Permit Information
Permit NumberBLD18-04478
StatusFinaled
Name FOLGER DEVELOPMENT SERVICE LLC
Site Address 4552 N ARROW CREST WAY
Project NameBrunelli Garage
Customer Number 
ePlanReviewNo
Description
Permit to construct a 640sq' detached garage with 96sq' of attached storage. All work per plans, notations, attachments, local codes & ordinances. Separate electrical permit required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/23/20194/24/20194/24/2019PPASS
DetailsTony Young
Josh Phone #: ###-####
DOC - Permit Finaled4/24/20194/24/20194/24/2019PPASS
DetailsTony Young
BLD-Framing/Rough-in4/23/20194/23/20194/23/2019PNR
DetailsTony Young
Josh Phone #: ###-####,, needs ele. final
BLD-Other3/1/20193/4/20193/5/2019PPASS
DetailsJim Sly
sofit // Josh Phone #: ###-####
BLD-Framing/Rough-in2/26/20192/26/20192/26/2019PPART
DetailsTony Young
Joshua Phone #: ###-####,, interior ok after fixes
BLD-Foundation2/25/20192/25/20192/25/2019PPART
DetailsTony Young
Josh-rebar Phone #: ###-####,, new foundation pieces ok
BLD-Framing/Rough-in2/20/20192/21/20192/21/2019AFAIL
DetailsTony Young
Josh Phone #: ###-####,, needs sill bolts per plan/code,, tool shed?.. soffit protection.. needs engineer fix on front portal frame,,
( concrete and frame not matched up),, ok to insulate but leave open areas for re-inspection
BLD-Wall Bracing2/4/20192/5/20192/5/2019APART
DetailsBrandon Shaw
RV garage only, tool shed to finished by framing rough-in...
BLD-Wall Bracing1/31/20192/4/20192/4/2019ANR
DetailsTony Young
Joshua Phone #: ###-####
PubWorks Subgrade Approval1/25/20191/25/20191/25/2019 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Foundation1/23/20191/24/20191/24/2019APEND
DetailsBrandon Shaw
Need Geo subgrade and PW arroval...
Rebar OK...
BLD-Foundation1/17/20191/22/20191/22/2019APART
DetailsJim Storey
Jeremy-would like as early am as possible Phone #: ###-#### pic w contractor if needed
Issue PAID IN FULL permit  1/3/2019 DONE
Routing - PUBLIC WORKS12/31/2018 1/2/2019 PASS
DetailsAngela Hardy
Telephone call  1/2/2019 DONE
Left Joshua informing this permit is ready, the fee amount due and that we will need RP for esc permit
OVERRIDE  12/31/2018  
Plan assigned to (JAB) Josh12/17/201812/17/201812/31/2018 PASS
DetailsJosh Bogle
12/31 garage, paper - 1st done
Routing - Erosion and Sediment12/17/2018 12/31/2018 PASS
DetailsMichael Zawacki
Waiver approved, preconstruction site prep inspection required.
Routing - PLAN CHECK12/31/2018 12/31/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  12/31/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  12/31/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/31/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  12/31/2018 DONE
need RP
Routing PW Grading-Hillside12/24/2018 12/27/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
1st review completed  12/24/2018 FAIL
DetailsJosh Bogle
pending Hillside approval of grading and drainage paln
Routing - PLAN CHECK12/17/2018 12/24/2018 FAIL
DetailsJosh Bogle
Routing - PUBLIC WORKS12/20/2018 12/21/2018 FAIL
DetailsAngela Hardy
SEE HILLSIDE FOR FAIL
Routing - Addressing12/21/2018 12/21/2018 PASS
DetailsDoug Chausow
Plan resubmittals received  12/20/2018 DONE
Three copies each of Geotechnical Recommendation report and full set of plans stamped and taken to plan reviewer.
Routing PW Grading-Hillside12/17/2018 12/20/2018 FAIL
DetailsMelissa Jannusch
additonal documents required
Routing Walk-In (Zoning)12/17/201812/17/201812/17/2018PFAIL
DetailsNicolette Womack
Appeal Period ends Dec 24th at 5pm.

Grasscrete approved by HS as seperation between two driveways. Pass after Dec 24th.
Routing Walk-In (BLD)12/17/201812/17/201812/17/2018PPASS
DetailsJosh Bogle
took in as a level two, routed to Hillside & ESC
Application received 12/17/2018