First Notice | | 7/6/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
Permanent Occupancy | | | 6/26/2020 | | DONE |
|
|
|
|
BLD-Final | 6/22/2020 | 6/26/2020 | 6/25/2020 | A | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-####
|
FIRE-Final Inspection | 6/23/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. screened // Rick Phone #: ###-####
|
BLD-Wall cover | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Jim Storey
|
|
|
Screened-Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PART |
Jim Storey
|
|
|
didn''t leave contact name Phone #: ###-#### framing ok pending trades ok to insulate exterior walls
|
Print Occupancy Form | | | 3/25/2020 | | DONE |
|
|
|
|
Fees Due Hold | 3/19/2020 | | 3/19/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/19/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/18/2020 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 2/7/2020 | | 3/17/2020 | | PASS |
Michael Hanson
|
|
|
1st plan mod #2 review complete - 03/03 plan mod - Vanmark
|
Routing Off Site - STRUCTURAL | 3/5/2020 | | 3/17/2020 | | PASS |
Michael Hanson
|
|
|
Jan W. @ Stapley engineering
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
plan mod approved
|
Routing - PLAN CHECK | 2/14/2020 | | 3/3/2020 | | PASS |
Michael Hanson
|
|
|
4 hours plan mod review fee
|
Routing Off Site - STRUCTURAL | 3/2/2020 | | 3/2/2020 | | FAIL |
Michael Hanson
|
|
|
Stapley Engineering
1 hour plan mod review fee
|
Routing - MECHANICAL | 2/21/2020 | | 2/21/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/19/2020 | | 2/19/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 2/19/2020 | | 2/19/2020 | | PASS |
Candy A. Nichols
|
|
|
PLAN MOD-NO NEW PLUMBING
|
Plan Modification Accepted | | | 2/7/2020 | | DONE |
|
|
|
This plan modificationis to completely revise the office layout on the 1st floor and completely demolish the 2nd floor of the building. The first floor will still be used as office space, but with a new layout. G0000, G001, A100, A101, A102, A103, A500, M100, M101, M200, M300, E0.0, E2.0D, E2.0L, E2.0LA, E2.0MP, E2.0P, E2.0S, E3.0, E4.0, E4.1, E4.2
|
BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Jim Storey
|
|
|
call for access- Rick Phone #: ###-#### bathrooms ok to use pending signage. bigger scope of work to start soon.
|
FIRE-Final Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PART |
Troy Cobbley
|
|
|
Life safety is passed in the new restrooms at the east end of building (plan mod area). Call for access- Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Framing for restrooms only ok.
|
CHANGE STATUS TO (ISS) | | | 7/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2019 | | DONE |
|
|
|
|
Meeting | | | 6/28/2019 | | DONE |
|
|
|
sent an email asking the applicant and GC if the plan mod affected the value or not. The application does not say
|
Plan assigned to (M_H) | 6/7/2019 | | 6/27/2019 | | DONE |
Michael Hanson
|
|
|
1st plan mod review completed - 06/13 #518 L2 ePlan - plan mod
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | PASS |
Michael Hanson
|
|
|
Completed #310 form provided
|
Permit Ready to Issue | | | 6/27/2019 | | DONE |
|
|
|
PLAN MOD APPROVED
DO NO RE ISSUE
Need- Met
plan mod application doesn't state if this will change the value. If value is affect we need a revised value- emailed GC to see if value has changed
|
Routing Off Site - STRUCTURAL | 6/12/2019 | | 6/19/2019 | | PASS |
Michael Hanson
|
|
|
Per ePlan and Jan W. @ Stapley
|
Routing - PLAN CHECK | 6/12/2019 | | 6/12/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - PUBLIC WORKS | 6/12/2019 | | 6/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Route to Impact Fee Review | 6/7/2019 | 6/10/2019 | 6/10/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 6/7/2019 | | DONE |
|
|
|
Plan mod accepted changes to mens and womens restroom areas, changes to sheets A200 (new), M100, M201 (new sheet) & M301 (new sheet)-assigned to M_H plan mod started by Jon Chatfield
|
Issue PAID IN FULL permit | | | 4/11/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 3/5/2019 | | 3/14/2019 | | DONE |
Michael Hanson
|
|
|
03/15 #518 L2 ePlan, Vanmark TI
|
Routing - PLAN CHECK | 3/5/2019 | | 3/14/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 3/14/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/14/2019 | | DONE |
|
|
|
Need GC
Need Rev Value
|
Routing - PUBLIC WORKS | 3/5/2019 | | 3/6/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 3/5/2019 | | 3/6/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - MECHANICAL | 3/5/2019 | | 3/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 3/5/2019 | | 3/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 3/4/2019 | | PASS |
Joe Bruce
|
|
|
|
Intake Approval | | | 12/31/2018 | | FAIL |
Joe Bruce
|
|
|
1) Plan sheets (G001, G002, A500, and A101) do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
2) Provide connection details and calculations for the new guardrail to be installed at the stairway that meet the requirements of chapter 16 of the IBC.
|
Application received | | | 12/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 26 2018 2:29PM
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|