BLD-Final | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Final | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PEND |
Dave Hannah
|
|
|
Rick Phone #: ###-#### needs to move sink over in rest room
|
FIRE-Final Inspection | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, round type door hardware is going to be replaced with paddle type hardware when recieved (paddle type is ordered but on its way). Final life fire safety inspection for area of work complete.
Rick Phone #: ###-####
|
BLD-Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | P | NR |
Brandon Shaw
|
|
|
Rick Phone #: ###-####
|
BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Jim Page
|
|
|
Provide emergency lighting for exit discharge above northeast exterior exit. Install single action door hardware on restroom that has round type door hardware. Provide maximum occupancy placard.
Rick Phone #: ###-####
|
BLD-Final | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | NR |
Dave Hannah
|
|
|
as late as possible / Rick Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Energy code compliance | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Jim Sly
|
|
|
for sound walls-Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####-needs partial-north walls steel studs
|
Plan assigned to (JG) | 1/4/2019 | 1/4/2019 | 1/23/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 1/16 L2 Yen Ching Bar ePlan
|
Routing - PLAN CHECK | 1/18/2019 | | 1/23/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/23/2019 | | DONE |
|
|
|
met
componentsplus@msn.com
|
Issue PAID IN FULL permit | | | 1/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/16/2019 | 1/19/2019 | 1/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/16/2019 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/4/2019 | | 1/16/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Environmental | 1/4/2019 | | 1/14/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 1/4/2019 | | 1/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/4/2019 | | 1/4/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/3/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/24/2018 | | FAIL |
Brian McGowan
|
|
|
The following items must be provided prior to approval of the prescreen.
1. CDHD review or application for a Plan Review and Approval must be provided.
2. Mechanical Plan signed and stamped by AN Idaho Licensed Engineer or written approval from the Chief Plumbing/ Mechanical to let the Architect provide the drawings. (It was a bakery,
3. Plumbing Plan signed and stamped by AN Idaho Licensed Engineer or written approval from the Chief Plumbing/ Mechanical to let the Architect provide the drawings.
4. New lights are being added, lights are being removed. Please provide the Energy Code Compliance materials.
|
Application received | | | 12/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2018 7:53AM
|