BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/22/2020 | P | PART |
Dave Hannah
|
|
|
Lio Frey Phone #: ###-#### headers over new openning ok
|
BLD-Framing/Rough-in | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PART |
Dave Hannah
|
|
|
Lio Phone #: ###-#### small kitchen area ok to cover
|
CHANGE STATUS TO (ISS) | | | 11/18/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/29/2019 | 10/29/2019 | 11/15/2019 | | PASS |
Carl Westfall
|
|
|
plan mod #2 - Wild Root (back to applicant)
|
Routing - PLAN CHECK | 11/14/2019 | | 11/15/2019 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
Plan mod approved
|
Plan resubmittals received | | | 11/14/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/8/2019 | | 11/12/2019 | | FAIL |
Carl Westfall
|
|
|
Back from the permits desk
Applicant mus upload the structural calculations that substantiate the design into the Documents Folder.
|
Plan resubmittals requested | | | 11/12/2019 | | DONE |
|
|
|
Applicant must upload the structural calculations that substantiate the design into the Documents Folder.
|
Routing - PLAN CHECK | 11/8/2019 | | 11/8/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake approved.
|
Routing - PLAN CHECK | 11/1/2019 | | 11/5/2019 | | FAIL |
Carl Westfall
|
|
|
2nd plan mod plan intake review. Need the structural drawings stamped and signed.
|
Plan Modification Accepted | | | 10/29/2019 | | DONE |
|
|
|
plan mod #2
The new stairway to the basement will now use a steel structure instead of the originally proposed wood structure.The existing first floor stairway flight and midpoint landing will be removed and the marble finish materials will be salvaged. This stairway and landing will be supported by a new steel structure and the salvaged marble treads and risers will be re-installed on the new structure.
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Mike Jordan
|
|
|
Leo Phone #: ###-####. Ok to sheet rock 1 hr wall. Need to verify that window frame is taged .
|
BLD-Framing/Rough-in | 10/2/2019 | 10/3/2019 | 10/4/2019 | A | PART |
Dave Hannah
|
|
|
LIO Phone #: ###-#### ok to cover office and green rm
|
Plan assigned to (CJW) | 7/1/2019 | 7/1/2019 | 7/19/2019 | | PASS |
Carl Westfall
|
|
|
plan mod - Wild Root Restaurant (waiting for phone call from applicant)
|
Routing - PLAN CHECK | 7/18/2019 | | 7/19/2019 | | PASS |
Carl Westfall
|
|
|
Back from the permits desk. Plan mod review approved.
|
Plan Reviewer's activity | | | 7/19/2019 | | PASS |
|
|
|
Plan mod review approved
|
Permit Ready to Issue | | | 7/19/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/19/2019 | | DONE |
|
|
|
plan mod
|
Plan resubmittals received | | | 7/17/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/17/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake review approved
|
Plan Reviewer's activity | | | 7/2/2019 | | FAIL |
Carl Westfall
|
|
|
Plan mod intake review failed and revised drawings requested
|
Plan Modification Accepted | | | 7/1/2019 | | DONE |
|
|
|
Modify the configuration of the stairway to the basement.
Sheets: A1.0, A2.0, A2.1, A2.1.1
|
Issue PAID IN FULL permit | | | 5/6/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/6/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/3/2019 | 5/6/2019 | 5/3/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CJW) | 4/6/2019 | 4/6/2019 | 5/3/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 04/24/19 (L-3 - 15 days) (eplan - 7 sheets) The Wild Root L-3 (back to applicant)
|
Plan resubmittals requested | | | 5/3/2019 | | DONE |
|
|
|
Work flow routed back to applicant
|
Plan resubmittals received | | | 5/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/3/2019 | | 5/3/2019 | | PASS |
Carl Westfall
|
|
|
2nd plan review approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2019 | | DONE |
|
|
|
All met
Need GC
Need rev cert of val
please make sure PRK has signed off on their task
|
Routing - FIRE | 4/6/2019 | 4/6/2019 | 5/1/2019 | | PASS |
Mark Scharfen
|
|
|
IFC review complete 05.01.2019. Uploaded REV_fire 05.01.2019.pdf.
|
1st review completed | | | 5/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/6/2019 | | 4/29/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Plan resubmittals requested | | | 4/29/2019 | | DONE |
|
|
|
Plan review report Emailed to the Architect and to the applicant
|
Routing Off Site - C.D.H | 4/6/2019 | | 4/18/2019 | | PASS |
Carl Westfall
|
|
|
Scott Paradis
|
Routing - MECHANICAL | 4/6/2019 | | 4/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/9/2019 | | 4/9/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 4/6/2019 | | 4/8/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/6/2019 | | 4/8/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 4/4/2019 | | PASS |
|
|
|
|
Intake Approval | | | 3/29/2019 | | FAIL |
Joe Bruce
|
|
|
1) Provide Site Specific fire flow at fire hydrants. This could not be found in the documents folder.
2) The sheet index does not include the additional structural drawings. Revise the sheet index on the cover sheet to include all drawings
|
Intake Approval | | | 12/28/2018 | | FAIL |
Joe Bruce
|
|
|
1) Provide structural calculations and details for the new floor framing, stair framing, and guardrail on sheet A2.0 that comply with IBC Chapter 16.
2) This application should be submitted as a #520 Major Tenant Improvement due to the change in use of common space to a higher hazard assembly space. Upload a #520 checklist with the additional items required by this application.
|
Application received | | | 12/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2018 6:17PM
|