BLD-Final | 8/19/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/19/2019 | 8/26/2019 | 8/26/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.28
|
BLD-Energy code compliance | 6/17/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 6/13/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Dave Hannah
|
|
|
Alalviro Phone #: ###-####
|
PubWorks Subgrade Approval | 1/22/2019 | 1/22/2019 | 1/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Override - Parcel Holds | | | 1/22/2019 | | |
|
|
|
|
OVERRIDE | | | 1/15/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 1/4/2019 | 1/4/2019 | 1/15/2019 | | DONE |
Rob Patrick
|
|
|
1/11 sfd L1 ePlan...1/9 Failed; Foundation Corrections Required
|
Routing - PLAN CHECK | 1/15/2019 | | 1/15/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2019 | | DONE |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 1/15/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 1/15/2019 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/15/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/15/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/15/2019 | | DONE |
|
|
|
|
1st review completed | | | 1/9/2019 | | FAIL |
Rob Patrick
|
|
|
Foundation Corrections Required
|
Routing - PLAN CHECK | 1/4/2019 | | 1/9/2019 | | FAIL |
Rob Patrick
|
|
|
Foundation Corrections Required
|
Route to Impact Fee Review | 1/4/2019 | 1/7/2019 | 1/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 1/4/2019 | 1/4/2019 | 1/4/2019 | | PASS |
Lee G Meredith
|
|
|
Review passed. Sprinklers not required.
|
Routing - PUBLIC WORKS | 1/4/2019 | | 1/4/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 1/4/2019 | | 1/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/4/2019 | | 1/4/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/4/2019 | | 1/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2019 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/4/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/4/2019 | | PASS |
|
|
|
|
Application received | | | 1/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 2 2019 1:32PM
|