Permit Information
Permit NumberBLD18-04465
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2400 S TRAPPER PL
Project NameHarris North #1 Lot 29 Block 0
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3,910 sq. ft., two story (first story 2,705 sq. ft., second story 1,205 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 313 sq. ft. of covered patio/porch and a 933 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***BJM*** Prescriptive Energy Code proposed. AN NFPA 13D FIRE SPRINKLER SYSTEM IS TO BE PROVIDED, AS NOTED ON THE DRAWINGS. LGMA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/30/20197/31/20197/31/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled7/31/20197/31/20197/31/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/31/20197/31/20197/31/2019ADONE
DetailsBrandon Shaw
ACH50- 3.9
PubWorks Occupancy Approval7/31/20197/31/20197/31/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final7/30/20197/30/20197/30/2019PCANC
DetailsBrandon Shaw
Less Phone #: ###-####
BLD-Final7/29/20197/30/20197/30/2019ACANC
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance4/16/20194/17/20194/17/2019APASS
DetailsBrandon Shaw
les Phone #: ###-####
BLD-Other4/15/20194/15/20194/15/2019PPASS
DetailsBrandon Shaw
Soffit
BLD-Framing/Rough-in4/15/20194/15/20194/15/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Framing/Rough-in4/12/20194/12/20194/12/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019ANR
DetailsBrandon Shaw
Need Fire rough-in...
BLD-Wall Bracing3/22/20193/22/20193/22/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation2/5/20192/6/20192/6/2019APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...
BLD-Footing1/31/20191/31/20191/31/2019PPASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval1/29/20191/29/20191/29/2019 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Telephone call  1/18/2019 DONE
Emailed applicant/gc to inform them not all the fees have been paid and once the remaining fees are paid we can then issue the permits.
Issue PAID IN FULL permit  1/18/2019 DONE
Inspection Record Card- Bld  1/18/2019 DONE
OVERRIDE  1/7/2019  
Plan assigned to (BJM)12/17/201812/17/20181/7/2019 DONE
DetailsBrian McGowan
01/07 sfd L2 ePlan
Routing - PLAN CHECK12/17/2018 1/7/2019 PASS
DetailsBrian McGowan
1st review completed  1/7/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  1/7/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  1/7/2019 DONE
Routing PW Grading-Hillside12/17/2018 12/20/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review12/17/201812/20/201812/18/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing12/17/2018 12/18/2018 PASS
DetailsLaura Hunter
Routing - FIRE12/17/201812/17/201812/17/2018 PASS
DetailsLee G Meredith
An NFPA 13D fire sprinkler system is to be provided, as noted on the drawings.
Routing - Erosion and Sediment12/17/2018 12/17/2018 PASS
DetailsMichael Zawacki
Routing - PUBLIC WORKS12/17/2018 12/17/2018 PASS
DetailsAngela Hardy
Recd Pcfee & Taken To Pln CK  12/17/2018 DONE
Routing - MECHANICAL12/17/2018 12/17/2018 PASS
DetailsTroy James
Routing - PLANNING12/17/2018 12/17/2018 PASS
DetailsSue Cummings
Application received  12/14/2018 DONE
Application submitted via PDS Online on Dec 14 2018 4:18PM