BLD-Final | 6/13/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Mike Jordan
|
|
|
Call for access // gari Phone #: ###-####
|
DOC - Permit Finaled | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved.
|
BLD-Final | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | FAIL |
Mike Jordan
|
|
|
Gari-please call for access code Phone #: ###-####. Provide tempered glazing at window next to shower/tub. 20 min. door to be self closing.
|
BLD-Blower Door Test Results | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | DONE |
Mike Jordan
|
|
|
3.0
|
BLD-Energy code compliance | 3/27/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/25/2019 | 3/26/2019 | 3/26/2019 | P | FAIL |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Provide fireblocking at fireplace fur out at ceiling level, fur down and fur out 2x4 wall at main entry hallway and at ceiling level upsatirs at dryer vent. Install missing strapson tall wall per the engineering. provide tempered glazing in window next to shower/tub. strap double top plate breaks upstairs, north wall. Studs shall also be continous, north wall upstairs. provide additional 2x6 blocking underneath truss bearing, east wall upstairs. Install purlins on T9 trusses (two next to T10 truss) were the roof sheathing has been omitted. provide additional info on T6 trusses upstairs? Correction notice posted. ok to insulate.
|
Routing - MECHANICAL | 3/15/2019 | | 3/15/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Mike Jordan
|
|
|
Juan Phone #: ###-####
|
BLD-Foundation | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron . Noted footing subgrade and form work does not meet the min. 35 degrees to place concrete. Contactor will need supplemental heat to place concrete.
|
BLD-Footing | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron . Cancelled by concrete subcontracotr via phone call.
|
Meeting | | | 1/30/2019 | | DONE |
|
|
|
Emailed Katie informing her that the RP is expired and we can issue the permits until we have a vaild RP.
|
Inspection Record Card- Bld | | | 1/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/30/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/24/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 1/16/2019 | 1/16/2019 | 1/24/2019 | | DONE |
Jenny Nelson
|
|
|
Plan mod. Complete 1/18/19 - need additional spread footing
|
Routing - PLAN CHECK | 1/24/2019 | | 1/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/24/2019 | | DONE |
|
|
|
met
(permit has never been issued before)
|
Routing - PLAN CHECK | 1/16/2019 | | 1/18/2019 | | FAIL |
Jenny Nelson
|
|
|
Spread footing at girder truss
|
Plan resubmittals received | | | 1/16/2019 | | DONE |
|
|
|
changing foundation and roof plan
|
OVERRIDE | | | 1/2/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 12/19/2018 | 12/19/2018 | 1/2/2019 | | DONE |
Jenny Nelson
|
|
|
2nd review, wall bracing. 1st review 12/19, wall bracing, clarify framing notes, update code year
|
Routing - PLAN CHECK | 1/2/2019 | | 1/2/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/2/2019 | | DONE |
|
|
|
needs RP. Met
|
Routing - PLAN CHECK | 12/26/2018 | | 12/26/2018 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 12/19/2018 | | FAIL |
Jenny Nelson
|
|
|
Wall bracing, clarify notes on framing plan, code year
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/19/2018 | | PASS |
Angela Hardy
|
|
|
|
Plan assigned to (M_H) | 12/13/2018 | | 12/19/2018 | | DEFR |
Michael Hanson
|
|
|
12/24 #402 L1 ePlan
|
Routing - PLAN CHECK | 12/13/2018 | | 12/19/2018 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 12/18/2018 | | 12/18/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 12/13/2018 | 12/16/2018 | 12/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/13/2018 | | 12/14/2018 | | FAIL |
Chad Schwendiman
|
|
|
The oreintation is off 180 degree's from the submitted site plan, Building component construction doesn't match the submitted plans.
|
Routing - PLANNING | 12/13/2018 | | 12/14/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 12/13/2018 | | 12/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 12/13/2018 | | FAIL |
|
|
|
12/13/18 Please provide the Building Energy Compliance- REScheck analysis or prescriptive method (table) show on plans.
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/12/2018 | | FAIL |
|
|
|
Wrong code year is displayed in drawings, please change to the 2015 IRC, 2015 IECC, 2017 plm, 2017 ele. On the cover sheet you show a block 4 when this is block 3 (can you please change anywhere that shows the wrong block). Need res check or prescriptive form incorporated in the drawings. Need cross section of whole home
|
Telephone call | | | 12/11/2018 | | DONE |
|
|
|
meailed John Jr @ Trilogy Idaho that this one would not get a credit (not close to one of the demo'd homes)
|
Application received | | | 12/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2018 4:02PM
|