Permit Information
Permit NumberBLD18-04421
StatusFinaled
Name ZACHARY MCMULLEN
Site Address 2321 S THREE MILE CREEK WAY
Project NameMcMullen Foundation
Customer Number 
ePlanReview 
Description
Application for inspection for installation of a manufactured home at above location. Inspector will verify that setbacks meet the City's recommendation and that tie downs meet manufacturer's requirements. Documents pertaining to tie down requirements must be at the job site at the time of inspection. This inspection is required prior to occupancy. A separate electrical, plumbing, and/or mechanical permit may be required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/6/20192/6/20192/6/2019PPASS
DetailsMike Jordan
Please call Dave Phone #: ###-####
DOC - Permit Finaled2/6/20192/6/20192/6/2019PPASS
DetailsMike Jordan
CHANGE STATUS TO (ISS)  2/6/2019 DONE
Per Mike J, didn't mean to final permit yet. Another inspection is required.
BLD-Final1/30/20191/30/20191/30/2019APASS
DetailsMike Jordan
DOC - Permit Finaled1/30/20191/30/20191/30/2019PPASS
DetailsMike Jordan
Also refernce tile one letter dated 1-29-19 for complettion of driveway.
BLD-Final1/28/20191/29/20191/29/2019APEND
DetailsMike Jordan
Dave Phone #: ###-####. Al isues resolved except for driveway. Will post ond for $1,000 dollars for driveway.
BLD-Final1/25/20191/25/20191/25/2019PFAIL
DetailsMike Jordan
Dave Phone #: ###-####. Provide code compliant handrail and landings at the bottom of stairs. Will also provide letter from escrow co. showing money has been left in escrow to complete driveway.
BLD-Final1/24/20191/24/20191/24/2019PCANC
DetailsBrandon Shaw
Jeana (homeowner)-foundation final only Phone #: ###-####
BLD-Foundation1/24/20191/24/20191/24/2019PPASS
DetailsBrandon Shaw
Tie downs are in place and attached...
BLD-Foundation12/19/201812/20/201812/20/2018APART
DetailsMike Jordan
steam wall... late morning // derik Phone #: ###-####
BLD-Footing12/17/201812/18/201812/18/2018APASS
DetailsMike Jordan
Derek Phone #: ###-####
Plan assigned to (JAB) Josh12/17/201812/17/201812/17/2018 PASS
DetailsJosh Bogle
12/19 foundation, paper
Plan assigned to (BJM)12/13/201812/13/201812/17/2018 DEFR
DetailsBrian McGowan
Foundation Only- Paper
Routing - PLAN CHECK12/14/2018 12/17/2018 PASS
DetailsJosh Bogle
1st review completed  12/17/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  12/17/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  12/17/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/17/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  12/17/2018 DONE
MET
Need
Letter from Parcel owner for Gina to be allowed to pick up permit.
GC Form signed by either Zach or David (parcel owners)
or
parcel owner to pick up permit and fill out GC form
Inspection Record Card- Bld  12/17/2018 DONE
Telephone call  12/17/2018 DONE
Left voicemail for Gina informing her we need either the parcel owners to write a letter and sign the GC form for her to pick the permit up or the parcel owners to fill out the GC form and pick up the permit. Gave fees due.
Issue PAID IN FULL permit  12/17/2018 DONE
Routing - Addressing12/13/2018 12/14/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  12/14/2018 PASS
Route to Impact Fee Review 12/18/201812/13/2018 PASS
Routing - PLANNING12/13/2018 12/13/2018 PASS
DetailsSue Cummings
See redlines
Intake Approval  12/13/2018 PASS
Route to Impact Fee Review12/10/201812/13/201812/11/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Application received  12/10/2018 DONE
Application submitted via PDS Online on Dec 10 2018 12:21PM