Permit Information
Permit NumberBLD18-04526
StatusIssued
Name COMPONENTS PLUS
Site Address 305 N 9TH ST
Project NameYen Ching Bar
Customer NumberDEMO BLD19-00097
ePlanReviewYes
Description
(YEN CHING) Permit is to remodel approx. 1,366 sq. ft. on the north east portion of an existing restaurant assembly building to provide a bar and dining area. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select interior nonbearing walls, removal of select door/door frame, removal of kitchen type 1 hood and kitchen equipment, removal of select light fixtures, removal of select suspended acoustic ceiling, gypsum soffit ceiling, construction of interior non-bearing walls to create a storage closet, an accessible restroom, a storage room, a new bar counter, select new built-in dinning bench, millwork, select new suspended acoustic and gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. NOTE: Under BLD00-02793 the one-hour rated occupancy separation is required to be maintained so assembly restaurant (under 5,000 sq. ft.) does not require fire sprinklers. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/16/20195/16/20195/16/2019PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Final5/13/20195/14/20195/14/2019APEND
DetailsDave Hannah
Rick Phone #: ###-#### needs to move sink over in rest room
FIRE-Final Inspection5/13/20195/14/20195/14/2019APASS
DetailsJim Page
Previously noted items have been corrected, round type door hardware is going to be replaced with paddle type hardware when recieved (paddle type is ordered but on its way). Final life fire safety inspection for area of work complete.

Rick Phone #: ###-####
BLD-Final5/10/20195/13/20195/13/2019PNR
DetailsBrandon Shaw
Rick Phone #: ###-####
BLD-Blower Door Test Results5/13/20195/13/20195/13/2019PCANC
DetailsBrandon Shaw
FIRE-Final Inspection5/10/20195/13/20195/13/2019AFAIL
DetailsJim Page
Provide emergency lighting for exit discharge above northeast exterior exit. Install single action door hardware on restroom that has round type door hardware. Provide maximum occupancy placard.

Rick Phone #: ###-####
BLD-Final5/10/20195/10/20195/10/2019PNR
DetailsDave Hannah
as late as possible / Rick Phone #: ###-####
BLD-Ceiling Grid Inspection3/21/20193/21/20193/21/2019PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Energy code compliance2/25/20192/25/20192/25/2019PPASS
DetailsJim Sly
for sound walls-Rick Phone #: ###-####
BLD-Framing/Rough-in2/20/20192/21/20192/21/2019APASS
DetailsDave Hannah
Rick Phone #: ###-####-needs partial-north walls steel studs
Plan assigned to (JG)1/4/20191/4/20191/23/2019 PASS
DetailsJavier Guzman
1st rev comp, 1/16 L2 Yen Ching Bar ePlan
Routing - PLAN CHECK1/18/2019 1/23/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/23/2019 DONE
Permit Ready to Issue  1/23/2019 DONE
met
componentsplus@msn.com
Issue PAID IN FULL permit  1/23/2019 DONE
Inspection Record Card- Bld  1/23/2019 DONE
Route to Impact Fee Review1/16/20191/19/20191/17/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/16/2019 DONE
DetailsJavier Guzman
Routing - PLAN CHECK1/4/2019 1/16/2019 FAIL
DetailsJavier Guzman
Routing PW Environmental1/4/2019 1/14/2019 PASS
DetailsRick Christenson
Routing - Addressing1/4/2019 1/4/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/4/2019 1/4/2019 PASS
DetailsMorgan Webb
Intake Approval  1/3/2019 PASS
DetailsJavier Guzman
Intake Approval  12/24/2018 FAIL
DetailsBrian McGowan
The following items must be provided prior to approval of the prescreen.
1. CDHD review or application for a Plan Review and Approval must be provided.
2. Mechanical Plan signed and stamped by AN Idaho Licensed Engineer or written approval from the Chief Plumbing/ Mechanical to let the Architect provide the drawings. (It was a bakery,
3. Plumbing Plan signed and stamped by AN Idaho Licensed Engineer or written approval from the Chief Plumbing/ Mechanical to let the Architect provide the drawings.
4. New lights are being added, lights are being removed. Please provide the Energy Code Compliance materials.
Application received  12/21/2018 DONE
Application submitted via PDS Online on Dec 21 2018 7:53AM