new Meeting Area. New Mechanical is being installed on the roof (engineering has been provided for the additional loads). Relocation of existing light fixtures, electrical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  5/7/2020 DONE
sent email to monica@lehmanlegacy.com to figure out a time line final values will be sent in
Third Notice 2/12/20203/5/2020 DONE
mailed 3-6-30 with third and final letter
Third Follow up  3/5/2020 DONE
Third Notice 1/4/20202/7/2020 DONE
mailed 2-10-20 with second letter
Second Follow up  2/7/2020 DONE
Third Notice 12/2/201912/30/2019 DONE
mailed 1-1-20 with first follow up
First Follow up  12/30/2019 DONE
Third Notice 11/3/201911/27/2019 DONE
mailed 12-2-19
Third Notice 9/24/201910/29/2019 DONE
mailed 11-1
Second Notice 8/12/20199/19/2019 DONE
mailed 9-20-19
First Notice 7/21/20198/2/2019 DONE
mailed 8/5/19
BLD-Final7/11/20197/11/20197/11/2019PPASS
DetailsDave Hannah
AJ Phone #: ###-####
Permanent Occupancy  7/11/2019 DONE
BLD-Final5/15/20195/16/20195/16/2019APEND
DetailsDave Hannah
AJ Phone #: ###-#### needs to finish installing glass and doors ok to occ
Temporary Occupancy5/3/20198/1/20195/3/2019 DONE
DetailsCandy A. Nichols
Temporary Occupancy5/3/20198/1/20195/3/2019 DONE
DetailsCandy A. Nichols
Temporary Occupancy5/3/20198/1/20195/3/2019 DONE
DetailsCandy A. Nichols
BLD-Final5/1/20195/1/20195/2/2019PPEND
DetailsDave Hannah
AJ- Temp/partial occupancy Phone #: ###-#### ok for temp occ
FIRE-Final Inspection5/1/20195/1/20195/1/2019PPASS
DetailsTroy Cobbley
Life safety passed. The fire sprinkler issue has been corrected so no need for a temporary occupancy for life safety. AJ Phone #: ###-####
FIRE-Final Inspection4/29/20194/30/20194/30/2019PPART
DetailsMark Scharfen
Per Ron Johnson 30 day temp approved. There is one upright head in east stairwell in basement that is up against the deck. This is area they didn't work in but will fix. OK for fire final.

AJ Phone #: ###-####
Meeting  4/30/2019 DONE
Musgrove Engineering, Memorandum HVAC Letter. Taken to Troy James
Routing - MECHANICAL4/30/2019 4/30/2019 PASS
DetailsChad Schwendiman
Engineer submitted a letter detailing a plan for temporary ventilation until ERU unit is installed in order to be able to get temporary occupancy. Up loaded the letter to the documents.
Print Occupancy Form  4/26/2019 DONE
BLD-Framing/Rough-in3/28/20193/29/20194/1/2019PPASS
DetailsDave Hannah
AJ Phone #: ###-####
Plan assigned to (BJM)1/17/20191/17/20193/15/2019 DONE
DetailsBrian McGowan
1st review complete 02/05 #518 L3 paper - Corrections required
Routing - PLAN CHECK3/15/2019 3/15/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  3/15/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/15/2019 DONE
DetailsBrian McGowan
Print Occupancy Form  3/15/2019 DONE
Permit Ready to Issue  3/15/2019 DONE
(DOC FINAL EARLY START BLD19-00457, MAKE SURE ALL TRADE PERMITS ARE MOVED TO THIS PERMIT FROM EARLY START)

MET
Need
GC Form
Revised Value
(DOC FINAL EARLY START BLD19-00457, MAKE SURE ALL TRADE PERMITS ARE MOVED TO THIS PERMIT FROM EARLY START)
Telephone call  3/15/2019 DONE
called Gregory to let know permit is ready and that the GC needs to bring us the 302 & 306 forms
Issue PAID IN FULL permit  3/15/2019 DONE
Print Occupancy Form  3/15/2019 DONE
Routing - MECHANICAL3/12/2019 3/12/2019 PASS
DetailsTroy James
Plan resubmittals received  3/11/2019 DONE
DetailsBrian McGowan
Per Gregory Kaslo. Two sets of sheets: 0.0, A1.0, A2.0, A3.0, A4.0, A5.0, A6.0. Two copies of the COMcheck. Taken to BJM
Plan Reviewer's activity  3/11/2019 DONE
DetailsBrian McGowan
Took resubmittals to Katelyn's cubicle. Asked if Katelyn could redline her corrections (since the email address she used was incorrect) or if she needed resubmittals.
Routing - Design Review3/11/2019 3/11/2019 PASS
DetailsKatelyn Menuge
Redlined Requirements- Applicant will screen new mechanical.
Plan Reviewer's activity  3/5/2019 DONE
DetailsBrian McGowan
Mr. Kaslo's builder called about the permit. I had never received any resubmittals. He informed Mr. Kaslo who called me. The information was sent to the email address I thought was correct from the application but was not correct. I never received a mailing failure notice. Resent the info and will rush his plans thru when resubmitted.
Route to Impact Fee Review2/15/20192/18/20192/15/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE2/15/20192/15/20192/15/2019 PASS
DetailsErika Akin
Attached commments to case and plans
Plan Reviewer's activity  2/15/2019 DONE
DetailsBrian McGowan
Emailed Mr. Kaslo corrections required.
1st review completed  2/15/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK1/17/2019 2/14/2019 FAIL
DetailsBrian McGowan
Misc. corrections required
Plan Reviewer's activity  2/13/2019  
DetailsBrian McGowan
Called Mr. Kaslo to update him on the progress of his permit. Offered to provide an early start. He requested I initiate the early start process. (See BLD19-00457)
Routing - Design Review  2/11/2019 FAIL
DetailsKatelyn Menuge
Heat Pumps require screening.
Routing - PLUMBING2/7/2019 2/8/2019 PASS
DetailsDan Ediger
Per plan and ISPC.
Routing - MECHANICAL  2/7/2019 FAIL
DetailsTroy James
See documents for corrections.
Routing - Erosion and Sediment1/31/2019 2/4/2019 PASS
DetailsMichael Zawacki
Will allow without waiver request. Washout needed for any ADA ramps or improvements requiring concrete. Failure of washout or good house keeping will require waiver request with steps to address any issues.
Routing - Addressing1/17/2019 1/31/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS  1/31/2019 PASS
Plans ACCEPTED BY PLAN TECH  1/17/2019 DONE
Intake Approval  1/17/2019 PASS
Recd Pcfee & Taken To Pln CK  1/17/2019 DONE
Intake Approval  1/7/2019 FAIL
DetailsBrian McGowan
Need engineering for roof, signed design professional form, vicinity map on plan sheet. (As per submittal checklist date and notes)
Application received  12/3/2018 DONE
Application submitted via PDS Online on Dec 3 2018 7:22AM
Third Notice 3/10/2020