Second Notice | | 9/28/2019 | 10/4/2019 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
First Notice | | 8/23/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19
|
BLD-Final | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Tell Riley
|
|
|
Pat Phone #: ###-####//ok per plans//
|
Permanent Occupancy | | | 8/13/2019 | | DONE |
|
|
|
|
BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | NR |
Tell Riley
|
|
|
Pat Phone #: ###-####//exit signs ok//break room counter height needs to be 34" per plans//bathroom sink clearance needs 2'5" floor to bottom of sink//
|
Zoning Approval | 8/1/2019 | 8/1/2019 | 8/1/2019 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The exit discharge light at the main exit to be relocated to below the canopy and the south exit door exit sign/emergency light repaired prior to a building inspection
Pat Phone #: ###-####
|
BLD-Final | 7/30/2019 | 7/31/2019 | 7/31/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####//Pat cancelled via text//
|
FIRE-Final Inspection | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, repair the exit signs and emergency lights, relocate the main exit discharge light to be installed below the canopy.
Please call ahead for access - Pat Phone #: ###-####
|
BLD-Energy code compliance | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Brandon Shaw
|
|
|
pat Phone #: ###-####
|
BLD-Framing/Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | FAIL |
Jim Sly
|
|
|
Pat Phone #: ###-#### C/N posted.....Misc corrections....including Stairways not per Commercial code.
|
CHANGE STATUS TO (ISS) | | | 5/10/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/9/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 4/30/2019 | 4/30/2019 | 5/9/2019 | | PASS |
Joe Bruce
|
|
|
05/16 (plan mod) Boise Premier Office Bldg, ePlan
|
Routing - PLAN CHECK | 5/2/2019 | | 5/9/2019 | | PASS |
Joe Bruce
|
|
|
|
Permit Ready to Issue | | | 5/9/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing - MECHANICAL | 5/2/2019 | | 5/7/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/2/2019 | | 5/7/2019 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Plan Modification Accepted | | | 5/2/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan Modification Accepted | | | 4/30/2019 | | DONE |
|
|
|
plan mod sttarted in e plan-changes are 3 HVAC units reduced to 2. Sheets E-1, E-2, E-5, M-1, M-2, M-3, M-4, P-1, P-2, P-3 & P-4-assigned to Joe B
|
BLD-Wall Bracing | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### Exterior nailing only......OK
|
BLD-Foundation | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
BLD-Footing | 3/15/2019 | 3/18/2019 | 3/18/2019 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Cancelled per contractor
|
Issue PAID IN FULL permit | | | 3/6/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/6/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/1/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 12/21/2018 | 12/27/2018 | 3/1/2019 | | PASS |
Joe Bruce
|
|
|
03/06 (4th Resub) 01/24 (5 wks) - 502 Boise Premier Office Bldg, Struc.
|
Routing Off Site - STRUCTURAL | 2/28/2019 | | 3/1/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/1/2019 | | DONE |
|
|
|
MET jeremy@biltmoreco.com
Need:
ACHD
GC
Revised Value
|
Plan resubmittals received | | | 2/28/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 2/27/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Marla over the phone about additional structural comments.
|
Routing - PLAN CHECK | 2/25/2019 | | 2/27/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 2/25/2019 | | 2/27/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Sewer Design | 2/25/2019 | | 2/26/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 2/25/2019 | | 2/26/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Erosion and Sediment | 2/25/2019 | | 2/25/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed. Site prep inspection required.
|
Plan resubmittals received | | | 2/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 2/13/2019 | 2/13/2019 | 2/20/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 2/13/2019 | | 2/20/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing PW Sewer Design | 2/13/2019 | | 2/20/2019 | | FAIL |
DeAnn Brown
|
|
|
Please submit civil plans that show continuation of waste line to connection with wet-line sewer service.
|
Plan resubmittals requested | | | 2/20/2019 | | DONE |
Joe Bruce
|
|
|
Emailed comments and plan review report to architect. **JHB**
|
Routing Off Site - STRUCTURAL | 2/13/2019 | | 2/18/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Resubmittal required.
|
Routing - MECHANICAL | 2/13/2019 | | 2/14/2019 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 2/13/2019 | | 2/14/2019 | | FAIL |
Michael Zawacki
|
|
|
Still needs site map showing BMPs. Talked to designer after first review, will allow without narrative but needs map showing erosion controls.
|
Routing - Design Review | 2/13/2019 | | 2/14/2019 | | PASS |
Katelyn Menuge
|
|
|
Per Cody, conditions of CUP04-00140 are not applicable.
|
Plan resubmittals received | | | 2/12/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 1/24/2019 | 1/27/2019 | 1/25/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 1/25/2019 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to architect. **JHB**
|
Routing - FIRE | 12/21/2018 | 12/27/2018 | 1/24/2019 | | FAIL |
Erika Akin
|
|
|
Attached commetns to case and emailed architect
|
Routing - PLAN CHECK | 12/27/2018 | | 1/24/2019 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 1/24/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 12/27/2018 | | 1/16/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Street Lights | 12/28/2018 | | 1/3/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 12/28/2018 | | 1/2/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 12/28/2018 | | 12/31/2018 | | PASS |
Brian Murphy
|
|
|
PAD SITE DRAINGE IN
|
Routing PW Sewer Design | 12/28/2018 | | 12/28/2018 | | FAIL |
DeAnn Brown
|
|
|
Submit site civil/utility plans showing sewer connection between building and existing service line.
|
Routing - PUBLIC WORKS | 12/27/2018 | | 12/28/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 12/27/2018 | | 12/28/2018 | | FAIL |
Troy James
|
|
|
Gas pipe sizing
|
Routing - PLANNING | 12/27/2018 | | 12/28/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 12/27/2018 | | 12/28/2018 | | FAIL |
Katelyn Menuge
|
|
|
Complete the requirements of CUP04-00140 or obtain approval to modify the conditions.
|
Routing - Addressing | 12/27/2018 | | 12/27/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 12/27/2018 | | 12/27/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 12/27/2018 | | 12/27/2018 | | FAIL |
Michael Zawacki
|
|
|
No ESC narrative or site map included.
|
Intake Approval | | | 12/21/2018 | | PASS |
Michael Hanson
|
|
|
Prescreen approved per M_H
|
Application received | | | 12/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2018 11:52AM
|