Permit Information
Permit NumberBLD18-04352
StatusFinaled
Name ALTENERGY INC
Site Address 4782 S SPOTTED HORSE AVE
Project NameBlair 5.89kW Solar
Customer Number 
ePlanReviewYes
Description
Altenergy will be installing a 337 sq. ft., single array, 5.89 kW solar Photovoltaic system using (19) Silfab 310 W All Black Monocrystalline PV modules with Enphase IQ7 Microinverters installed beneath each module flush on the South facing roof of the Blair home. Modules will be wired to microinverters mounted to each panel such that there will be one string of 10 and one string of 9 modules/microinverters. The AC circuit will be run internally in the attic or externally on the roof in metallic conduit to the combiner panel mounted outside on the garage wall next to the electrical main panel. The AC power from the combiner panel will run to a dedicated utility disconnect grouped with the electric service meter and inverter and then into the main electrical panel to make a load-side connection via a back-fed breaker. Array does not exceed 33 percent of total roof. All work per plans, manufacturers specs and local code. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/21/201910/21/201910/21/2019 DONE
DetailsBrandon Shaw
DOC - Permit Finaled10/21/201910/21/201910/21/2019PPASS
DetailsBrandon Shaw
Issue PAID IN FULL permit  12/6/2018 DONE
Inspection Record Card- Bld  12/6/2018 DONE
Plan assigned to (RDP)12/5/201812/5/201812/5/2018 DONE
DetailsRob Patrick
Plan assigned to (JAB) Josh12/4/201812/4/201812/5/2018 DEFR
DetailsJosh Bogle
Routing - PLAN CHECK12/5/2018 12/5/2018 PASS
DetailsRob Patrick
1st review completed  12/5/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  12/5/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  12/5/2018 DONE
Met
Application received  12/4/2018 DONE
Application submitted via PDS Online on Dec 4 2018 9:08AM
Plans ACCEPTED BY PLAN TECH  12/4/2018 DONE
Recd Pcfee & Taken To Pln CK  12/4/2018 DONE
no fee taken at intake, 406
Intake Approval  12/4/2018 PASS
Routing - PLANNING12/4/2018 12/4/2018 PASS
DetailsSue Cummings