BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | DONE |
Tony Young
|
|
|
Kelly-call for access-dog issues Phone #: ###-####3,, appears to be completed,, visual from road
|
DOC - Permit Finaled | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Footing | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Ok to pour...
|
BLD-Footing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | NH |
Brandon Shaw
|
|
|
Kelly Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/13/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/13/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 12/5/2018 | 12/5/2018 | 12/11/2018 | | DONE |
Josh Bogle
|
|
|
Plan deferred back to Josh due to Rob's absence.
|
Routing - PLAN CHECK | 12/11/2018 | | 12/11/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 12/11/2018 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 12/5/2018 | 12/5/2018 | 12/5/2018 | | DONE |
Rob Patrick
|
|
|
Corrections Required
|
Plan assigned to (JAB) Josh | 12/4/2018 | 12/4/2018 | 12/5/2018 | | DEFR |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/5/2018 | | 12/5/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
1st review completed | | | 12/5/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 12/4/2018 | | 12/4/2018 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2018 | | DONE |
|
|
|
|
Application received | | | 12/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2018 7:13PM
|