Permanent Occupancy | | | 1/24/2019 | | DONE |
|
|
|
|
BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
Tim Phone #: ###-####
|
BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | NR |
Tony Young
|
|
|
Tim Phone #: ###-####,, no inspection made,, needs f/l/s 1st
|
FIRE-Final Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | FAIL |
Jim Page
|
|
|
Provide exit signs as shown on city approved drawings. Fire extinguisher on east side of building needs to be inspected and tagged, last inspection was 2011. Provide sticker on main entry reading "Door to remain unlocked while building is occupied". Designated exit on the east side of tenant space is blocked by golf cart, designated exits need to be clear for egress.
Tim Phone #: ###-####
|
Plan assigned to (BJM) | 12/21/2018 | 12/21/2018 | 1/7/2019 | | DONE |
Brian McGowan
|
|
|
12/31 Occupancy paper
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2019 | | DONE |
Brian McGowan
|
|
|
|
Print Occupancy Form | | | 1/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/7/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/7/2019 | | DONE |
|
|
|
CAlled Michael to let know permit is ready and they can come pick them up-left message on his cell
|
Issue PAID IN FULL permit | | | 1/7/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 1/4/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 1/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | | | 12/31/2018 | | PASS |
|
|
|
|
Routing PW Environmental | 12/24/2018 | | 12/28/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 12/21/2018 | | 12/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/21/2018 | | PASS |
Brian McGowan
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/21/2018 | | DONE |
|
|
|
|
First Notice | | 2/3/2019 | | | |
|
|
|
|
First Notice | 1/23/2019 | 1/23/2019 | | | |
Brandon Shaw
|
|
|
|
Application received | | 12/21/2018 | | | |
|
|
|
|