BLD-Framing/Rough-in | 7/31/2020 | 7/31/2020 | 7/31/2020 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by James Jewett// ok to insulate,, needs one more fire sprinkler inspection// truss braces, point load
|
Fees Due Hold | 6/30/2020 | | 7/31/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/26/2020 | | DONE |
|
|
|
Work flow requested to be opened for new Manual J
|
Routing - MECHANICAL | 6/26/2020 | | 6/26/2020 | | PASS |
Troy James
|
|
|
plan mod Man J
|
BLD-Wall Bracing | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by James Jewett// exterior ok
|
BLD-Aging Inspection | 8/21/2019 | 8/21/2019 | 8/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/20/2019 | 8/20/2019 | 8/22/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 4/5/2019 | 4/8/2019 | 4/8/2019 | A | PASS |
Tony Young
|
|
|
Jerad Phone #: ###-####
|
BLD-Foundation | 4/5/2019 | 4/5/2019 | 4/8/2019 | P | PART |
Tony Young
|
|
|
Jared; Phone #: ###-####
|
BLD-Footing | 3/29/2019 | 4/1/2019 | 4/1/2019 | P | PART |
Tony Young
|
|
|
Jared Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 3/28/2019 | 3/28/2019 | 3/28/2019 | | DONE |
Melissa Jannusch
|
|
|
*Footings for new residence* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 3/20/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2019 | | DONE |
|
|
|
spoke with jim about either doing a plan mod or resubmittal. he stated he wanted to talk to michael first to see how long it would take with either or and get back to me. 10:30am
|
Plan assigned to (J_N) | 1/7/2019 | 1/7/2019 | 1/24/2019 | | DONE |
Jenny Nelson
|
|
|
01/24 sfd L2 ePlan. 2nd review 1/24 provide wui soffit detail. 1st complete 1/8, provide wui soffit detail, specify siding for wui, clarify structural calculations for shear and foundation.
|
Routing - PLAN CHECK | 1/24/2019 | | 1/24/2019 | | FAIL |
Jenny Nelson
|
|
|
WUI soffit detail needed
|
Routing - PLANNING | 1/24/2019 | | 1/24/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 1/24/2019 | | 1/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/24/2019 | | DONE |
|
|
|
jimj@jljinc.net
|
Routing - Erosion and Sediment | 1/7/2019 | | 1/17/2019 | | PASS |
Michael Zawacki
|
|
|
VOID. ESC permit coverage and ESC site plan approved previously under ESC18-01527
|
Routing PW Grading-Hillside | 1/7/2019 | | 1/17/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
A representative of Boise Public Works shall verify the connection of the roof drains to the storm drain stubout through a cleanout placed at the connection point. This shall include a test of the system by running water into a roof drain leader and verifying that it is being discharged into the storm drain in the street; or a similar method acceptable to the City. Call ###-#### for an inspection.
|
1st review completed | | | 1/17/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - FIRE | 1/7/2019 | 1/7/2019 | 1/9/2019 | | PASS |
Lee G Meredith
|
|
|
New SFH
|
Routing - MECHANICAL | 1/7/2019 | | 1/9/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 1/7/2019 | 1/10/2019 | 1/8/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 1/7/2019 | | 1/8/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Intake Approval | | | 1/7/2019 | | FAIL |
|
|
|
Failed: need to update site plan to include entire property boundary and how the home lies on it; need to upload checklist; need RESCheck or ERI
|
Intake Approval | | | 1/7/2019 | | FAIL |
|
|
|
Second Prescreen: did not submit filled out form #404
|
Plans ACCEPTED BY PLAN TECH | | | 1/7/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/7/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/7/2019 | | PASS |
|
|
|
|
Routing - Addressing | 1/7/2019 | | 1/7/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/7/2019 | | 1/7/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 1/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 2 2019 9:53AM
|
Routing - PLANNING | 1/7/2019 | | | | FAIL |
Leon Letson
|
|
|
Public pathway must be shown on site plan.
|