BLD-Final | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Jim Storey
|
|
|
Leticia Phone #: ###-####
|
Permanent Occupancy | | | 1/14/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The fire alarm panel is clear of troubles
Leticia Phone #: ###-####
|
Telephone call | | | 1/11/2019 | | DONE |
|
|
|
left vm and sent email to Leticia checking progress and reminder that temp CO expires Tuesday, 1/14/19 --- talked to Leticia, scheduled inspections
|
Temporary Occupancy | 12/31/2018 | 3/31/2019 | 12/31/2018 | | DONE |
Tisha Gallop
|
|
|
15 day temp occupancy approved. Permanent occupancy pending Fire and Structural.
|
FIRE-Final Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PART |
Jim Page
|
|
|
Previously noted items for life fire safety inspection have been completed. Phone lines for fire panel monitoring were effected by Century Link failure so fire panel was showing a communication failure, per conversation with Ron Johnson a fire watch is recommended and a 15 day TCO is authorized contingent on phone lines being repaired and fire sprinkler monitoring is established.
|
BLD-Final | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PART |
Jim Storey
|
|
|
call 10 mins ahead- Leticia Phone #: ###-#### remove dead bolt at fireriser rm/ storage rm door hardware or remove. pending fire sign off.
|
FIRE-Final Inspection | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, an FIR permit is required for hood suppression system modifications.
call 10 mins ahead- Leticia Phone #: ###-####
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | NR |
Jim Storey
|
|
|
Leticia Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Jim Page
|
|
|
Fire spribkler head next to center bar area has head within 12 inches of air diffuser, needs to be an intermediate temperature head to be code compliant, current temp for sprinkler is 155 degree. Numerous escutcheons are missing throughout, all escutcheons need to be in place on fire sprinklers. New cooking epuipment has been installed as well as exisitng cooking equipment has been moved, modification to the hood fire suppression system may be required, contact a licensed commercial hood contractor for corrections (A permit will be required for ANY modifications to the hood system).
Leticia Phone #: ###-####
|
FIRE-Final Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | FAIL |
Jim Page
|
|
|
Attempted to call point of contact with phone number that was provided at 2:53PM, left a voicemail with my contact information, waited until 4PM with no call back. Inspection will need to be rescheduled.
Leticia Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/13/2018 | | DONE |
|
|
|
|
1st review completed | | | 12/12/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2018 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/11/2018 | | 12/12/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 12/12/2018 | | 12/12/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Environmental | 12/12/2018 | | 12/12/2018 | | PASS |
Rick Christenson
|
|
|
|
Permit Ready to Issue | | | 12/12/2018 | | DONE |
|
|
|
met
|
Case Summary (BLD) | | | 12/12/2018 | | DONE |
Joe Bruce
|
|
|
|
Print Occupancy Form | | | 12/12/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/12/2018 | | DONE |
|
|
|
Spoke with Leticia to inform her that the permit is ready.
|
Plan assigned to (JHB) | 12/10/2018 | 12/10/2018 | 12/11/2018 | | PASS |
Joe Bruce
|
|
|
12/14 - (528 L2) Jalapenos Bar & Grill
|
Routing - PLAN CHECK | | | 12/11/2018 | | PASS |
Joe Bruce
|
|
|
|
Case Summary (BLD) | | | 12/11/2018 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 12/10/2018 | 12/10/2018 | 12/10/2018 | | PASS |
Erika Akin
|
|
|
No work to be done under this permit. No change of use or occupancy.
Fire extinguishers will be required within a 75 foot travel distance of any location.
Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. A permit will be required for any necessary modifications.
Field inspector to verify Type I Hood current on maintenance.
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/10/2018 | | PASS |
Joe Bruce
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/10/2018 | | DONE |
|
|
|
|
First Notice | | 1/24/2019 | | | |
|
|
|
|
Application received | | 12/10/2018 | | | |
|
|
|
|