BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Tony Young
|
|
|
Need final walkthrough on corrections; window tempered, window opening restrictions and landings for French doors. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier// recomended for historic award,, c of c issued
|
DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PART |
Tony Young
|
|
|
Electrical inspected / finaled today, 01/23, and need BLD-Final. Call if any questions. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier// walk through,, c/n on windows, tempered and opening restrictions on bedroom windows within 24",, needs landings for out swing doors//
|
Zoning Approval | 1/24/2020 | 1/24/2020 | 1/24/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00507
|
BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Ready for inspection this afternoon, if available, otherwise Weds AM works. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier
|
BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Beau Brazier ok to insulate need to fire block fur outs and fur downs
|
BLD-Framing/Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | NR |
Tony Young
|
|
|
Framing rough in at 1405 N 14th. Thanks, Beau Phone #: ###-#### Inspection requested via web by Beau Brazier,, frame walk through only
|
BLD-Foundation | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PART |
Tony Young
|
|
|
Foundation inspection for 1405 N.14th. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier,, front bay wall,, addition walls,, point loads on south for beam loads
|
BLD-Footing | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Tony Young
|
|
|
Footing inspection for 1405 N 14th St. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier,, kitchen, point loads, and bay window restructure
|
BLD-Other | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PART |
Tony Young
|
|
|
Keeping Inspector informed of progress, inspection. Phone #: ###-#### Inspection requested via web by Beau Brazier// footings infill, other various inspections on frame..
|
BLD-Foundation | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PART |
Tony Young
|
|
|
Inspection for foundation on northwest corner of property Phone #: ###-#### Inspection requested via web by Beau Brazier,, icf block,, 8" ok,, northwest corner ok
|
BLD-Footing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Beau Brazier// north west corner area
|
BLD-Footing | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | FAIL |
Mike Jordan
|
|
|
Need inspection for footings under remodel. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier. rebar not per the engineering. Will reschedule for Monday.
|
BLD-Other | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | DONE |
Jim Sly
|
|
|
Would like preliminary review of foundation and footings before we pour. Thanks. Beau Phone #: ###-#### Inspection requested via web by Beau Brazier Recommendation...... Keep Engineer and Inspector for this area in the loop.....call for Conference inspection.
|
Issue PAID IN FULL permit | | | 12/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/27/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/24/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/10/2018 | 12/10/2018 | 12/24/2018 | | PASS |
Josh Bogle
|
|
|
12/14 remodel, ePlan - 1st done
|
Meeting | | | 12/24/2018 | | DONE |
|
|
|
sent an email to jake informing either gc (who rp will be) or owner will need to fill out the 302 form before issuance
|
Meeting | | | 12/24/2018 | | DONE |
|
|
|
sent email to Jake informing him what else is needed before issuance
|
Routing - PLAN CHECK | 12/24/2018 | | 12/24/2018 | | FAIL |
Josh Bogle
|
|
|
needs buildable deck framing details
|
Routing - PLAN CHECK | 12/24/2018 | | 12/24/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/24/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 12/24/2018 | | DONE |
|
|
|
NEED RP, GC, if person pulling the permit is not a GC then we will need the letter from the parcel owner (as well as the GC form)
|
Routing - Design Review | 12/19/2018 | | 12/19/2018 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00507 revised plans.
|
Routing - PLAN CHECK | 12/19/2018 | | 12/19/2018 | | FAIL |
Josh Bogle
|
|
|
lacking deck framing info, attic ventilation, 3rd floor plan
|
Routing Walk-In (BLD) | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | FAIL |
Josh Bogle
|
|
|
reviewed plans with the applicant
|
1st review completed | | | 12/17/2018 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 12/10/2018 | | 12/14/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/10/2018 | | 12/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/10/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/10/2018 | | DONE |
|
|
|
|
Routing - Design Review | 12/10/2018 | | 12/10/2018 | | FAIL |
KayCee Babb
|
|
|
Per DRH18-00507. Proposed plans include a visible patio and window replacement not previously approved. A Certificate of Appropriateness modification application is required.
|
Application received | | | 12/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 8 2018 9:54PM
|