Permit Information
Permit NumberBLD18-04438
StatusIssued
Name MIKE LANDA
Site Address 5379 W KENDALL ST
Project NameIdaho Kombucha
Customer Number 
ePlanReviewYes
Description
(IDAHO KOMBUCHA) This building is NOT fire sprinkled. Racking over 8'-0" requires a seperate permit. Permit for a tenant improvement for an existing warehouse space to add equipment for the brewing, fermenting and bottling of Kombucha with work to include the addition of the following: 12'-0 x 20'-0" walk in cooler with chiller located in secure enclosure outside, (12) fermenter tanks, (1) on-demand water heater, (1) 50 gal electric tank water heater, (1) prep sink, (1) 3-compartment sink, handwash sink, (1) 8'-0" trench drain, (3) brite tanks, (1) backflow preventer valve, replace (1) mop sink, (1) RO water filtering system, (1) handwash sink, (1) 2x6 non load bearing plumbing wall, flooring and finishes, grab bars in the restrooms. Interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is not sprinklered. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/22/20198/23/20198/23/2019APASS
DetailsTroy Cobbley
Life safety passed. CO2 detector installed and glycol system installed at 35 gallon max.

Mike Phone #: ###-####
BLD-Final3/14/20193/15/20193/15/2019PPART
DetailsJim Sly
Mike Phone #: ###-####
OK for Temp. Occ. OK for Perm. Occ. when Fire and Mech. signs off........Perm.
FIRE-Final Inspection3/14/20193/15/20193/15/2019ACANC
DetailsJim Page
Duplicate inspection request, this request is cancelled.

mike Phone #: ###-####
FIRE-Final Inspection3/14/20193/15/20193/15/2019APART
DetailsJim Page
Partial final inspection for life fire safety complete. Glycol system and CO2 have not been installed yet, CO2 will require a detection aoarm due to amount being used. TCO for life fire safety is complete, a follow up inspection will be required after permenant CO2 system and glycol system is installed.

Duplicate inspection request, this request is cancelled.

Mike Phone #: ###-####
BLD-Ceiling Grid Inspection2/27/20192/27/20192/28/2019PPASS
DetailsJim Sly
Mike Phone #: ###-####
FIRE-Conference2/27/20192/27/20192/27/2019PDONE
DetailsTroy Cobbley
Met with Mike discussed requirements needed for final. Mike mentioned not having glycol system installed in time for final so we gave him Ron Johnson's phone and email to discuss possible TCO when they are ready.

Mike Phone #: ###-####
Print Occupancy Form  1/30/2019 DONE
Issue PAID IN FULL permit  1/30/2019 DONE
Meeting  1/30/2019 DONE
Emailed Mike L, permit to sign.
Route to Impact Fee Review1/25/20191/28/20191/25/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan assigned to (M_H)1/16/2019 1/25/2019 DONE
DetailsMichael Hanson
02/12 #520 L3 ePlan. Idaho Kombucha
Routing - PLAN CHECK1/16/2019 1/25/2019 PASS
DetailsMichael Hanson
1st review completed  1/25/2019 DONE
DetailsMichael Hanson
Case Summary (BLD)  1/25/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/25/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/25/2019 DONE
need- met
GC
Rev cert of val
Routing - FIRE1/16/20191/16/20191/24/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLUMBING1/16/2019 1/23/2019 PASS
DetailsDan Ediger
Eyewash deleted per the engineer Steve Trout. Per ISPC and approved plans
Routing PW Environmental1/17/2019 1/22/2019 PASS
DetailsTerry Alber
No Pretreatment issues.
Routing - Addressing1/16/2019 1/17/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/16/2019 1/17/2019 PASS
DetailsAngela Hardy
Routing - MECHANICAL1/16/2019 1/17/2019 PASS
DetailsTroy James
On demand water heater only shown on plans. Field verify venting and gas piping.
Routing - Design Review1/16/2019 1/17/2019 PASS
DetailsKatelyn Menuge
CZC18-00269
Intake Approval  1/11/2019 PASS
Intake Approval  12/24/2018 FAIL
DetailsBrian McGowan
Please resolve the following corrections for the Prescreen to be approved.
1. Provide Information and Installation details on the cooler, Kettle, Brite Tanks and Fermenter Tanks.
2. Show any exit signs and emergency lighting required on the plans.
3. A Mechanical Plan may be required depending on the installation requirements of the proposed equipment to be installed.
4. Does the addition of the cooler and other equipment trigger the need for a Lighting Plan, COMchecks, heating and cooling calculations? Please verify and resubmit any relevant information.
Intake Approval  12/17/2018 FAIL
DetailsBrian McGowan
Please resolve the following corrections for the Prescreen to be approved.
1. Complete the Table of Contents on Sheet A1.0
2. Provide an Existing Floor Plan (as is drawing).
3. Provide Information and Installation details on the cooler, Kettle, Brite Tanks and Fermenter Tanks.
4. Show any exit signs and emergency lighting required on the plans.
5. A Mechanical Plan may be required depending on the installation requirements of the proposed equipment to be installed.
6. Does the addition of the cooler and other equipment trigger the need for a Lighting Plan, COMchecks, heating and cooling calculations? Please verify and resubmit any relevant information.
Application received  12/12/2018 DONE
Application submitted via PDS Online on Dec 12 2018 9:19AM