BLD-Framing/Rough-in | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Jim Storey
|
|
|
Kara-basement Phone #: ###-####
|
BLD-Wall Bracing | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
PubWorks Subgrade Approval | 2/25/2019 | 2/25/2019 | 2/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 2/20/2019 | 2/21/2019 | 2/22/2019 | P | NR |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | NR |
Brandon Shaw
|
|
|
Need Geo sub-grade letter sub-mitted and appored by PW...
|
BLD-Footing | 2/5/2019 | 2/5/2019 | 2/5/2019 | A | FAIL |
Jim Storey
|
|
|
not per aproved plans/ ft and bar to small// have engineer field review and report back to city.
|
BLD-Footing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | NR |
Jim Storey
|
|
|
Jeff Phone #: ###-#### no access// no phone pick up.
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-#### ok to cover
|
Telephone call | | | 12/11/2018 | | DONE |
|
|
|
called Danny to let know permit is ready-answering service answered and will get them the message
|
Issue PAID IN FULL permit | | | 12/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/10/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/7/2018 | 12/7/2018 | 12/10/2018 | | DONE |
Josh Bogle
|
|
|
12/13 basement addition, paper
|
Routing PW Grading-Hillside | 12/7/2018 | | 12/10/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Erosion and Sediment | 12/7/2018 | | 12/10/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. Certified RP designated. Site preparation inspection is required.
|
Inspection Record Card- Bld | | | 12/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/10/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/10/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | FAIL |
Michael Hanson
|
|
|
Did not resolve the checklist items highlighted by Josh Bogle in a previous plan review. MDH
|
1st review completed | | | 12/7/2018 | | FAIL |
Michael Hanson
|
|
|
Did not resolve the checklist items highlighted by Josh Bogle in a previous plan review. MDH
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/7/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 12/7/2018 | | 12/7/2018 | | FAIL |
Michael Hanson
|
|
|
Did not resolve the checklist items highlighted by Josh Bogle in a previous plan review. MDH
|
Routing - PLAN CHECK | | | 12/7/2018 | | FAIL |
Michael Hanson
|
|
|
Did not resolve the checklist items highlighted by Josh Bogle in a previous plan review. MDH
|
Routing - PLANNING | 12/7/2018 | | 12/7/2018 | | PASS |
Nicolette Womack
|
|
|
No change in building footprint, adding basement.
|
Application received | | 12/7/2018 | | | |
|
|
|
|
Routing - PUBLIC WORKS | | | | | |
|
|
|
|