Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00006
StatusFinaled
Name EMPIRE SOLAR GROUP LLC
Site Address 6938 W FREEMONT ST
Project NameGordon and Diana Brower
Customer Number 
ePlanReviewYes
Description
Permit to install a 7.13 kW, 405 sq. ft. (Empire Solar Group) Roof Mounted Grid Tied Solar Panel System with micro-inverters and optimizers; 23 panels in 2 arrays tying into existing panel. No structural alteration is required per stamped and signed engineer’s evaluation letter. All work per plans, manufacturer's specs, engineering and local code. Separate electrical permit required. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference1/17/20191/18/20191/18/2019PDONE
DetailsMike Jordan
Adam Jr Phone #: ###-####
DOC - Permit Finaled1/18/20191/18/20191/18/2019PPASS
DetailsMike Jordan
(F) Reprint permit  1/17/2019 DONE
Change Expiration Date Only  1/16/2019 DONE
reissued by mistake on 1/14/19. changed back to original exp date from issuance
Plan assigned to (RDP)1/11/20191/11/20191/15/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  1/15/2019 DONE
plan mod approved do not re issue
CHANGE STATUS TO (ISS)  1/15/2019 DONE
change status to ISS- reissued by mistake, fees paid for the plan mod
(F) Reprint permit  1/15/2019 DONE
Telephone call  1/15/2019 DONE
emailed Tisha to remove the issued transaction from 1/15 since it was issued on 1/3/19
Routing - PLAN CHECK1/14/2019 1/15/2019 PASS
DetailsRob Patrick
Add 1 hour charge for review time.
Routing - PLANNING1/14/2019 1/14/2019 PASS
DetailsSue Cummings
passed again
Plan Modification Accepted  1/11/2019 DONE
plan mod-changing panels that were orig on drawings
Intake Approval  1/11/2019 FAIL
need to upload new drawings with the exact same name as the old drawings. ePlan will automatically add v2.
Plan assigned to (RDP)1/2/20191/2/20191/3/2019 DONE
DetailsRob Patrick
Routing - PLAN CHECK1/2/2019 1/3/2019 PASS
DetailsRob Patrick
1st review completed  1/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  1/3/2019 DONE
Issue PAID IN FULL permit  1/3/2019 DONE
CHANGE Issued DATE  1/3/2019 DONE
Application received  1/2/2019 DONE
Application submitted via PDS Online on Jan 2 2019 9:39AM
Plan assigned to (JAB) Josh1/2/20191/2/20191/2/2019 DEFR
DetailsJosh Bogle
Routing - PLANNING1/2/2019 1/2/2019 PASS
DetailsColleen T Carroll
Plans ACCEPTED BY PLAN TECH  1/2/2019 DONE
Intake Approval  1/2/2019 PASS
Recd Pcfee & Taken To Pln CK  1/2/2019 DONE