First Notice | | 7/20/2019 | 8/5/2019 | | DONE |
|
|
|
mailed on 8-5-2019
|
BLD-Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Jim Storey
|
|
|
Aaron Phone #: ###-####
|
Permanent Occupancy | | | 7/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/26/2019 | | |
|
|
|
|
Temporary Occupancy | 6/26/2019 | 9/24/2019 | 6/26/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Plan assigned to (JHB) | 6/25/2019 | 6/25/2019 | 6/26/2019 | | PASS |
Joe Bruce
|
|
|
06/28 Village at Columbia Clubhouse (plan mod)
|
CHANGE STATUS TO (ISS) | | | 6/26/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/25/2019 | | 6/26/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan Reviewer's activity | | | 6/26/2019 | | DONE |
Joe Bruce
|
|
|
Plan Modificaiton includes sheets A2.1, A3.0, and A5.0. Exterior finish of board and batten has been changed to wooden cedar ship lap siding.
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
PLAN MOD
|
Zoning Approval | 6/25/2019 | 6/25/2019 | 6/25/2019 | | DONE |
Andrea Tuning
|
|
|
|
Routing - Design Review | 6/25/2019 | | 6/25/2019 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 6/25/2019 | | DONE |
|
|
|
Plan mod accepted-changes to siding and outside of building-DRH19-00258 has been approved-no valuation change-assigned to Joe B-sheets A2.1, A3.0 & A5.1 are the sheets that have changed
|
BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Jim Storey
|
|
|
Alan Phone #: ###-#### temp ok pending pool hardware/ mech signoff
|
BLD-Conference | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Jim Storey
|
|
|
Allen Phone #: ###-####
|
FIRE-Final Inspection | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers will be placed in discussed locations. Final life fire safety inspection for area of work complete.
Allan Grant - Fire life/safety inspection Phone #: ###-####
|
BLD-Conference | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | DONE |
Jim Storey
|
|
|
Allen Phone #: ###-####
|
BLD-Conference | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | DONE |
Jim Sly
|
|
|
go over concrete // Allen Phone #: ###-####
|
BLD-Energy code compliance | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Storey
|
|
|
Alan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PART |
Jim Storey
|
|
|
Allen Phone #: ###-#### framing ok east end of building ok to cover pending plm
|
BLD-Framing/Rough-in | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Jim Storey
|
|
|
Alan-partial-really high roof top Phone #: ###-#### trusses ok to cover
|
Issue PAID IN FULL permit | | | 2/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/8/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 1/7/2019 | 1/7/2019 | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
*(1st Rev Comp) 01/21 (L3) Village at Columbia Clubhouse
|
Routing - PLAN CHECK | 2/6/2019 | | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 2/6/2019 | | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
AHJ - Chris Holladay
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2019 | | DONE |
|
|
|
NEED
GC
Rev cert of val
|
Routing - PLUMBING | 2/6/2019 | | 2/6/2019 | | PASS |
Daryl Spivey
|
|
|
See redline remarks for lavs and RPBP's. Install per plan and ISPC.
|
Plan resubmittals received | | | 2/6/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 1/22/2019 | 1/25/2019 | 1/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing PW Grading-Hillside | 1/7/2019 | | 1/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
1st review completed | | | 1/22/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 1/22/2019 | | DONE |
|
|
|
|
Routing - FIRE | 1/7/2019 | 1/7/2019 | 1/18/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 1/7/2019 | | 1/18/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Chris Holladay
|
Routing - PLAN CHECK | 1/7/2019 | | 1/18/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 1/7/2019 | | 1/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/7/2019 | | 1/8/2019 | | FAIL |
Daryl Spivey
|
|
|
Need more complete set of plumbing plans with detailed drawing showing connections and sizing information.
|
Routing - Erosion and Sediment | 1/7/2019 | | 1/8/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - Addressing | 1/7/2019 | | 1/7/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/7/2019 | | 1/7/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 1/7/2019 | | 1/7/2019 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 1/4/2019 | | PASS |
|
|
|
|
Application received | | | 12/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 26 2018 7:01PM
|