Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-04514
StatusFinaled
Name BILTMORE COMPANY
Site Address 13827 W MEADOWDALE ST
Project NameBoise Premier Office Bldg
Customer Number 
ePlanReviewYes
Description
(BOISE PREMIER OFFICE BUILDING) **5/9/2019 PLAN MODIFICATION TO REDUCE THE NUMBER OF HVAC UNITS FROM 3 TO 2. REVISIONS TO M, P, AND E SHEETS. (DRH18-000481) This building does not have a fire sprinkler system. To construct a two-story office building having a total floor area of about 4,944 square feet. One tenant will be occupying both stories (First Floor = 3,131 SF and Second Floor = 1,813 SF). Work is to include concrete footings, concrete foundation walls, crawl space, exterior concrete stairway to serve the below grade level, concrete retaining walls at the stairway, wood joist floor system recessed down into the perimeter concrete foundation walls with wood sheathing, wood beams and columns to support the floor, wood stud bearing walls to support the floor, 2x6 wood stud exterior bearing walls, wood stud shear walls with structural sheathing and hold downs, exterior stucco wall finish, exterior stone veneer wall finish, exterior windows, exterior doors, wood roof structure using energy trusses with a vented attic, concrete tile roof covering, metal roof covering, roof gutters and downspouts, interior non-bearing walls with gypsum wall board, 2 single-user toilet rooms accessible to the disabled, interior doors, interior windows, millwork, and finishes. Special inspections are required per the structural drawings and form #310. The design for the roof trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/28/201910/4/2019 DONE
This permit finaled on the web by Jeremy Amar
First Notice 8/23/20199/18/2019 DONE
mailed 9-19-19
BLD-Final8/13/20198/13/20198/13/2019PPASS
DetailsTell Riley
Pat Phone #: ###-####//ok per plans//
Permanent Occupancy  8/13/2019 DONE
BLD-Final7/31/20198/1/20198/1/2019PNR
DetailsTell Riley
Pat Phone #: ###-####//exit signs ok//break room counter height needs to be 34" per plans//bathroom sink clearance needs 2'5" floor to bottom of sink//
Zoning Approval8/1/20198/1/20198/1/2019 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection7/30/20197/31/20197/31/2019APASS
DetailsTroy Cobbley
Life safety passed. The exit discharge light at the main exit to be relocated to below the canopy and the south exit door exit sign/emergency light repaired prior to a building inspection

Pat Phone #: ###-####
BLD-Final7/30/20197/31/20197/31/2019PCANC
DetailsTell Riley
Pat Phone #: ###-####//Pat cancelled via text//
FIRE-Final Inspection7/30/20197/30/20197/30/2019PFAIL
DetailsTroy Cobbley
Provide small documents, repair the exit signs and emergency lights, relocate the main exit discharge light to be installed below the canopy.

Please call ahead for access - Pat Phone #: ###-####
BLD-Energy code compliance5/28/20195/29/20195/29/2019APASS
DetailsBrandon Shaw
pat Phone #: ###-####
BLD-Framing/Rough-in5/17/20195/20/20195/20/2019AFAIL
DetailsJim Sly
Pat Phone #: ###-####
C/N posted.....Misc corrections....including Stairways not per Commercial code.
CHANGE STATUS TO (ISS)  5/10/2019 DONE
Print Occupancy Form  5/10/2019 DONE
OVERRIDE  5/9/2019  
Plan assigned to (JHB)4/30/20194/30/20195/9/2019 PASS
DetailsJoe Bruce
05/16 (plan mod) Boise Premier Office Bldg, ePlan
Routing - PLAN CHECK5/2/2019 5/9/2019 PASS
DetailsJoe Bruce
Permit Ready to Issue  5/9/2019 DONE
PLAN MOD
Routing - MECHANICAL5/2/2019 5/7/2019 PASS
DetailsTroy James
Routing - PLUMBING5/2/2019 5/7/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Plan Modification Accepted  5/2/2019 DONE
DetailsJoe Bruce
Plan Modification Accepted  4/30/2019 DONE
plan mod sttarted in e plan-changes are 3 HVAC units reduced to 2. Sheets E-1, E-2, E-5, M-1, M-2, M-3, M-4, P-1, P-2, P-3 & P-4-assigned to Joe B
BLD-Wall Bracing4/18/20194/19/20194/19/2019APART
DetailsJim Sly
Pat Phone #: ###-####
Exterior nailing only......OK
BLD-Foundation3/20/20193/21/20193/21/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing3/18/20193/19/20193/19/2019PPASS
DetailsJim Sly
dane Phone #: ###-####
BLD-Footing3/15/20193/18/20193/18/2019PCANC
DetailsMike Jordan
Dane Phone #: ###-####. Cancelled per contractor
Issue PAID IN FULL permit  3/6/2019 DONE
Print Occupancy Form  3/6/2019 DONE
OVERRIDE  3/1/2019  
Plan assigned to (JHB)12/21/201812/27/20183/1/2019 PASS
DetailsJoe Bruce
03/06 (4th Resub) 01/24 (5 wks) - 502 Boise Premier Office Bldg, Struc.
Routing Off Site - STRUCTURAL2/28/2019 3/1/2019 PASS
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  3/1/2019 DONE
Permit Ready to Issue  3/1/2019 DONE
MET jeremy@biltmoreco.com
Need:
ACHD
GC
Revised Value
Plan resubmittals received  2/28/2019 DONE
DetailsJoe Bruce
Plan resubmittals requested  2/27/2019 DONE
DetailsJoe Bruce
Spoke with Marla over the phone about additional structural comments.
Routing - PLAN CHECK2/25/2019 2/27/2019 PASS
DetailsJoe Bruce
Routing Off Site - STRUCTURAL2/25/2019 2/27/2019 FAIL
DetailsJoe Bruce
AHJ
Routing PW Sewer Design2/25/2019 2/26/2019 PASS
DetailsDeAnn Brown
Routing - Design Review2/25/2019 2/26/2019 PASS
DetailsKatelyn Menuge
Routing - Erosion and Sediment2/25/2019 2/25/2019 PASS
DetailsMichael Zawacki
RP needed. Site prep inspection required.
Plan resubmittals received  2/25/2019 DONE
DetailsJoe Bruce
Routing - FIRE2/13/20192/13/20192/20/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK2/13/2019 2/20/2019 FAIL
DetailsJoe Bruce
Routing PW Sewer Design2/13/2019 2/20/2019 FAIL
DetailsDeAnn Brown
Please submit civil plans that show continuation of waste line to connection with wet-line sewer service.
Plan resubmittals requested  2/20/2019 DONE
DetailsJoe Bruce
Emailed comments and plan review report to architect. **JHB**
Routing Off Site - STRUCTURAL2/13/2019 2/18/2019 FAIL
DetailsJoe Bruce
AHJ - Resubmittal required.
Routing - MECHANICAL2/13/2019 2/14/2019 PASS
DetailsTroy James
Routing - Erosion and Sediment2/13/2019 2/14/2019 FAIL
DetailsMichael Zawacki
Still needs site map showing BMPs. Talked to designer after first review, will allow without narrative but needs map showing erosion controls.
Routing - Design Review2/13/2019 2/14/2019 PASS
DetailsKatelyn Menuge
Per Cody, conditions of CUP04-00140 are not applicable.
Plan resubmittals received  2/12/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review1/24/20191/27/20191/25/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan resubmittals requested  1/25/2019 DONE
DetailsJoe Bruce
Emailed plan review report to architect. **JHB**
Routing - FIRE12/21/201812/27/20181/24/2019 FAIL
DetailsErika Akin
Attached commetns to case and emailed architect
Routing - PLAN CHECK12/27/2018 1/24/2019 FAIL
DetailsJoe Bruce
1st review completed  1/24/2019 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL12/27/2018 1/16/2019 FAIL
DetailsJoe Bruce
AHJ
Routing PW Street Lights12/28/2018 1/3/2019 PASS
DetailsTom Marshall
Routing PW Solid Waste12/28/2018 1/2/2019 PASS
DetailsEvan Carpenter
Routing PW Drainage12/28/2018 12/31/2018 PASS
DetailsBrian Murphy
PAD SITE DRAINGE IN
Routing PW Sewer Design12/28/2018 12/28/2018 FAIL
DetailsDeAnn Brown
Submit site civil/utility plans showing sewer connection between building and existing service line.
Routing - PUBLIC WORKS12/27/2018 12/28/2018 PASS
DetailsAngela Hardy
Routing - MECHANICAL12/27/2018 12/28/2018 FAIL
DetailsTroy James
Gas pipe sizing
Routing - PLANNING12/27/2018 12/28/2018 PASS
DetailsKatelyn Menuge
Routing - Design Review12/27/2018 12/28/2018 FAIL
DetailsKatelyn Menuge
Complete the requirements of CUP04-00140 or obtain approval to modify the conditions.
Routing - Addressing12/27/2018 12/27/2018 PASS
DetailsDoug Chausow
Routing - PLUMBING12/27/2018 12/27/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Erosion and Sediment12/27/2018 12/27/2018 FAIL
DetailsMichael Zawacki
No ESC narrative or site map included.
Intake Approval  12/21/2018 PASS
DetailsMichael Hanson
Prescreen approved per M_H
Application received  12/20/2018 DONE
Application submitted via PDS Online on Dec 20 2018 11:52AM