Second Notice | | 6/20/2019 | 6/22/2019 | | DONE |
|
|
|
This permit finaled on the web by Paul Saucerman
|
First Notice | 5/7/2019 | 5/7/2019 | 6/10/2019 | | DONE |
Mike Jordan
|
|
|
mailed 6-11
|
Letter of compliance/Occupancy | | | 5/8/2019 | | DONE |
|
|
|
|
BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Mike Jordan
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
DOC - Permit Finaled | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
Zoning Approval | 4/22/2019 | 4/22/2019 | 4/22/2019 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | NR |
Brandon Shaw
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
FIRE-Final Inspection | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | FAIL |
Jim Page
|
|
|
Two HVAC units have in-duct smoke detectors, in duct smoke detectors need to be interfaced with the fire alarm system, a permit will be required for the fire alarm modifications.
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD-Final | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | NR |
Jim Sly
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure Need all three fire inspections 1st. Notified Contractor.
|
BLD-Framing/Rough-in | 3/25/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Mike Jordan
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure. south west exterior facade and canopy framing ok. Interior franing for enclosure of riser room.
|
BLD-Framing/Rough-in | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Mike Jordan
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure. Upper exterior facade frming south east corner of building ok.
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Mike Jordan
|
|
|
Framing inspection requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure. New store front framing and new canopy framing ok.
|
(F) Reprint permit | | | 2/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2019 | | DONE |
|
|
|
|
Place hold on job | 2/1/2019 | | 2/6/2019 | | DONE |
Gemma Flores
|
|
|
DO NOT ISSUE WITHOUT BLD19-00285
|
Issue PAID IN FULL permit | | | 2/6/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 1/4/2019 | 1/4/2019 | 2/1/2019 | | PASS |
Joe Bruce
|
|
|
*(1st Rev Comp) 01/17 (L3) Vanilla Mod Pizza (Struc, PW)
|
Routing - PUBLIC WORKS | 1/25/2019 | | 2/1/2019 | | PASS |
Morgan Webb
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2019 | | DONE |
|
|
|
need Revised cert value - met
DO NOT ISSUE WITHOUT BLD19-00285
emailed applicant to inform them they need to pay for demo permit before we can issue
|
Telephone call | | | 2/1/2019 | | DONE |
|
|
|
Spoke with Jeri Olearain informing her that we need the value not only for the TI but the demo as well. Stated they didn't need demo anymore. Informed her that the permit will have to be paid for and picked up since it was requested and the C.P.R. did the work.
|
Routing PW Environmental | 1/25/2019 | | 1/31/2019 | | PASS |
Rick Christenson
|
|
|
Tenant will be required to connect to grease abatement. Tenant must submit kitchen plumbing plans for review before occupancy.
|
Routing Off Site - STRUCTURAL | 1/25/2019 | | 1/31/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 1/25/2019 | | 1/30/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 1/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 1/25/2019 | | 1/25/2019 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 1/18/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PUBLIC WORKS | 1/4/2019 | | 1/18/2019 | | PASS |
Morgan Webb
|
|
|
SHELL ONLY, REVIEW OF TI WILL DETERMINE FEES.
|
Plan resubmittals requested | | | 1/18/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with applicant via phone about comments. **JHB**
|
1st review completed | | | 1/17/2019 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/4/2019 | | 1/17/2019 | | FAIL |
Joe Bruce
|
|
|
ahj - Dave Haugland
|
Routing PW Environmental | 1/4/2019 | | 1/14/2019 | | FAIL |
Rick Christenson
|
|
|
Facility has 1500 Exterior Grease Interceptor. No kitchen plans to confirm what is connected.
|
Routing - PLAN CHECK | 1/4/2019 | | 1/14/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 1/4/2019 | | 1/9/2019 | | PASS |
Troy James
|
|
|
RTU's only
|
Routing - Design Review | 1/4/2019 | | 1/7/2019 | | FAIL |
Andrea Tuning
|
|
|
The fencing provided for the outdoor seating area shall be a maximum height of 3-feet in height.
Submit written documentation from the Boise City Clerk’s office approving the location and proposed materials of the outdoor seating area.
|
Routing - Addressing | 1/4/2019 | | 1/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 1/2/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/27/2018 | | FAIL |
Joe Bruce
|
|
|
1) Special inspections for structural steel and welding is required per IBC Section 1705.2 - Provide a form #310 with all information filled in and engineers stamp/signature.
2) List and identify special inspections for welding on the plans.
|
Application received | | | 12/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 24 2018 10:39AM
|
Routing - PLUMBING | 1/4/2019 | | 1/7/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|