Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-04506
StatusFinaled
Name PHOTRONICS INC
Site Address 10136 S FEDERAL WAY
Project NamePhotronics Office Remodel
Customer Number 
ePlanReviewYes
Description
(PHOTOTRONICS, INC) //Plan modification to add missing wall and correctly size fire sprinkler piping on the fire sprinkler plan sheet. 2-12-2019 JG// Permit is to remodel an existing 312 sq. ft. space. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of 28 lineal feet of interior non-bearing walls to create (2) offices and an open office area, select new door/door frames, suspended acoustic ceiling, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20196/20/2019 DONE
This permit finaled on the web by Will Harp
First Notice6/5/20196/5/20196/10/2019 DONE
DetailsJim Storey
mailed 6-11
BLD-Final6/4/20196/5/20196/5/2019APASS
DetailsJim Storey
Will Phone #: ###-####
DOC - Permit Finaled6/5/20196/5/20196/5/2019PPASS
DetailsJim Storey
FIRE-Final Inspection4/11/20194/11/20194/11/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Print Occupancy Form  2/22/2019 DONE
CHANGE STATUS TO (ISS)  2/22/2019 DONE
Plan assigned to (JG)2/5/20192/5/20192/20/2019 PASS
DetailsJavier Guzman
Plan Mod Photronics Office Remodel ePlan, pend fire
Permit Ready to Issue  2/20/2019 DONE
please do not re issue-plan mod
Routing - FIRE2/13/20192/13/20192/13/2019 PASS
DetailsErika Akin
No change to previous plan review comments. Fire sprinkler plans and permit shall include any revisions to system.
Routing - PLAN CHECK2/13/2019 2/13/2019 PASS
DetailsJavier Guzman
Route to Impact Fee Review2/5/20192/8/20192/6/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan Modification Accepted  2/5/2019 DONE
-add new walls to drawings 139356.FP21, 139356.F2.11 and 139356.F2.12.
-revised incorrecto line size on FP21, was originally marked as a 1" pipe. changed to 1 1/4" pipe.
-Drawings 139356.F2.11 and 139356.F2.12 are underf FIR19-00069. all changes were proposed by Fire Inspector
BLD-Framing/Rough-in1/30/20191/31/20191/31/2019PPASS
DetailsJim Storey
Will Phone #: ###-####
Issue PAID IN FULL permit  1/24/2019 DONE
Inspection Record Card- Bld  1/24/2019 DONE
Plan assigned to (JG)1/3/20191/3/20191/23/2019 PASS
DetailsJavier Guzman
1/22 L2 Photoronics Office Remodel, Eplan
Routing - FIRE1/3/20191/3/20191/23/2019 PASS
DetailsErika Akin
Attached comments to case
1st review completed  1/23/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/23/2019 DONE
Permit Ready to Issue  1/23/2019 DONE
met
NEED
REVISED VALUE (COMPANY NAME DOESN'T MATCH RCE
GC FORM
Routing - PLAN CHECK1/3/2019 1/23/2019 PASS
DetailsJavier Guzman
Routing - MECHANICAL1/3/2019 1/9/2019 PASS
DetailsTroy James
Intake Approval  1/3/2019 PASS
DetailsMichael Hanson
Application received  12/19/2018 DONE
Application submitted via PDS Online on Dec 19 2018 11:31AM