BLD-Other | 6/5/2019 | 6/7/2019 | 6/7/2019 | A | PEND |
Brandon Shaw
|
|
|
Second layer and caulking...
|
BLD-Other | 6/4/2019 | 6/5/2019 | 6/6/2019 | P | NR |
Jim Storey
|
|
|
Soffit inspection for fire rock and fire x t;G. Phone #: ###-#### Inspection requested via web by Shon Miles need light and spk protection
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | CANC |
Brandon Shaw
|
|
|
Adjusted and approved plan is on-site. Phone #: ###-#### Inspection requested via web by Shon Miles
|
BLD-Framing/Rough-in | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | CANC |
Brandon Shaw
|
|
|
Tyler Phone #: ###-####
|
BLD-Concrete | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Brandon Shaw
|
|
|
rebar- Mark Phone #: ###-####
|
BLD-Foundation | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | FAIL |
Brandon Shaw
|
|
|
Need Geo sub-grade submitted and approved by PW...
|
PubWorks Subgrade Approval | 3/6/2019 | 3/6/2019 | 3/6/2019 | | DONE |
Melissa Jannusch
|
|
|
POOL ONLY not pergola. A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. An inspection may now be scheduled with the Building Department.
|
Issue PAID IN FULL permit | | | 2/13/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/15/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 1/2/2019 | 1/2/2019 | 1/15/2019 | | PASS |
Josh Bogle
|
|
|
1/8 pool, paper - 1st done
|
Telephone call | | | 1/15/2019 | | DONE |
|
|
|
called Shon to let know permit is ready-that we need the RP and what the fees are
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/15/2019 | | DONE |
|
|
|
met need RP
|
Routing PW Grading-Hillside | 1/14/2019 | | 1/14/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 1/14/2019 | | 1/14/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLAN CHECK | 1/14/2019 | | 1/14/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/2/2019 | | 1/8/2019 | | FAIL |
Josh Bogle
|
|
|
good for Building Plan Review, need Geotech for Hillside
|
1st review completed | | | 1/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 1/2/2019 | | 1/7/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - PUBLIC WORKS | 1/7/2019 | | 1/7/2019 | | FAIL |
Angela Hardy
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing PW Grading-Hillside | 1/2/2019 | | 1/7/2019 | | FAIL |
Melissa Jannusch
|
|
|
Need 2 copies of geotechnical engineering report
|
Routing Walk-In (BLD) | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two for other departmental reviews
|
Routing Walk-In (Zoning) | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | DONE |
Sue Cummings
|
|
|
|
Application received | | 1/2/2019 | | | |
|
|
|
|