Permit Information
Permit NumberBLD18-04553
StatusFinaled
Name CARROLL CONSTRUCTION
Site Address 2500 E RED CEDAR LN
Project NameVillage at Columbia Clubhouse
Customer NumberDEMO BLD19-00206
ePlanReviewYes
Description
(VILLAGE AT COLUMBIA CLUBHOUSE) 06/26/2019 - PLAN MODIFICATION TO REVISE EXTERIOR FINISH FROM BOARD AND BATTEN TO CEDAR SHIP-LAPPED SIDING. **This building is not Fire Sprinklered. Permit is to remodel an existing 4,731 sq. ft. building previously remodeled under permit BLD14-00146. Approval is contingent upon adhering to the approved plans on file. Work to include: A new entry, new paint, new windows, new roofing along with interior rooms that will be modified, new plumbing/electrical fixtures, electrical work, mechanical work, plumbing work, and interior finishes in compliance with Ch. 8 of the 2015 IBC. Note: special inspection is required see attached form #310 for post installed concrete anchors. An interior demo permit has been issued under BLD19-00206 **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/20/20198/5/2019 DONE
mailed on 8-5-2019
BLD-Final7/10/20197/10/20197/10/2019PPASS
DetailsJim Storey
Aaron Phone #: ###-####
Permanent Occupancy  7/10/2019 DONE
OVERRIDE  6/26/2019  
Temporary Occupancy6/26/20199/24/20196/26/2019 DONE
DetailsTiffany Carson-Herker
Plan assigned to (JHB)6/25/20196/25/20196/26/2019 PASS
DetailsJoe Bruce
06/28 Village at Columbia Clubhouse (plan mod)
CHANGE STATUS TO (ISS)  6/26/2019 DONE
Routing - PLAN CHECK6/25/2019 6/26/2019 PASS
DetailsJoe Bruce
Plan Reviewer's activity  6/26/2019 DONE
DetailsJoe Bruce
Plan Modificaiton includes sheets A2.1, A3.0, and A5.0. Exterior finish of board and batten has been changed to wooden cedar ship lap siding.
Permit Ready to Issue  6/26/2019 DONE
PLAN MOD
Zoning Approval6/25/20196/25/20196/25/2019 DONE
DetailsAndrea Tuning
Routing - Design Review6/25/2019 6/25/2019 PASS
DetailsAndrea Tuning
Plan Modification Accepted  6/25/2019 DONE
Plan mod accepted-changes to siding and outside of building-DRH19-00258 has been approved-no valuation change-assigned to Joe B-sheets A2.1, A3.0 & A5.1 are the sheets that have changed
BLD-Final6/13/20196/13/20196/13/2019PPART
DetailsJim Storey
Alan Phone #: ###-#### temp ok pending pool hardware/ mech signoff
BLD-Conference6/11/20196/11/20196/11/2019PPASS
DetailsJim Storey
Allen Phone #: ###-####
FIRE-Final Inspection6/11/20196/11/20196/11/2019PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers will be placed in discussed locations. Final life fire safety inspection for area of work complete.

Allan Grant - Fire life/safety inspection Phone #: ###-####
BLD-Conference5/14/20195/14/20195/14/2019PDONE
DetailsJim Storey
Allen Phone #: ###-####
BLD-Conference4/30/20194/30/20194/30/2019PDONE
DetailsJim Sly
go over concrete // Allen Phone #: ###-####
BLD-Energy code compliance3/14/20193/14/20193/14/2019PPASS
DetailsJim Storey
Alan Phone #: ###-####
BLD-Framing/Rough-in3/5/20193/6/20193/6/2019APART
DetailsJim Storey
Allen Phone #: ###-#### framing ok east end of building ok to cover pending plm
BLD-Framing/Rough-in2/13/20192/14/20192/14/2019APASS
DetailsJim Storey
Alan-partial-really high roof top Phone #: ###-#### trusses ok to cover
Issue PAID IN FULL permit  2/11/2019 DONE
Print Occupancy Form  2/11/2019 DONE
OVERRIDE  2/8/2019  
Plan assigned to (JHB)1/7/20191/7/20192/8/2019 PASS
DetailsJoe Bruce
*(1st Rev Comp) 01/21 (L3) Village at Columbia Clubhouse
Routing - PLAN CHECK2/6/2019 2/8/2019 PASS
DetailsJoe Bruce
Routing Off Site - STRUCTURAL2/6/2019 2/8/2019 PASS
DetailsJoe Bruce
AHJ - Chris Holladay
PLANS/APPL TAKEN TO FRONT DESK  2/8/2019 DONE
Permit Ready to Issue  2/8/2019 DONE
NEED
GC
Rev cert of val
Routing - PLUMBING2/6/2019 2/6/2019 PASS
DetailsDaryl Spivey
See redline remarks for lavs and RPBP's. Install per plan and ISPC.
Plan resubmittals received  2/6/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review1/22/20191/25/20191/23/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing PW Grading-Hillside1/7/2019 1/22/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
1st review completed  1/22/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  1/22/2019 DONE
Routing - FIRE1/7/20191/7/20191/18/2019 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL1/7/2019 1/18/2019 FAIL
DetailsJoe Bruce
AHJ - Chris Holladay
Routing - PLAN CHECK1/7/2019 1/18/2019 FAIL
DetailsJoe Bruce
Routing - MECHANICAL1/7/2019 1/11/2019 PASS
DetailsTroy James
Routing - PLUMBING1/7/2019 1/8/2019 FAIL
DetailsDaryl Spivey
Need more complete set of plumbing plans with detailed drawing showing connections and sizing information.
Routing - Erosion and Sediment1/7/2019 1/8/2019 PASS
DetailsMichael Zawacki
Waiver request approved.
Routing - Addressing1/7/2019 1/7/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/7/2019 1/7/2019 PASS
DetailsMorgan Webb
Routing - Design Review1/7/2019 1/7/2019 PASS
DetailsAndrea Tuning
Intake Approval  1/4/2019 PASS
Application received  12/26/2018 DONE
Application submitted via PDS Online on Dec 26 2018 7:01PM