BLD-Final | 8/19/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/19/2019 | 8/21/2019 | 8/21/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.34
|
BLD-Energy code compliance | 6/13/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 5/24/2019 | 5/24/2019 | 5/28/2019 | P | PART |
Dave Hannah
|
|
|
Jose- shear and soffit inpection Phone #: ###-#### ok to cover ext but missing some hold downs
|
BLD-Other | 5/24/2019 | 5/24/2019 | 5/28/2019 | P | PASS |
Dave Hannah
|
|
|
sheetrock sofitts
|
BLD-Foundation | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Dave Hannah
|
|
|
wall // Ryan Phone #: ###-####
|
BLD-Footing | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 1/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/2/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 12/21/2018 | 12/21/2018 | 1/2/2019 | | DONE |
Brian McGowan
|
|
|
passed - routed to FIRE
|
Override - Parcel Holds | | | 1/2/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 1/2/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/21/2018 | 12/21/2018 | 12/26/2018 | | PASS |
Lee G Meredith
|
|
|
No sprinklers
|
CHANGE STATUS TO (REV) | | | 12/21/2018 | | DONE |
|
|
|
fire review was missed
|
Plan assigned to (BJM) | 12/7/2018 | 12/7/2018 | 12/20/2018 | | DONE |
Brian McGowan
|
|
|
12/20 sfd L1 ePlan
|
Routing - PLAN CHECK | 12/7/2018 | | 12/20/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 12/20/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 12/7/2018 | 12/10/2018 | 12/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/7/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 12/7/2018 | | 12/10/2018 | | PASS |
Troy James
|
|
|
|
Application received | | | 12/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2018 7:48AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/7/2018 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 12/7/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 12/7/2018 | | 12/7/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 12/7/2018 | | 12/7/2018 | | PASS |
Angela Hardy
|
|
|
|