Print Statement | | | 5/30/2019 | | DONE |
|
|
|
|
Print Statement | | | 5/30/2019 | | DONE |
|
|
|
|
Second Notice | | 4/25/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19 to keith philips
|
First Notice | | 3/30/2019 | 4/15/2019 | | DONE |
|
|
|
mailed 4-16-19
|
BLD-Final | 3/19/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Jim Storey
|
|
|
Keith Phone #: ###-####
|
FIRE-Final Inspection | 3/19/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed pending the installation of the CO detector. Inspection by Mark Scharfen.
Keith Phone #: ###-####
|
Permanent Occupancy | | | 3/20/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jim Storey
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Jim Storey
|
|
|
KEITH Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PART |
Brandon Shaw
|
|
|
Partial framing // Keith Phone #: ###-####
|
Plan assigned to (JHB) | 1/10/2019 | 1/10/2019 | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
*(1st Rev Comp) 02/01 (L3) Camp Pong and Axe
|
Routing - PLAN CHECK | 2/5/2019 | | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - PLANNING | 2/5/2019 | | 2/8/2019 | | PASS |
Jeff Lowe
|
|
|
112 seats shown on floor plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2019 | | DONE |
|
|
|
MET
NEED
GC
Rev cert of val
|
Print Occupancy Form | | | 2/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/5/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 1/31/2019 | 2/3/2019 | 2/1/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 1/10/2019 | 1/10/2019 | 1/31/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 1/31/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 1/10/2019 | | 1/31/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing PW Environmental | 1/10/2019 | | 1/14/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 1/10/2019 | | 1/10/2019 | | PASS |
Daryl Spivey
|
|
|
|
Routing - PLANNING | 1/10/2019 | | 1/10/2019 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 1/10/2019 | | 1/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/10/2019 | | 1/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/8/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/4/2019 | | FAIL |
Joe Bruce
|
|
|
1) Form #304 is missing the owner's signature. Upload this document into the documents folder.
2) Architect license for Thomas Whitworth (AR-1378) has expired on 2/27/2018 and is not valid.
|
Intake Approval | | | 12/31/2018 | | FAIL |
Joe Bruce
|
|
|
1) Missing form #304 - Registered Design Professional. Upload this document into the documents folder.
2) Plans must be stamped by an Idaho licensed architect for this project. Provide a valid stamp/signature on the plans.
3) Demolition plan is incomplete and does not show or reflect demolition occurring in this space. Provide and note all items including plumbing fixtures, walls, doors, finishes, etc... that are to be demolished on the demo plan.
|
Intake Approval | | | 12/27/2018 | | FAIL |
Joe Bruce
|
|
|
1) The uploaded checklist in the documents folder does not appear to be a valid format. Upload a PDF of the checklist. A complete prescreen of this project could not be completed since the checklist is not valid.
2) Provide plans stamped/signed by an Architect. Plans are required to be stamped/signed since this is a change of use.
|
Application received | | | 12/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 18 2018 2:52PM
|