BLD-Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Gari- please call for access. Phone #: ###-####
|
DOC - Permit Finaled | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/23/2019 | 5/23/2019 | 5/23/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.56
|
BLD-Energy code compliance | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | FAIL |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Install the missed holddown on the south side of the dinning room portal frame. Install missed lateral bracing on truses T2, T3, T4 and t17. Nail off the T21 2 ply per the engineering. Provide additional 2x6 stud under the T18 truss at bearing. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Ok to install tyvek.
|
BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | FAIL |
Mike Jordan
|
|
|
Kai Phone #: ###-####. Remove tyvek for wall bracing inspection. Previous nspections have failed due to not all sheathing being installed, staples used in portal frame areas and several areas not attached.
|
BLD-Wall Bracing | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | FAIL |
Mike Jordan
|
|
|
Dari Phone #: ###-####. CNail off portal frames, Install remaining sheathing and nail off all missed areas.
|
Override - Condition Holds | 2/21/2019 | 1/1/1900 | 2/21/2019 | | |
|
|
|
inpections not related O C
|
BLD-Wall Bracing | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | NR |
Mike Jordan
|
|
|
Gaudy Phone #: ###-####
|
Override - Condition Holds | 2/19/2019 | 1/1/1900 | 2/19/2019 | | |
|
|
|
wall bracing inspection not the final
|
BLD-Foundation | 1/28/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru. New plans submitted, passed and brought to job site. All corrections made.
|
BLD-Foundation | 1/25/2019 | 1/28/2019 | 1/28/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
OVERRIDE | | | 1/25/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 1/16/2019 | | 1/25/2019 | | DONE |
Michael Hanson
|
|
|
01/22 plan mod. 1st review completed - See changemarks in ePlan for corrections. MDH
|
Routing - PLAN CHECK | 1/25/2019 | | 1/25/2019 | | PASS |
Michael Hanson
|
|
|
2 hour plan mod fee
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/16/2019 | | 1/22/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
BLD-Footing | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru. Approved plans do match what concrete contractor has built. Due to framing changes, piont loads have been moved. Noted to contracotr that he will need to submit a plan mod so that approved plans match what is being built in the field. Also noted to contracotr that moving foward, approved plans need to reflect the actual construction.
|
Plan Modification Accepted | | | 1/16/2019 | | DONE |
|
|
|
changing foundation and roof plan
|
CHANGE ISSUED DATE | | | 1/10/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/10/2019 | | DONE |
|
|
|
Emailed GC to inform them not all the fees have been paid and once the remaining fees have been paid we can then issue the permit.
|
Inspection Record Card- Bld | | | 1/10/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/20/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 12/20/2018 | | 12/20/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 12/20/2018 | | DONE |
|
|
|
MET
NEED
RP
|
Plan assigned to (M_H) | 12/13/2018 | | 12/20/2018 | | DONE |
Michael Hanson
|
|
|
12/24 #402 L1 ePlan. 1st review completed - See changemarks in ePlan for corrections required. MDH
|
Routing - PLAN CHECK | 12/13/2018 | | 12/18/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
1st review completed | | | 12/18/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
Route to Impact Fee Review | 12/13/2018 | 12/16/2018 | 12/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/13/2018 | | 12/14/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 12/13/2018 | | 12/14/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 12/13/2018 | | 12/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2018 | | 12/14/2018 | | PASS |
Morgan Webb
|
|
|
NO CREDIT FOR DEMO
|
Intake Approval | | | 12/13/2018 | | FAIL |
|
|
|
Building Envelope Energy Compliance – REScheck analysis signed or – compliance with the prescriptive method shown on plans.
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/12/2018 | | FAIL |
|
|
|
Missing building cross section, wrong code year on drawings & need prescriptive incorporated on drawings or res check
|
Telephone call | | | 12/11/2018 | | DONE |
|
|
|
emailed John @ Trilogy Idaho that this new SFD will get the credit for BLD18-01606 1725 S KImball
|
Application received | | | 12/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2018 8:41AM
|