BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 6/6/2019 | 6/6/2019 | 6/6/2019 | A | DONE |
Mike Jordan
|
|
|
4.5
|
BLD-Energy code compliance | 3/7/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 3/7/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Energy code compliance | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover All ok except 8.5 " rise on stairway......(top).
|
BLD-Framing/Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover Need Mech ..........
|
BLD-Wall Bracing | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Foundation | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
BLD-Footing | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Jim Sly
|
|
|
pour time 11am- Mark Phone #: ###-####
|
Plan assigned to (BJM) | 12/12/2018 | 12/12/2018 | 1/9/2019 | | DONE |
Brian McGowan
|
|
|
12/24 sfd L1 ePlan - 1/8 Corrections required-PLANNING APPROVED - FINISH ASAP- 1/3/19 Corrections required by Planning prior to Plan Check
|
Routing - PLAN CHECK | 1/9/2019 | | 1/9/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/8/2019 | | 1/8/2019 | | FAIL |
Brian McGowan
|
|
|
Updated 2015 IRC details needed
|
Routing - PLAN CHECK | 1/3/2019 | | 1/3/2019 | | FAIL |
Brian McGowan
|
|
|
Proposed Plan does not fit within the setbacks. Planning suggests I wait to do a review until the Plan complies with setbacks.
|
Routing - PLANNING | 1/3/2019 | | 1/3/2019 | | PASS |
Sue Cummings
|
|
|
Cup18-00012 allows reduced setback. O.K.
|
Routing - MECHANICAL | 12/21/2018 | | 12/21/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/18/2018 | | 12/18/2018 | | FAIL |
Sue Cummings
|
|
|
Side yard setbacks are five feet on each side. No setback reductions were approved with this subdvision
|
Route to Impact Fee Review | 12/12/2018 | 12/15/2018 | 12/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 12/12/2018 | | 12/12/2018 | | FAIL |
Brian McGowan
|
|
|
Home needs to be redesigned to fit withing setbacks. Plan Check will be post poned until it passes.
|
Routing - MECHANICAL | 12/12/2018 | | 12/12/2018 | | FAIL |
Troy James
|
|
|
Report will change do to the changes required to the floor plan.
|
Plans ACCEPTED BY PLAN TECH | | | 12/12/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/12/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/12/2018 | | DONE |
|
|
|
|
Routing - Addressing | 12/12/2018 | | 12/12/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/12/2018 | | 12/12/2018 | | PASS |
Angela Hardy
|
|
|
|
1st review completed | | | 12/12/2018 | | FAIL |
Brian McGowan
|
|
|
Home needs to be redesigned to fit withing setbacks. Plan Check will be post poned until it passes.
|
Application received | | | 12/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 8 2018 7:34AM
|
Routing - PLANNING | 12/12/2018 | | | | FAIL |
|
|
|
East side does not meet the side setbacks
|