Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD18-04527
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 2401 W TARGEE ST
Project NameHawthorne Elem Cafeteria Addit
Customer NumberBLD19-00064
ePlanReviewYes
Description
**2 PERMITS UNDER BLD18-04527 IN EPLAN** (HAWTHORNE ELEMENTARY CAFETERIA ADDITION) Permit for the construction of a new 4,214 sq ft free standing Cafeteria and Kitchen with 496 sq ft covered walkway and associated site work. The existing cafeteria will be remodeled into a music classroom under a separate permit, BLD19-00064. Special inspections required per the attached Form 310. This building is NOT fire sprinklered. The building will have a fire alarm with emergency voice evacuation. Fire Alarm system will require a separate permit and shall be installed per NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/12/20203/5/2020 DONE
mailed 3-6-20
Second Notice 1/9/20202/7/2020 DONE
mailed 2-10-20
First Notice 12/20/201912/30/2019 DONE
mailed 1-1-20
Permanent Occupancy  12/10/2019 DONE
FIRE-Final Inspection12/6/201912/9/201912/9/2019APASS
DetailsTroy Cobbley
Life safety passed.

Jay Phone #: ###-####
BLD-Final12/6/201912/9/201912/9/2019APASS
DetailsJim Storey
Jay Phone #: ###-#### final perm ok pending all signoffs. // 12/10/19 TCH Everything signed off
FIRE-Final Inspection12/3/201912/4/201912/4/2019PNR
DetailsJim Page
AES did not pass inspection on 3DEC2019, inspection will not be completed until AES communicator is finaled, disposition will be labeled as not ready.

Jay Phone #: ###-####
PubWorks Occupancy Approval11/21/201911/21/201911/21/2019 DONE
DetailsTiffany Lowery
FIRE-Final Inspection11/19/201911/20/201911/20/2019PFAIL
DetailsJim Page
Repair exit discharge emergency lighting on west and northwest exits. Provide signage for fire alarm control panel room. AES communicator permit needs to be finaled before life fire safety inspection will be completed (FIR18-00152)

Jay Phone #: ###-####
BLD-Ceiling Grid Inspection11/15/201911/15/201911/15/2019PPASS
DetailsJim Storey
Jay Phone #: ###-####
BLD-Framing/Rough-in8/9/20198/12/20198/12/2019PPASS
DetailsJim Storey
Jay Phone #: ###-#### fire treated wood ok to cover// roof insulation ok
BLD-Framing/Rough-in8/2/20198/5/20198/5/2019APART
DetailsJim Storey
Jay-please call 30 minutes prior to meet for access Phone #: ###-#### need 34.2 verifacation of roof insulatio// fire treted backing required per plan.
Issue PAID IN FULL permit  4/8/2019 DONE
Print Occupancy Form  4/8/2019 DONE
Telephone call  4/5/2019 DONE
Tried to get ahold of Mike Burden with Scott Hedrick Construction to get an email to send the permits over. Office message states the office is closed today.
Telephone call  4/2/2019 DONE
left a message for Mike B about revised value for BLD19-00064. informed the school district had called for fees to get a check
OVERRIDE  3/5/2019  
Plan assigned to (JAR)2/22/20192/22/20193/5/2019 DONE
DetailsJulie Romig
03/01 - 1st Rev Comp - 3rd Rev - Hawthorne Elem - 3rd Resubmittal at applicant's request for revisions to waterline.
Permit Ready to Issue  3/5/2019 DONE
NEED-met
RP

MET (was faxed in)
REVISED VALUE
*USE STATE FEES FOR SCHOOLS ( PLAN CHECK FEE)(OVER PAID CAUSE VALUE WENT DOWN AT LATER DATE- MATH INVOLVED)***
Routing - PLUMBING2/25/2019 3/4/2019 PASS
DetailsDan Ediger
per plans and ISPC
Routing - PUBLIC WORKS2/25/2019 2/26/2019 PASS
DetailsMorgan Webb
Routing - PLAN CHECK2/25/2019 2/25/2019 PASS
DetailsJulie Romig
No building review required.
Plan resubmittals received  2/22/2019 DONE
permit has never been issued
OVERRIDE  1/28/2019  
Plan assigned to (JAR)1/2/20191/3/20191/28/2019 DONE
DetailsJulie Romig
02/01 - 3rd Rev - 1st Rev Comp - 502 Hawthorne Elementary Cafeteria Addition
Routing PW Sewer Design1/28/2019 1/28/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK1/28/2019 1/28/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  1/28/2019 DONE
Permit Ready to Issue  1/28/2019 DONE
***USE STATE FEES FOR SCHOOLS (OVER PAID CAUSE VALUE WENT DOWN AT LATER DATE- MATH INVOLVED)***
NEED
GC FORM
REVISED VALUE
Routing - FIRE1/23/20191/23/20191/25/2019 PASS
DetailsErika Akin
No changes to previous approval
Routing Off Site - STRUCTURAL1/23/2019 1/23/2019 PASS
DetailsJulie Romig
Routing - PLAN CHECK1/23/2019 1/23/2019 PASS
DetailsJulie Romig
Routing PW Sewer Design1/23/2019 1/23/2019 FAIL
DetailsDeAnn Brown
Match crowns of 6" service and existing 8" sewer main at connection at manhole.
Route to Impact Fee Review1/16/20191/19/20191/16/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Meeting  1/16/2019 DONE
reduced valuation by $50K, customer combined BLD18-04527 (914,000) & BLD19-00064 (50,000) under original valuation. Refund request needed for reduction in value
Routing - FIRE1/2/20191/3/20191/15/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK1/3/2019 1/15/2019 FAIL
DetailsJulie Romig
Plan review report emailed to applicant.
1st review completed  1/15/2019 DONE
DetailsJulie Romig
Routing PW Environmental1/3/2019 1/11/2019 PASS
DetailsTerry Alber
Grease interceptor shown OK.
Routing Off Site - STRUCTURAL1/3/2019 1/10/2019 FAIL
DetailsJulie Romig
AHJ - Corrections required per ePlanReview
Routing - ELECTRICAL1/3/2019 1/8/2019 PASS
DetailsJavier Guzman
01/15 - **EXPEDITED REVIEW** - 502 Hawthorne Elementary Cafeteria Addition
Routing PW Drainage1/3/2019 1/7/2019 PASS
DetailsBrian Murphy
Routing - PLANNING1/3/2019 1/7/2019 PASS
DetailsNicolette Womack
Routing - Erosion and Sediment1/3/2019 1/4/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified Plan Designer; need to identify certified RP prior to permit issue. Site Preparation inspection is REQUIRED.
Routing PW Solid Waste1/3/2019 1/4/2019 PASS
DetailsEvan Carpenter
Routing - MECHANICAL1/3/2019 1/4/2019 PASS
DetailsTroy James
Routing - PLUMBING1/3/2019 1/3/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing1/3/2019 1/3/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/3/2019 1/3/2019 PASS
DetailsMorgan Webb
Routing PW Street Lights1/3/2019 1/3/2019 PASS
DetailsTom Marshall
Routing PW Sewer Design1/3/2019 1/3/2019 FAIL
DetailsDeAnn Brown
Please alter sewer service connection at mainline per changemarks in eplanreview.
Intake Approval  1/2/2019 PASS
DetailsJoe Bruce
Prescreen approved by JHB
Intake Approval  12/27/2018 FAIL
DetailsJoe Bruce
1) On for #310 - Statement of Special Inspections: Select a special inspections firm on the first page and fill in the firms name and information.
2) Upload the planning and zoning letter(s) of approval into the documents folder.
3) The Architect License for Scott Henson is not valid. It has expired as of 12/15/2018. Provide valid proof that this license has been renewed prior to resubmittal of the prescreen.
4) Provide a site plan showing trash enclosures. This could not be located.
5) Sheet A6.1 is vertical. Rotate sheet so it is legible.
6) Identify the special inspections on the drawings - Sheet S0.01. Referencing form #310 does not specifically identify the required special inspections. All special inspections shall be listed including sprayed fire resistant materials per IBC section 1705.14
Application received  12/21/2018 DONE
Application submitted via PDS Online on Dec 21 2018 9:14AM