Permit Information
Permit NumberBLD18-04525
StatusIssued
Name PARKLANE MANAGEMENT COMPANY LLC
Site Address 276 N 8TH ST
Project NameWild Root Restaurant - Expand
Customer Number 
ePlanReviewYes
Description
(WILD ROOT RESTAURANT – TENANT EXPANSION) (11-15-19 PLAN MODIFICATION TO REPLACE THE FORMERLY PROPOSED NEW WOOD STAIRWAY BETWEEN THE 1ST STORY AND THE BASEMENT WITH A NEW STEEL STAIRWAY. IN ADDITION, TO REPLACE A PORTION OF THE EXISTING WOOD STAIRWAY BETWEEN THE 1ST STORY AND THE 2ND STORY WITH A NEW STEEL STAIRWAY. STRUCTURAL WORK INCLUDES TUBE STEEL COLUMNS, STEEL ANGLES, TUBE STEEL STRINGERS, 3/16” THICK METAL PAN RISERS AND TREADS, 3/16” THICK METAL PAN LANDINGS, AND STEEL PLATE COLUMN CAPS. SPECIAL INSPECTION IS REQUIRED FOR SOILS, CONCRETE, WELDING, AND FOR ANCHORS POST-INSTALLED IN HARDENED CONCRETE OR MASONRY. THE MARBLE FINISH MATERIALS FROM THE DEMOLISHED ORIGINAL STAIRWAY BETWEEN THE 1ST STORY AND THE 2ND STORY WILL BE SALVAGED AND RE-USED WITH THE FORMER RISE AND RUN OF THE STAIRWAY DUPLICATED. TREAD RISES AND RUNS THROUGHOUT A FLIGHT ARE REQUIRED TO BE UNIFORM. THE LENGTH OF STAIRWAY FLIGHTS WILL BE ADJUSTED FROM WHAT WAS FORMERLY APPROVED. A MINIMUM HEADROOM OF 6 FEET 8 INCHES AT THE STAIRWAYS IS REQUIRED TO BE MAINTAINED.) (7-19-19 PLAN MODIFICATION TO RECONFIGURE THE NEW BASEMENT STAIRWAY AND TO CREATE A STORAGE ROOM ABOVE AND A STORAGE ROOM BELOW WHERE THE FORMER STAIRWAY WAS LOCATED.) The fire sprinkler system is used for building height and story increase. To expand an existing 1,551 square foot restaurant by about 362 square feet into an adjacent building common area on the 1st story. This restaurant is being converted to an A-2 Occupancy. The dining area will be expanded by about 293 square feet and the kitchen will be expanded by about 69 square feet. After the expansion, this tenant space will have a total floor area of about 1,924 square feet (1,049 square feet dining and 858 square feet kitchen). The tenant expansion requires that a basement stairway be demolished and re-constructed to connect to the 1st story building common area on the opposite side of the elevators. Stairway work includes concrete footings, 1-hr bearing walls, a new beam, stairway stringers, landings, and guards. All joist hangers are required to be oriented per the manufactures installation instructions. A compliant egress system is required to be maintained from the basement during construction as required by the Fire Department. Restaurant work includes interior nonbearing walls, a relocated egress door, relocated glazing, guards, and relocated kitchen equipment. The existing atrium enclosure with glass and fire sprinkler heads is required to be maintained in compliance with former approvals. Both of the required exits that serve the existing hostel located on the 1st story on the South side of this tenant space are to the outside at grade. One of those exits also serves as an accessible route. The hostel will lose its interior access to the building elevators and its interior access to the building toilet rooms. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in1/21/20201/21/20201/22/2020PPART
DetailsDave Hannah
Lio Frey Phone #: ###-#### headers over new openning ok
BLD-Framing/Rough-in12/11/201912/12/201912/12/2019APART
DetailsDave Hannah
Lio Phone #: ###-#### small kitchen area ok to cover
CHANGE STATUS TO (ISS)  11/18/2019 DONE
Plan assigned to (CJW)10/29/201910/29/201911/15/2019 PASS
DetailsCarl Westfall
plan mod #2 - Wild Root (back to applicant)
Routing - PLAN CHECK11/14/2019 11/15/2019 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/15/2019 DONE
Permit Ready to Issue  11/15/2019 DONE
Plan mod approved
Plan resubmittals received  11/14/2019 DONE
Routing - PLAN CHECK11/8/2019 11/12/2019 FAIL
DetailsCarl Westfall
Back from the permits desk

Applicant mus upload the structural calculations that substantiate the design into the Documents Folder.
Plan resubmittals requested  11/12/2019 DONE
Applicant must upload the structural calculations that substantiate the design into the Documents Folder.
Routing - PLAN CHECK11/8/2019 11/8/2019 PASS
DetailsCarl Westfall
Plan mod plan intake approved.
Routing - PLAN CHECK11/1/2019 11/5/2019 FAIL
DetailsCarl Westfall
2nd plan mod plan intake review. Need the structural drawings stamped and signed.
Plan Modification Accepted  10/29/2019 DONE
plan mod #2
The new stairway to the basement will now use a steel structure instead of the originally proposed wood structure.The existing first floor stairway flight and midpoint landing will be removed and the marble finish materials will be salvaged. This stairway and landing will be supported by a new steel structure and the salvaged marble treads and risers will be re-installed on the new structure.
BLD-Framing/Rough-in10/24/201910/25/201910/25/2019APART
DetailsMike Jordan
Leo Phone #: ###-####. Ok to sheet rock 1 hr wall. Need to verify that window frame is taged .
BLD-Framing/Rough-in10/2/201910/3/201910/4/2019APART
DetailsDave Hannah
LIO Phone #: ###-#### ok to cover office and green rm
Plan assigned to (CJW)7/1/20197/1/20197/19/2019 PASS
DetailsCarl Westfall
plan mod - Wild Root Restaurant (waiting for phone call from applicant)
Routing - PLAN CHECK7/18/2019 7/19/2019 PASS
DetailsCarl Westfall
Back from the permits desk. Plan mod review approved.
Plan Reviewer's activity  7/19/2019 PASS
Plan mod review approved
Permit Ready to Issue  7/19/2019 DONE
CHANGE STATUS TO (ISS)  7/19/2019 DONE
plan mod
Plan resubmittals received  7/17/2019 DONE
Plan Reviewer's activity  7/17/2019 PASS
DetailsCarl Westfall
Plan mod plan intake review approved
Plan Reviewer's activity  7/2/2019 FAIL
DetailsCarl Westfall
Plan mod intake review failed and revised drawings requested
Plan Modification Accepted  7/1/2019 DONE
Modify the configuration of the stairway to the basement.
Sheets: A1.0, A2.0, A2.1, A2.1.1
Issue PAID IN FULL permit  5/6/2019 DONE
Print Occupancy Form  5/6/2019 DONE
Route to Impact Fee Review5/3/20195/6/20195/3/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (CJW)4/6/20194/6/20195/3/2019 PASS
DetailsCarl Westfall
(1st done) 04/24/19 (L-3 - 15 days) (eplan - 7 sheets) The Wild Root L-3 (back to applicant)
Plan resubmittals requested  5/3/2019 DONE
Work flow routed back to applicant
Plan resubmittals received  5/3/2019 DONE
Routing - PLAN CHECK5/3/2019 5/3/2019 PASS
DetailsCarl Westfall
2nd plan review approved
PLANS/APPL TAKEN TO FRONT DESK  5/3/2019 DONE
Permit Ready to Issue  5/3/2019 DONE
All met

Need GC
Need rev cert of val
please make sure PRK has signed off on their task
Routing - FIRE4/6/20194/6/20195/1/2019 PASS
DetailsMark Scharfen
IFC review complete 05.01.2019. Uploaded REV_fire 05.01.2019.pdf.
1st review completed  5/1/2019 DONE
Routing - PLAN CHECK4/6/2019 4/29/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Plan resubmittals requested  4/29/2019 DONE
Plan review report Emailed to the Architect and to the applicant
Routing Off Site - C.D.H4/6/2019 4/18/2019 PASS
DetailsCarl Westfall
Scott Paradis
Routing - MECHANICAL4/6/2019 4/11/2019 PASS
DetailsTroy James
Routing - PLUMBING4/9/2019 4/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing4/6/2019 4/8/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/6/2019 4/8/2019 PASS
DetailsAngela Hardy
Intake Approval  4/4/2019 PASS
Intake Approval  3/29/2019 FAIL
DetailsJoe Bruce
1) Provide Site Specific fire flow at fire hydrants. This could not be found in the documents folder.
2) The sheet index does not include the additional structural drawings. Revise the sheet index on the cover sheet to include all drawings
Intake Approval  12/28/2018 FAIL
DetailsJoe Bruce
1) Provide structural calculations and details for the new floor framing, stair framing, and guardrail on sheet A2.0 that comply with IBC Chapter 16.
2) This application should be submitted as a #520 Major Tenant Improvement due to the change in use of common space to a higher hazard assembly space. Upload a #520 checklist with the additional items required by this application.
Application received  12/20/2018 DONE
Application submitted via PDS Online on Dec 20 2018 6:17PM