Permit Information
Permit NumberBLD18-04580
StatusFinaled
Name HC COMPANY INC
Site Address 12601 W EXPLORER DR
Project NameBrighton Plaza
Customer Number 
ePlanReviewYes
Description
(BRIGHTON PLAZA – 1st & 2nd FLOOR – COMMON AREA RESTROOMS) Permit is to remodel existing common areas to create (4) additional accessible restrooms and a shower room. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select acoustic suspended ceiling, removal of select plumbing fixture, construction of interior non-bearing walls to create (2) single user accessible restrooms on the 1st floor, (2) single user accessible restrooms on the 2nd floor and an accessible shower on the 2nd floor, select new door/door frames, select new gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fire sprinklered for area increase and 1-hour substitution. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fees Due Hold7/31/2019 9/16/2019 DONE
DetailsTiffany Carson-Herker
DOC - Permit Finaled  9/16/2019 DONE
Per passing BLD Final inspection on 7/30/19 done by 490
BLD-Final7/30/20197/30/20197/30/2019PPASS
DetailsTell Riley
Call Jon Craft Phone #: ###-#### Inspection requested via web by Jonathan Craft//final complete//
FIRE-Final Inspection7/30/20197/30/20197/30/2019APASS
DetailsTroy Cobbley
life safety passed

Call Jon Craft Phone #: ###-#### Inspection requested via web by Jonathan Craft
Print Statement  7/30/2019 DONE
BLD-Wall cover6/10/20196/10/20196/10/2019PPASS
DetailsTell Riley
Call Jon Craft 30 minutes prior please. Phone #: ###-#### Inspection requested via web by Jonathan Craft,, ok to cover framing.
BLD-Framing/Rough-in6/6/20196/6/20196/6/2019PPASS
DetailsMike Jordan
John Phone #: ###-####. Interio steel stud framed walls ok, hardkids ok pending fire sprinkler rough in inspection. 2nd floor restrooms.
BLD-Wall cover6/5/20196/5/20196/5/2019PFAIL
DetailsMike Jordan
John Phone #: ###-####. Needs sprinkler and plumbing rough inspection. Install ADA backing.
Issue PAID IN FULL permit  5/6/2019 DONE
Inspection Record Card- Bld  5/6/2019 DONE
Route to Impact Fee Review1/8/20191/11/20191/8/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)1/4/20191/4/20191/8/2019 PASS
DetailsJavier Guzman
1/08 L1 Brighton Plaza New Toiletrooms ePlan
Routing - PLAN CHECK1/4/2019 1/8/2019 PASS
DetailsJavier Guzman
1st review completed  1/8/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/8/2019 DONE
Permit Ready to Issue  1/8/2019 DONE
MET: Jthomas@Hcco-inc.com

NEED
GC form from HC Company
Routing - Addressing1/4/2019 1/4/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/4/2019 1/4/2019 PASS
DetailsMorgan Webb
Intake Approval  1/4/2019 PASS
DetailsJavier Guzman
Application received  12/30/2018 DONE
Application submitted via PDS Online on Dec 30 2018 9:15AM
Routing - PLUMBING1/4/2019 1/7/2018 PASS
DetailsDaryl Spivey
See Red line notes. Per plan and ISPC.