Third Notice | | 2/12/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Second Notice | | 1/9/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
First Notice | | 12/20/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Permanent Occupancy | | | 12/10/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jay Phone #: ###-####
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-#### final perm ok pending all signoffs. // 12/10/19 TCH Everything signed off
|
FIRE-Final Inspection | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | NR |
Jim Page
|
|
|
AES did not pass inspection on 3DEC2019, inspection will not be completed until AES communicator is finaled, disposition will be labeled as not ready.
Jay Phone #: ###-####
|
PubWorks Occupancy Approval | 11/21/2019 | 11/21/2019 | 11/21/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | FAIL |
Jim Page
|
|
|
Repair exit discharge emergency lighting on west and northwest exits. Provide signage for fire alarm control panel room. AES communicator permit needs to be finaled before life fire safety inspection will be completed (FIR18-00152)
Jay Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-#### fire treated wood ok to cover// roof insulation ok
|
BLD-Framing/Rough-in | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Jim Storey
|
|
|
Jay-please call 30 minutes prior to meet for access Phone #: ###-#### need 34.2 verifacation of roof insulatio// fire treted backing required per plan.
|
Issue PAID IN FULL permit | | | 4/8/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2019 | | DONE |
|
|
|
Tried to get ahold of Mike Burden with Scott Hedrick Construction to get an email to send the permits over. Office message states the office is closed today.
|
Telephone call | | | 4/2/2019 | | DONE |
|
|
|
left a message for Mike B about revised value for BLD19-00064. informed the school district had called for fees to get a check
|
OVERRIDE | | | 3/5/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 2/22/2019 | 2/22/2019 | 3/5/2019 | | DONE |
Julie Romig
|
|
|
03/01 - 1st Rev Comp - 3rd Rev - Hawthorne Elem - 3rd Resubmittal at applicant's request for revisions to waterline.
|
Permit Ready to Issue | | | 3/5/2019 | | DONE |
|
|
|
NEED-met
RP
MET (was faxed in)
REVISED VALUE
*USE STATE FEES FOR SCHOOLS ( PLAN CHECK FEE)(OVER PAID CAUSE VALUE WENT DOWN AT LATER DATE- MATH INVOLVED)***
|
Routing - PLUMBING | 2/25/2019 | | 3/4/2019 | | PASS |
Dan Ediger
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | 2/25/2019 | | 2/26/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 2/25/2019 | | 2/25/2019 | | PASS |
Julie Romig
|
|
|
No building review required.
|
Plan resubmittals received | | | 2/22/2019 | | DONE |
|
|
|
permit has never been issued
|
OVERRIDE | | | 1/28/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 1/2/2019 | 1/3/2019 | 1/28/2019 | | DONE |
Julie Romig
|
|
|
02/01 - 3rd Rev - 1st Rev Comp - 502 Hawthorne Elementary Cafeteria Addition
|
Routing PW Sewer Design | 1/28/2019 | | 1/28/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 1/28/2019 | | 1/28/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2019 | | DONE |
|
|
|
***USE STATE FEES FOR SCHOOLS (OVER PAID CAUSE VALUE WENT DOWN AT LATER DATE- MATH INVOLVED)***
NEED
GC FORM
REVISED VALUE
|
Routing - FIRE | 1/23/2019 | 1/23/2019 | 1/25/2019 | | PASS |
Erika Akin
|
|
|
No changes to previous approval
|
Routing Off Site - STRUCTURAL | 1/23/2019 | | 1/23/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 1/23/2019 | | 1/23/2019 | | PASS |
Julie Romig
|
|
|
|
Routing PW Sewer Design | 1/23/2019 | | 1/23/2019 | | FAIL |
DeAnn Brown
|
|
|
Match crowns of 6" service and existing 8" sewer main at connection at manhole.
|
Route to Impact Fee Review | 1/16/2019 | 1/19/2019 | 1/16/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Meeting | | | 1/16/2019 | | DONE |
|
|
|
reduced valuation by $50K, customer combined BLD18-04527 (914,000) & BLD19-00064 (50,000) under original valuation. Refund request needed for reduction in value
|
Routing - FIRE | 1/2/2019 | 1/3/2019 | 1/15/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 1/3/2019 | | 1/15/2019 | | FAIL |
Julie Romig
|
|
|
Plan review report emailed to applicant.
|
1st review completed | | | 1/15/2019 | | DONE |
Julie Romig
|
|
|
|
Routing PW Environmental | 1/3/2019 | | 1/11/2019 | | PASS |
Terry Alber
|
|
|
Grease interceptor shown OK.
|
Routing Off Site - STRUCTURAL | 1/3/2019 | | 1/10/2019 | | FAIL |
Julie Romig
|
|
|
AHJ - Corrections required per ePlanReview
|
Routing - ELECTRICAL | 1/3/2019 | | 1/8/2019 | | PASS |
Javier Guzman
|
|
|
01/15 - **EXPEDITED REVIEW** - 502 Hawthorne Elementary Cafeteria Addition
|
Routing PW Drainage | 1/3/2019 | | 1/7/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 1/3/2019 | | 1/7/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Erosion and Sediment | 1/3/2019 | | 1/4/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified Plan Designer; need to identify certified RP prior to permit issue. Site Preparation inspection is REQUIRED.
|
Routing PW Solid Waste | 1/3/2019 | | 1/4/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - MECHANICAL | 1/3/2019 | | 1/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/3/2019 | | 1/3/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 1/3/2019 | | 1/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/3/2019 | | 1/3/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Street Lights | 1/3/2019 | | 1/3/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 1/3/2019 | | 1/3/2019 | | FAIL |
DeAnn Brown
|
|
|
Please alter sewer service connection at mainline per changemarks in eplanreview.
|
Intake Approval | | | 1/2/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by JHB
|
Intake Approval | | | 12/27/2018 | | FAIL |
Joe Bruce
|
|
|
1) On for #310 - Statement of Special Inspections: Select a special inspections firm on the first page and fill in the firms name and information.
2) Upload the planning and zoning letter(s) of approval into the documents folder.
3) The Architect License for Scott Henson is not valid. It has expired as of 12/15/2018. Provide valid proof that this license has been renewed prior to resubmittal of the prescreen.
4) Provide a site plan showing trash enclosures. This could not be located.
5) Sheet A6.1 is vertical. Rotate sheet so it is legible.
6) Identify the special inspections on the drawings - Sheet S0.01. Referencing form #310 does not specifically identify the required special inspections. All special inspections shall be listed including sprayed fire resistant materials per IBC section 1705.14
|
Application received | | | 12/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2018 9:14AM
|