BLD-Final | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//corrections made//final complete//
|
DOC - Permit Finaled | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | CANC |
Tell Riley
|
|
|
2.88 ACH 50
|
BLD-Final | 6/22/2020 | 6/23/2020 | 6/23/2020 | P | NR |
Tell Riley
|
|
|
David Phone #: ###-####//CN posted//still an active ele permit//need mechanical final//need blower door test completed and post results//please provide city approved plans and documents//
|
BLD-Aging Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | PASS |
Tell Riley
|
|
|
wip
|
BLD-Energy code compliance | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PART |
Tell Riley
|
|
|
David Phone #: ###-####//need trus engineering for cut truss//add truss bracing per truss plans//ok to insulate only//
|
BLD-Wall Bracing | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Tell Riley
|
|
|
Dave Phone #: ###-####//add shear blocks where noted//nailing ok//add shear at truss heels per plans--will check at framing//exterior walls only//
|
BLD-Footing | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//setbacks and footings ok per plans///
|
Issue PAID IN FULL permit | | | 5/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/22/2019 | | DONE |
|
|
|
called to let know permit I sready and how much is owed-left message on phone
|
OVERRIDE | | | 2/21/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/12/2019 | | 2/21/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 12/31/2018 | | 2/21/2019 | | DONE |
Michael Hanson
|
|
|
01/11 #402 L1 Paper. 2nd review completed - Emailed applicant requesting phone call or meeting with designer for wall bracing. MDH
|
Plan resubmittals received | | | 2/21/2019 | | DONE |
|
|
|
Two copies of sheet 5 of 8. Four copies of braced wall line length calcs. taken to michael
|
Case Summary (BLD) | | | 2/21/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/21/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 2/19/2019 | | DONE |
Michael Hanson
|
|
|
Discussed path forward for wall bracing with Dave Rauscher. Dave will revise and provide 2 full size sheets and new calculations through David Elcox.
|
Routing - PLAN CHECK | 1/7/2019 | | 2/12/2019 | | FAIL |
Michael Hanson
|
|
|
Emailed applicant requesting phone call or meeting with designer on wall bracing.
|
Plan resubmittals received | | | 2/12/2019 | | DONE |
|
|
|
Resubmittals received 2 sets of sheets 1-8-took to M_H
|
Routing - PLANNING | 2/12/2019 | | 2/12/2019 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 1/10/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | | | 1/7/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | | | 1/3/2019 | | FAIL |
Michael Hanson
|
|
|
See emailed building review for corrections required. MDH
|
Route to Impact Fee Review | 12/31/2018 | 1/3/2019 | 1/2/2019 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - Addressing | 12/31/2018 | | 1/2/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/2/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/31/2018 | | DONE |
|
|
|
|
Intake Approval | | | 12/31/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/31/2018 | | DONE |
|
|
|
|
Application received | | 12/31/2018 | | | |
|
|
|
|
Routing - PLANNING | 1/3/2019 | | | | FAIL |
|
|
|
15 foot street side yard setback required
|