BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, needs ele. final
|
BLD-Other | 3/1/2019 | 3/4/2019 | 3/5/2019 | P | PASS |
Jim Sly
|
|
|
sofit // Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PART |
Tony Young
|
|
|
Joshua Phone #: ###-####,, interior ok after fixes
|
BLD-Foundation | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PART |
Tony Young
|
|
|
Josh-rebar Phone #: ###-####,, new foundation pieces ok
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, needs sill bolts per plan/code,, tool shed?.. soffit protection.. needs engineer fix on front portal frame,, ( concrete and frame not matched up),, ok to insulate but leave open areas for re-inspection
|
BLD-Wall Bracing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PART |
Brandon Shaw
|
|
|
RV garage only, tool shed to finished by framing rough-in...
|
BLD-Wall Bracing | 1/31/2019 | 2/4/2019 | 2/4/2019 | A | NR |
Tony Young
|
|
|
Joshua Phone #: ###-####
|
PubWorks Subgrade Approval | 1/25/2019 | 1/25/2019 | 1/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PEND |
Brandon Shaw
|
|
|
Need Geo subgrade and PW arroval... Rebar OK...
|
BLD-Foundation | 1/17/2019 | 1/22/2019 | 1/22/2019 | A | PART |
Jim Storey
|
|
|
Jeremy-would like as early am as possible Phone #: ###-#### pic w contractor if needed
|
Issue PAID IN FULL permit | | | 1/3/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/31/2018 | | 1/2/2019 | | PASS |
Angela Hardy
|
|
|
|
Telephone call | | | 1/2/2019 | | DONE |
|
|
|
Left Joshua informing this permit is ready, the fee amount due and that we will need RP for esc permit
|
OVERRIDE | | | 12/31/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/17/2018 | 12/17/2018 | 12/31/2018 | | PASS |
Josh Bogle
|
|
|
12/31 garage, paper - 1st done
|
Routing - Erosion and Sediment | 12/17/2018 | | 12/31/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved, preconstruction site prep inspection required.
|
Routing - PLAN CHECK | 12/31/2018 | | 12/31/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/31/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/31/2018 | | DONE |
|
|
|
need RP
|
Routing PW Grading-Hillside | 12/24/2018 | | 12/27/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
1st review completed | | | 12/24/2018 | | FAIL |
Josh Bogle
|
|
|
pending Hillside approval of grading and drainage paln
|
Routing - PLAN CHECK | 12/17/2018 | | 12/24/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PUBLIC WORKS | 12/20/2018 | | 12/21/2018 | | FAIL |
Angela Hardy
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing - Addressing | 12/21/2018 | | 12/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Plan resubmittals received | | | 12/20/2018 | | DONE |
|
|
|
Three copies each of Geotechnical Recommendation report and full set of plans stamped and taken to plan reviewer.
|
Routing PW Grading-Hillside | 12/17/2018 | | 12/20/2018 | | FAIL |
Melissa Jannusch
|
|
|
additonal documents required
|
Routing Walk-In (Zoning) | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | FAIL |
Nicolette Womack
|
|
|
Appeal Period ends Dec 24th at 5pm.
Grasscrete approved by HS as seperation between two driveways. Pass after Dec 24th.
|
Routing Walk-In (BLD) | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level two, routed to Hillside & ESC
|
Application received | | 12/17/2018 | | | |
|
|
|
|