BLD-Aging Inspection | 7/19/2019 | 7/19/2019 | 7/26/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 3/5/2019 | 3/6/2019 | 3/7/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
Zoning Approval | 3/6/2019 | 3/6/2019 | 3/6/2019 | | PASS |
KayCee Babb
|
|
|
Historic inspection complete per DRH18-00576.
|
Zoning Approval | 3/5/2019 | 3/5/2019 | 3/5/2019 | | FAIL |
KayCee Babb
|
|
|
Window modifications do not comply with DRH18-00576 and related conditions of approval.
|
FIRE-Final Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with fire alarm contractor, fire alarm system is not ready for inspection. FIR permit for fire alarms needs to be finaled before life fire safety inspection can be completed, this request is cancelled.
Tom Phone #: ###-####
|
BLD-Final | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | CANC |
Dave Hannah
|
|
|
please as late as possible and call Tom, thank you Phone #: ###-####
|
BLD-Final | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Conference | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | DONE |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. New floor framing for mech. enclosure for 2nd. floor and new interior steel stud wall for mech enclosure on 2nd. floor.
|
Inspection Record Card- Bld | | | 2/25/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/28/2018 | 12/28/2018 | 1/25/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 01/16/19 (L3 - 15 days) (ePlan - 29 sheets) The Knitting Factory (L-3)
|
Routing - PLAN CHECK | 1/23/2019 | | 1/25/2019 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 2nd review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
Christina Prado
|
|
|
Need - All met
GC Form
Revised Cert of Value
|
Issue PAID IN FULL permit | | | 1/25/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/23/2019 | | DONE |
|
|
|
|
1st review completed | | | 1/23/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/23/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/18/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/28/2018 | 12/28/2018 | 1/18/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 12/28/2018 | | 1/17/2019 | | FAIL |
Carl Westfall
|
|
|
Structural evaluation and design required
|
Routing - MECHANICAL | 12/28/2018 | | 1/8/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 12/28/2018 | | 1/2/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00576. Signed off prior to end of appeal period due to safety standards and prior fire being catalyst of project. If any appeal is filed, all work shall cease immediately until appeal process is completed.
|
Routing - PLUMBING | 12/28/2018 | | 12/31/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 12/27/2018 | | PASS |
|
|
|
|
Application received | | | 12/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2018 1:02PM
|