Permit Information
Permit NumberBLD18-04340
StatusFinaled
Name KC GARDNER RIVERSIDE
Site Address 101 S CAPITOL BLVD Unit: 301
Project NameGardner Company - Suite #301
Customer Number 
ePlanReviewYes
Description
(GARDNER COMPANY – SUITE #301) This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 3,125 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall for new opening, construction of interior non-bearing walls to create an office, millwork, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/10/20193/11/2019 DONE
mailed 3-12-19
BLD-Final1/31/20191/31/20191/31/2019PPASS
DetailsBrittany Hill
per dave's notes on PART pass from 1/4/19
Permanent Occupancy  1/31/2019 DONE
BLD-Final1/4/20191/4/20191/4/2019PPART
DetailsDave Hannah
ok for tco ok to go perm co afer elec go perm
FIRE-Final Inspection1/3/20191/4/20191/4/2019APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Larren Phone #: ###-####
BLD-Framing/Rough-in1/3/20191/4/20191/4/2019APASS
DetailsDave Hannah
Larren Phone #: ###-####
Issue PAID IN FULL permit  1/3/2019 DONE
Print Occupancy Form  1/3/2019 DONE
Routing - FIRE12/13/201812/13/201812/24/2018 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (JG)12/13/201812/13/201812/24/2018 PASS
DetailsJavier Guzman
12/24 L2 Gardner Co. TI Remodel ePlan
Routing - PLAN CHECK12/13/2018 12/24/2018 PASS
DetailsJavier Guzman
1st review completed  12/24/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/24/2018 DONE
Permit Ready to Issue  12/24/2018 DONE
MET
NEED
GC FORM
REVISED VALUE
Routing PW Drainage12/14/2018 12/14/2018 PASS
DetailsBrian Murphy
Routing PW Solid Waste12/14/2018 12/14/2018 PASS
DetailsEvan Carpenter
No changes to solid waste.
Intake Approval  12/13/2018 PASS
DetailsJoe Bruce
Prescreen passed by Michael Hanson. **JHB**
Routing - PUBLIC WORKS12/13/2018 12/13/2018 PASS
DetailsMorgan Webb
Routing - Addressing12/13/2018 12/13/2018 PASS
DetailsDoug Chausow
Intake Approval  12/12/2018 FAIL
DetailsMichael Hanson
12/12 - Provide wall schedule and wall bracing method for new wall.

12/07 - I do not see the notes indicating door hardware and exit sign locations to remain - COMPLETED
It appears that the Lounge space and Office 305 exceed the FE max travel distance. COMPLETED

12/05 - Provide door hardware schedule and exit sign locations. - COMPLETED
Intake Approval  12/7/2018 FAIL
DetailsMichael Hanson
12/07 - I do not see the notes indicating door hardware and exit sign locations to remain
It appears that the Lounge space and Office 305 exceed the FE max travel distance.

12/05 - Provide door hardware schedule and exit sign locations.
Intake Approval  12/5/2018 FAIL
DetailsMichael Hanson
Provide door hardware schedule and exit sign locations.
Application received  12/3/2018 DONE
Application submitted via PDS Online on Dec 3 2018 11:00AM